Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Excavating an Underground Primary Fan Chamber that is Adjacent to a Fully Operational Primary Fan in PT Freeport Indonesia's Grasberg Block Cave Mine

    By P Wahyono, H Vega, S Riza, P Vergara, P Gonzalez-Carbonell

    PT Freeport Indonesia (PTFI), operating in the Ertsberg Mining District in the Province of Papua, is developing the Grasberg Block Cave copper-gold mine. The site aims to output 160 000 t/d and will b

    Jul 1, 2013

  • AUSIMM
    Effect of Mineral Density for Milling Magnetite Ores

    By P Holtham, W Valery, P Baguley, A Jankovic

    There is a growing interest in magnetite ores because of the increasing demand for this commodity. With these ores, there is significant cost associated with milling the ore to fine sizes using ball m

    Jul 13, 2015

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Toe angle measurement for SAG mill control at Lihir gold mine

    By M Randall, P Ebzery, F Burns, C Aisthorpe, P Blanz

    SAG Mill process control classically maintains the SAG mill volumetric filling within a set operating range. Typically a SAG mill weight measurement, by either bearing pressure transducers or load cel

    Aug 29, 2018

  • AUSIMM
    Plan Implementation ù How Communication Impacts on Securing Organisational Success in the 21st Century

    By W Roy

    When it comes to plan implementation and securing success in organisations in the 21st century, if there was such a thing as the secret to success it would be effective communication. Commoditisation

    Jan 1, 2006

  • AUSIMM
    Water Production Simulation Tool for Coal Seam Gas Operations in Bowen and Surat Basins

    By R Strand, L Reading, G Keir

    A major challenge in managing coal seam gas (CSG) water is predicting how much water will be produced as the industry develops. Klohn Crippen Berger Ltd (KCB) was commissioned by the Queensland Depart

    Nov 26, 2013

  • AUSIMM
    Using Geometallurgy during Process Optimisation Activities at the Southern Middleback Ranges Magnetite Concentrator

    By D Olwagen, C Stanton, J Gerber

    From December 2013 to February 2014 the Southern Middleback Ranges magnetite concentrator went through a successful optimisation process that included the installation of extra grinding power to treat

    Jul 13, 2015

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Realisation of Value through Identification of Various Oxidation Fronts and Mineralisation Styles at Trilogy Cu-Au-Ag-Pb-Zn Deposit

    By B Armstrong

    The Proterozoic poly-metallic Trilogy deposit was discovered in 1997, and until recently, mining evaluation was stalled due to poor metallurgical performance. Unlocking the substantial economic value

    Sep 5, 2011

  • AUSIMM
    Developments in Processing to Match Future Mining Opportunities

    By S La Brooy, C Fountain

    Throughout its history the mining industry has focused on the highest-grade deposits sited in the most convenient locations. The burgeoning global population and higher standards of living not only in

    Jan 1, 2008

  • AUSIMM
    Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator

    Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated

    Oct 29, 2012

  • AUSIMM
    The Mabilo Copper-gold-iron Deposit – A New Skarn Discovery in the Philippines

    By G Maude, R Ayres, R N McLean, N A. Reynolds

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Mabilo copper-gold-magnetite skarn deposit is located in southern Luzon in the Paracale

    Mar 18, 2015

  • AUSIMM
    Getting it right from the beginning – ESG in mineral exploration

    By L H. G McClean

    Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from

    Sep 1, 2024

  • AUSIMM
    Has there been progress on nano Diesel Particulate Matter in the Australian underground hard rock industry?

    By C W. Davis

    Every diesel engine emits approximately 100 million nano diesel particles (nDP) per cubic centimetre of raw exhaust. Each nDP has a diameter of between 50 and 70 nano metres or 1/100th the size of red

    Mar 15, 2021

  • AUSIMM
    Applications of Fine Screens in Grinding Circuits

    By J E. Wheeler, S B. Valine, L G. Albuquerque

    It has long been known that closed circuit grinding with a classifier improves grinding efficiency, reduces unit specific power consumption, and reduces over grinding. The classification device remove

    Oct 29, 2012

  • AUSIMM
    Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process Control

    By W P. Breytenbach

    "The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued

    Jul 29, 2014

  • AUSIMM
    Recovery of Iron Ore Fines and Ultrafines from Tailings by Using Wet High-intensity Magnetic Separation – JONES WHIMS

    By M Gerards, M Steinberg, T Graham

    The quality and quantity of Australia’s secondary deposits, which include tailings streams and tailings dams, are higher than most countries’ primary deposits. In addition, these secondary deposits ha

    Jul 13, 2015

  • AUSIMM
    Climate Change - Relative Solar and Anthropogenic Forcings

    The first thing to be aware of is that the warming effect of carbon dioxide is strongly logarithmic. Of the 3¦ that carbon dioxide contributes to the greenhouse effect, the first 20 ppm has a greater

    Jan 1, 2009