Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Measurements and Modelling of Evaporation from Abandoned Mine Pit Lakes

    By T van Niel, M Trefry, B Baker, I Rea, A Hawdon, D McJannet, D Boadle, R Fandrich, A Littleboy

    Many open cut mines extend to depths well below the natural water table level with constant dewatering required to maintain operations. When mining activities cease the groundwater starts to fill the

    Jun 28, 2016

  • AUSIMM
    The Installation of a Final Cleaning Column at Ok Tedi

    By Kilgour I

    The installation of a final cleaning column at Ok Tedi Mining Limited was carried out to increase final concentrate grade in order to reduce concentrate handling, shipping and treatment charges and

    Jan 1, 1991

  • AUSIMM
    Production of molybdenum disilicide using a silicon-containing molten bath via the hot dipping method

    By H Fukaya T Miki, J Gamutan

    Molybdenum disilicide (MoSi2) is a promising material for thermal applications due to its excellent heat and oxidation resistance. It can operate at temperatures of up to 1800°C as furnace heating ele

    Jun 19, 2024

  • AUSIMM
    Inverstigations of Material Distribution and Permeability-Improvement of the Permeability of No. 7 Blast Furnace

    By Flierman GA, Van Toor CH

    Investigations were carried out of burden distribution using a full scale model of the furnace top. Various charging sequences were used and large differences were found between ore charged as sinter

    Jan 1, 1975

  • AUSIMM
    Network Optimisation of Underground Mine Design

    By D H. Lee, J F, J H. Rubinstein

    This paper examines the problem of optimising the life-of-mine costs of an underground mine, focussing particularly on the costs associated with the underground development needed to provide access t

    Jan 1, 2000

  • AUSIMM
    Paper No. 194. Geology of The Broken Hill Lode.

    By Voss Smith F, Matters C. W, Slee R. T, Coldham JC, Davies HW, Wallman H. H

    The Committee desires to thank the managers of the various mines along the line of lode for their hearty co-operation in its labours. It would also extend thanks to Messrs. J. O. Moulden, Howchin, Twe

    Jan 1, 1911

  • AUSIMM
    Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil Waterways

    By M D. Melville, B C. T Macdonald, T D. W

    The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T

    Jan 1, 2003

  • AUSIMM
    The Application of Hydraulic Stowing Partially Deslimed Mill Residue in Stopes at Broken Hill South Limited (34d64f53-9747-4881-ab11-c0a50efcc88b)

    The South Mine, property of Broken Hill South Limited, is situated at Broken Hill, NSW, Australia, towards the southern end of the main lode. The leases (MLs 7 and 8) cover a length of 2400 feet along

    Jan 1, 1994

  • AUSIMM
    Reopening the Golden Mile

    By Cleghorn JH

    Underground mining operations on Kalgoorlie's Golden Mile were suspended in 1976, suffering the combined effects of low gold prices and grades. A subsequent substantial increase in the gold price

    Jan 1, 1984

  • AUSIMM
    How Advances in Pyrometallurgical Treatment of Copper and Nickel Sulphide Have Added Value to the Non Ferrous Metal Industry

    Almost from the beginning of civilisation the inhabitants hadlearned the art of recovering and working copper to produceitems which were of use to society.From the early beginnings of the use of coppe

    Jan 1, 1995

  • AUSIMM
    Estimation of Regional Stress State and Young’s Modulus of Ground at Torigatayama Limestone Mine in Japan

    By D Fukuda, K Kaneko, R Kudo, J Kodama, Y Fujii, T Sasaki

    "Estimation of stress state as well as elastic modulus is important for the prediction of a rock slope deformation in an open pit mine since it can strongly influence the mining-induced deformation of

    Nov 5, 2014

  • AUSIMM
    A Mine Planning Model to Satisfy Long-Term Grade Targets

    By M Rimes

    This paper describes a technique to predict achievable head grades and likely variances from target grade for the Shovelanna Iron Ore Project, in the Pilbara region of Western Australia. The block mod

    Jan 1, 2007

  • AUSIMM
    The Challenges for Mining Posed by Emerging Water Protection Legislation in Former Soviet Union Countries

    Mining projects have long since presented challenges for the protection of the water environment. Lessons learnt from historical pollution incidents and increasingly stringent environmental controls h

    Jan 1, 2006

  • AUSIMM
    Innovations in underground hard rock operator efficiency – through simulation-based training technologies and processes

    By J A. de la Torre, I R. Cerna, G K. Karadjian

    The La Colorada underground mine in Zacatecas, Mexico is a mechanised cut-and-fill silver mine with a capacity of 1250 t/d. The project focused on training the mine’s experienced operators for a fleet

    Oct 16, 2017

  • AUSIMM
    A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine Planning

    Mine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a

    Dec 6, 2010

  • AUSIMM
    Case Study - The Mogiana Quarry Reclamation

    This article presents a proposal for the rehabilitation of the mined area of the Mogiana quarry. The Mogiana quarry produces material used in civil construction and is situated in the Brazilian State

    Dec 6, 2010

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir George Fisher, C.M.G

    ADDRESS BY THE PRESIDENT OF THE INSTITUTE (MR. C. H. MARTIN) IN PRESENTING THE CERTIF1CATE TO SIR GEORGE FISHER, C.M.G.Members of The Institute, distinguished guests, of which there are many, ladies a

    Jan 1, 1976

  • AUSIMM
    Managing the Transition from Exploration to Feasibility and Project Development

    The transition from exploration to feasibility is a stage in the development of mineral resource projects that is frequently not handled well. The transition marks a point in the project development p

    Jan 1, 2004

  • AUSIMM
    Lead Smelting at Sulphide Corporation Ltd.'s Cockle Creek Works

    THIS paper is not intended to be a detailed description of the lead, smelting plant at Cockle Creek, as this has been covered in previous papers for the Institute in 1918, Proceedings No. 31, by other

    Jan 1, 1923

  • AUSIMM
    Cost Control in Project Development

    In order to achieve optimum results for money spent in construction of new projects there is a need for mining developers to pay greater attention to cost control. Control is achieved by establish

    Jan 1, 1983