Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Potential Mineralisation of Gold and Base-Metals in the Bald Hill Region, South Westland, New Zealand

    By A F. Cooper

    The northeast-southwest trending ~25 km2 area incorporating Bald Hill is located 18 km northeast of Haast, and 5 - 7 km west of the Alpine Fault in South Westland, New Zealand. The geology consists of

    Jan 1, 2007

  • AUSIMM
    The Modified Metallurgical Upgrading of Ilmenite to Produce High Grade Synthetic Rutile

    Naturally occurring rutile contains approximately 96 per cent titanium dioxide (Ti02), whereas the product from the ilmenite reduction - aeration upgrading process, "sub- rutile", contains only abou

    Jan 1, 1973

  • AUSIMM
    Unveiling the future of psychosocial hazard management – a multidisciplinary approach

    By N Armitage, C Young

    In the dynamic realm of mining health and safety, addressing psychosocial hazards is crucial. Legislative requirements now demand employers navigate this complex terrain, but uncertainty often clouds

    Apr 16, 2024

  • AUSIMM
    Declining At Mount Windarra Mine With Emphasis On Advancing Through Major Shear Zones

    Declining from surface provides access, haulageway, ventilation and provision for ser- vices for stoping and development. Three boom jumbos and 3.8 m3 capacity diesel loaders are used in decline de

    Jan 1, 1977

  • AUSIMM
    The Perseverance Gold Deposit ù The Next Step at Peak

    By R Berthelsen

    The Peak Gold Mines Pty Ltd (PGM) operations are located approximately 9 km south of Cobar, NSW. PGM currently mines and treats ore from three separate orebodies within 5 km of the original plant. Pro

    Jan 1, 2004

  • AUSIMM
    Express Rail Link – Challenges of Tunnelling Through Hong Kong and into Mainland China

    By A Morris

    The Express Rail Link (XRL) will provide high-speed rail services from Hong Kong to Guangzhou and a connection to the national high-speed passenger rail network serving major cities throughout Mainlan

    Mar 8, 2011

  • AUSIMM
    Tax Aspects of Mining Project Development

    Taxation is a major factor in evaluating mining project developments. The availability or otherwise of effective tax relief for project expenditures can have a crucial bearing on the decision to p

    Jan 1, 1983

  • AUSIMM
    The Role of Gravity and Intensive Cyanidation in Processing Preg-Robbing Gold Ores - ABSTRACT ONLY

    A flow sheet has been developed to treat a high tonnage highly preg-robbing gold ore. The ore is low grade and fine grained with a high proportion of very fi ne free gold. The key components of the fl

    Aug 1, 2010

  • AUSIMM
    Technical authority – can we balance governance, risk and efficiency in management of change?

    By M S. Tuohy

    Poorly judged or under-appreciated change plays a role in many major accidents. In particular, operational changes related to continuous improvement, maintenance and introduction of new technology can

    Apr 16, 2024

  • AUSIMM
    Preliminary Results on the Reproducibility of Sample Preparation and QEMSCAN« Measurements for Heavy Mineral Sands Samples

    QEMSCAN« technology is a widely accepted automated e-beam technique providing quantitative and statistically robust mineralogical data to the mining industry. It uses X-ray mapping combined with backs

    Jan 1, 2008

  • AUSIMM
    Use of Large Twin-Power Scrapers in Prestrip Operations (5b96252c-a8e3-4454-b0d8-e41ea665d004)

    The use of scrapers in mining and earthmoving operations is not new; in fact they are one of the earliest methods of bulk earthmoving. A single machine, which can load, haul, and dump material with a

    Jan 1, 2003

  • AUSIMM
    Sensors and automation – a unique opportunity to leverage real-time gold recovery data through data analysis and automation in gold processing

    By S Gray

    Based on the 2021 Volume 5 State of PlayTM mining survey of key executives and board members in the mining sector, the key responses to ‘Which of the following technologies will have the biggest impac

    Aug 24, 2022

  • AUSIMM
    Design of Roof Support of the Sydney Opera House Underground Parking Station

    By Best R. J, Poulos H. G

    The method for design of primary roof support for the large todoidal cavern constructed to house the Sydney Opera House parking station is presented. The cavern was constructed with 5 m of rock cover

    Jan 1, 1993

  • AUSIMM
    Exploration and Coal Resources of the Moreton Basin, Queensland

    The Jurassic Walloon Coal Measures crop out over much of the Moreton Basin and contain numerous thin, banded coal seams which have been mined at various locations since the 1870s. Historically most

    Jan 1, 1991

  • AUSIMM
    Investigation and Development of Pasminco No 5 Ventilation Shaft, Broken Hill

    By de Bruin J H

    A method new to Australia was used for sinking a vertical shaft at Broken Hill in the development of Pasminco Southern Operations No 5 Ventilation Shaft. The 6 m diameter shaft of 820 m depth was plan

    Jan 1, 1993

  • AUSIMM
    Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future Trends

    By Duncan GR

    Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es

    Jan 1, 1988

  • AUSIMM
    Gold Mineralisation at the North End of the Kalgoorlie Field, Mount Percy - Kalgoorlie, Western Australia

    By Bonsall EM, Schwabe MR, Hamlyn DA

    Historically, most of the gold produced from Kalgoorlie has been derived from the gold and gold telluride Golden Mile lode systems dominantly hosted within the Golden Mile Doler-ite and to a lesser ex

    Jan 1, 1984

  • AUSIMM
    The Development of a Zinc-Based Touch-Up Solder for General Galvanised Products

    By Zervoudis J

    Limitations of current touch-up solders for galvanised steel include coating thickness control problems and poor corrosion and abrasion resistance as well as health and environmental concerns due to

    Jan 1, 1993

  • AUSIMM
    Risk Elements Characteristics of Mining Investments

    The exploration and mining risks are investigated and compared to the risks of smelting, secondary processing and other normal industrial activities. This study concentrates on the risk before, or

    Jan 1, 1986