  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    Determination of the Transition Point from Open Pit to Underground Mining

    By A K. Ghosh, J Chung, E Topal, M Asad

    "Many open pit (OP) mines with considerable vertical extent are approaching the end of their life-of-mine; some of them are seeking the opportunity to make the transition from OP to underground (UG) m

    Nov 15, 2016

  • AUSIMM
    Getting the Most out of Technology to Drive Mine Productivity Improvements

    By K Sommerville, J Parkinson

    "Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c

    Nov 15, 2016

  • AUSIMM
    Adapting to Geotechnical Change – a Case Study of the Carina Open Pit Mine

    By R Jaine, D Strang, M Fowler

    "This paper presents a case study demonstrating active geotechnical pit slope management at the now completed Carina Iron Ore Project operated by Mineral Resources Ltd (MRL). The site is located 105 k

    Nov 15, 2016

  • AUSIMM
    Controlling Blast Related Fumes with Unconventional Explosives

    By J Rock, K Bambrook

    "Hanwha Mining Services was approached by Glencore Coal to provide a series of (trial) demonstration blasts at its Clermont coalmine. The intent of the project was to trial a bulk explosive product th

    Nov 15, 2016

  • AUSIMM
    Optimisation Improvements for Narrow Vein Open Pit Deposits Using Mineable Shape Optimiser

    By C Mann, S Swapp

    "The mining industry is often challenged with the task of evaluating narrow vein open pit deposits. A realistic mineable solution from optimisation needs to accurately represent mining dilution and th

    Nov 15, 2016

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin Coalmine

    By A K. Ghosh

    "Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an

    Nov 15, 2016

  • AUSIMM
    Innovative Approach to Open Pit Edge Protection

    By N Redwood, N Fowkes, A Bassom, S Durkin

    "It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat

    Nov 15, 2016

  • AUSIMM
    A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation

    By B Reid

    "Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This

    Nov 15, 2016

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • AUSIMM
    A 3D Discrete Event Simulation Model of a Truck-shovel Network System

    By W Zeng, D Walker, D Cai, E Baafi

    "The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv

    Nov 15, 2016

  • AUSIMM
    A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine

    By M Brockman, M Cowan, A Robeson

    "Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and

    Nov 15, 2016

  • AUSIMM
    Getting Accurate Mine Information to the Right Teams to Drive Production Improvement

    By T Elms, R Beckman, M Sampson

    "In today’s mining industry, the pressure of reducing costs and increasing production while maintaining high safety standards is at the forefront of operational endeavours. A combination of specific m

    Nov 15, 2016

  • AUSIMM
    Measuring the Effectiveness of Change through Best Practice Reconciliation

    By G Pattenden, R Hargreaves, P Pettit

    "Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera

    Nov 15, 2016

  • AUSIMM
    Justifying Slope Design Risks and Costs

    By N M. Player, R P. Varden, E Jones

    "An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t

    Nov 15, 2016

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • IIMP
    Plata y platería pre hispánica

    By Jorge Olivari Ortega

    "La plata fue un metal de apreciado valor para las sociedades pre-hispánicas -en tanto los mineros lo obtenían de forma pura y se beneficiaban como metales argentíferos. En ese sentido, el presente

    Nov 1, 2016