Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Probabilistic Approach to the Design Optimisation of Overburden Slopes at Morwell Open CutBy Rieniets S, Somerville J. L
In Morwell Open Cut brown coal mine, the overburden 'firehole' materials which have resulted from ancient coal fires vary-from hard baked clays to firm laminated lacustrine clays. The need
Jan 1, 1994
-
The Sullivan Concentrator ù The Last (and Best) Thirty YearsThe optimal production of the metals needed by society is best achieved by a close synergy between concentrate production and smelting. For over 75 years commencing in 1923, such a close relationship
Jan 1, 2005
-
Technical Audits in Project DevelopmentBy Bell MG
At various decision points in the development of a project, a developer, joint venture partner or financial institution may require an independent review of the basic assumptions and technical asp
Jan 1, 1983
-
Backfill for Bench Stoping OperationsBy K Kuganathan
This paper describes a new methodology that can be applied to compare several bench extraction strategies requiring backfill. The method is applicable at the planning or operational stages and can be
Jan 1, 1998
-
(U-Th)/He Geochronology of Channel Iron Deposits, Robe River, Hamersley Province, Australia – Implications for Ore GenesisBy M Danišík
Two drill core samples of haematite/goethite from the Robe River (Western Australia) channel iron ore deposits (CID) were dated using (U-Th)/He methods in order to constrain the timing of iron oxide f
Jul 11, 2011
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
High temperature amphiboles in the metamorphic aureole of the Papuan Ophiolite, Papua New GuineaA narrow (200-300m) zone of amphibolite facies metamorphic rocks underlies the Papuan ophiolite near the Musa-Kumusi divide, SW of Popondetta, Oro Province. The amphibolite rocks are bounded up-sectio
Jan 1, 1994
-
Trigger Release Mechanism for Release of Mine Water to Magela CreekBy McGill RA
The Ranger Uranium Mine is surrounded by a World Heritage National Park. The strict environmental controls under which the mine operates are based on scientific and social requirements. Release of n
Jan 1, 1988
-
Computational Fluid Dynamics Modelling of Slimes Flotation at Mt Keith OperationsBy M P. Schwarz
This paper describes modelling studies of the flotation cells used by BHP Billiton Nickel West Ltd in the slimes circuit at Mt Keith. The aim is to achieve a better understanding of the hydrodynamic l
Jan 1, 2008
-
An Example of Risk Management in the Global Engineering and Construction BusinessBy M Elias
Management of risk has always been an integral part of successfully executing engineering and construction projects although formal recognition of the discipline of risk management is a relatively rec
Jan 1, 2003
-
Drilling Practice and Investigation into Drilling Techniques at the Mine Site of Hamersley Iron Pty. LimitedBy Bradley AJ
Hamersley Iron Pty. Limited mines and pro cesses iron ore from two orebodies at Tom Price and Paraburdoo, situated in the North West of Western Australia. Conventional open pit mining methods are u
Jan 1, 1978
-
Improved Ventilation and Dust Capture in Underground Crushing PlantsBy S W. Kingman, D Whit, I S. Lowndes
The use of compressive crushing equipment such as gyratory crushers within minerals processing plants can potentially generate large quantities of dust. Remedies to this problem include the retrofitti
Jan 1, 2005
-
The Interaction of Ethyl Xanthate and Cyanide in the Lead Roughing of a Mount Isa OreBy Johnson N. W, Quast K. B
Over the years there have been occasional references in the literature to the activating effect of cyanide in galena flotation with xanthates. These have usually been associated with the processing of
Jan 1, 1990
-
Future Mining - Workers' Skills, Identity and Gender When Meeting Changing TechnologyBy J Johansson
The aim of this paper is to discuss how to form work and organisations in the mines of the future. The Kiruna underground iron ore mine in the far north of Sweden is used as an example on how technica
Jan 1, 2008
-
Heat Transfer in Layered Packed BedsBy Newell R
The influence of layering on the rate of heat transfer through a packed bed consisting of particles of two different sizes and heat capacities has been determined by measuring the heat front veloc
Jan 1, 1987
-
Use of Pre-injection and Spiling in Front of Hard Rock TBM ExcavationHard rock TBMs are very often open machine layouts, with just a part roof shield over the front of the machine. The whole system is designed for fast face advance and the economy of the project often
Jan 1, 1999
-
Productivity Improvement Case Study: Use of True TQM in Developing Australia's Largest Underground Coal Mine (eeca4b36-17c2-4559-b89b-8ed25f573d4c)It is no longer adequate when starting a new mine to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency which requires systematic in
Jan 1, 1995
-
Studies on the Heap Leaching Characteristics of Western Australian Gold OresBy Kyle J. H, Misra V. N
The most recent development in gold processing is the increasing use of heap leaching for the extraction of gold from low grade ore, and old tailings dumps. The reason for this trend is mainly to do
Jan 1, 1991
-
Driving the transformation to hydrogen ironmaking – an experimental vertical shaft H2-DRI reactor facility in NZBy M McCurd, M Lynch, B H. Yin, S Mendoza, C W. Bumby, Y Iwasaki, B Rumsey
Iron and steel production is responsible for approximately 6.3 per cent of global anthropogenic CO2 emissions. Direct reduction of iron with hydrogen is a potential route for decarbonising the iron an
Sep 18, 2023
-
Geological Settings of Gold Districts in MyanmarBy C Ausa, Nyunt Htay, A, L Deiparine
The main tectonic elements in Myanmar are a late Mesozoic and Cenozoic magmatic arc system in the west, repeated in northern Myanmar by more than 300 km of dextral movement on the Sagaing Fault, and t
Jan 1, 1999