Search Documents

Sort by

  • AUSIMM
    Integrating Blastholes into Exploration Data to Improve Coal Recovery and Modelling

    By H Stedman

    Integrating exploration and operational blastholes into one database significantly enhances geological modelling. Benefits include: improved coal predictions, stronger interpretation of structurally c

    Aug 18, 2014

  • AUSIMM
    Improvement of Existing Ore-forming Models Due to Systematic Sampling During Mining – An Example from Kambalda, Western Australia

    By C Laming, S Staude, D Hammond, S Sheppard, J Griffith, S Stanfield, S Marriott

    Long Operations is located on the eastern slope of the Kambalda Dome in Western Australia. Kambalda hosts nickel deposits that are modelled to have formed from an exsolving sulfide melt from a parenta

    Aug 18, 2014

  • AUSIMM
    Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam Deposit

    By M K. Kapo, S C. Nzama

    The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte

    Aug 18, 2014

  • AUSIMM
    Resources versus Reserves – Towards a Systems-based Understanding of Exploration and Mine Project Development and the Role of the Mining Geologist

    By J P. Sykes, A Trench

    "World-class mine projects are increasingly failing to become world-class mines. Non-technical, socio-political and environmental problems seem, in part, to be the cause. However, the intangible and q

    Aug 18, 2014

  • AUSIMM
    A Mapping-based Approach to Geological Continuity Prediction Using Examples from the Balmat-Edwards-Pierrepont Zinc District, St Lawrence County, New York, USA

    By R H. Knight

    Uncertainty in prediction and modelling of geological (physical) ore continuity in geometrically complex ore deposits is a key risk factor in mining. Reducing geometric uncertainty of hard-boundary or

    Aug 18, 2014

  • AUSIMM
    Remodelling the Purnama Deposit – An Interpretation Case Study from G-Resources Martabe Project, Indonesia

    By A N. Kusnanto, D Sims, L Henim, S Crispin, J Hertrijana

    The high sulfidation Purnama Au-Ag deposit located on the Indonesian island of Sumatra entered production in mid-2012 following a two-year program of construction and development. Discovered in 1997 f

    Aug 18, 2014

  • AUSIMM
    Rapid Resource Modelling – A Vision for Faster and Better Mining Decisions

    By P F. Hodkiewicz

    "Our understanding of mineral resources relies on three basic steps: data capture data interpretation model construction. Until recently, all three of these steps required significant time and ma

    Aug 18, 2014

  • AUSIMM
    Effective Domain Selection for Grade Control in Narrow Vein Gold Deposits

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    Effective domaining is fundamental to geostatistical modelling for grade control. Through analysis of lithological, structural and alteration logging data, effective groupings (domains) can be identif

    Aug 18, 2014

  • AUSIMM
    A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring Locations

    By J Loeb, D Thornton

    Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste

    Aug 18, 2014

  • AUSIMM
    Modelling Blast Movement for Grade Control at an Open Cut Gold Mine

    By E J. Sellers, A Cocker

    Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref

    Aug 18, 2014

  • AUSIMM
    Ore Block Design in Narrow Vein Gold Deposits – Estimate or Simulate?

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    In narrow orebodies the use of ordinary kriging (OK) may pose certain limitations when used for grade control modelling. The smoothing effect of kriging, by its very nature, cannot retain or accuratel

    Aug 18, 2014

  • AUSIMM
    Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the Congo

    By M G. Millad, M Zammit

    The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa

    Aug 18, 2014

  • AUSIMM
    Mines versus Mineralisation – Deposit Quality, Mineral Exploration Strategy and the Role of ‘Boundary Spanners’

    By J P. Sykes, T C. McCuaig, J E. Vann

    Resources added to the global metal inventory through exploration over the past 15 years have been generally of poor quality (declining grades, recoveries and lack of acceptable financial return). Sim

    Aug 18, 2014

  • AUSIMM
    Cook Open Pit Model – The Hurdles: How We Leapt, Lunged, Stumbled and Overcame Them

    By J Paradis, K Dudgeon, M Topping

    At Newmont’s Jundee Operation, exploration and resource geologists collaborated to produce an open pit resource model. Using a variety of modelling and estimation techniques but no new data, an unecon

    Aug 18, 2014

  • AUSIMM
    Grade Estimation from Radial Basis Functions – How Does it Compare with Conventional Geostatistical Estimation?

    By P F. Hodkiewicz, J de Lacey, M Stewart, R Lane

    "Implicit modelling is an approach to spatial modelling in which the distribution of a target variable is described by a unique mathematical function that is derived directly from the underlying data

    Aug 18, 2014

  • AUSIMM
    Geologists and the Value Chain – How Material Characterisation by Modern Mineralogy can Optimise Design and Operation of Processing Facilities

    By K Ehrig, C Lower, V Liebezeit, M Smith, E Macmillan

    "Minerals, minerals, minerals. Elements occur in the earth as minerals. If local physical, chemical and structural conditions are conducive to concentrating these minerals to sufficiently high abundan

    Aug 18, 2014

  • AUSIMM
    Matching Brown Coal to the Next Generation of Latrobe Valley Projects

    By G Love, S Maher

    In Victoria’s onshore Gippsland Basin, geology is driving brown coal developments, and geologists are key decision-makers. Prompted by volatile energy prices and the likelihood of a carbon constrained

    Aug 18, 2014

  • AUSIMM
    Universal Reconciliation – A Multidisciplinary Approach across the Entire Mining Value Chain to Identify Loss of Value and Maximise Operational Performance

    By R Hargreaves, C Morley

    The authors often see problems on mine sites that are due to insufficient feedback between technical discipline silos as the realities on the ground fail to inform the models and plans used to drive r

    Aug 18, 2014

  • AUSIMM
    The Future of the Global Mining Sector

    By T Goldsmith

    The mining industry is cyclical, but those are more than normal business cycles. In the early 2000s the industry saw the start of China as a game changer for the mining industry which lead to catch ph

    Aug 18, 2014

  • AUSIMM
    Risk Associated with Rock Type Prediction using Simulation Techniques

    By L W. Palmer

    "Evaluating the geological risk associated with ore deposits is becoming common practice in the mining industry. While geostatistical simulation is a useful tool for evaluating this risk, the effect o

    Aug 18, 2014