    Dynamic Response of a Fully Grouted Resin Roof Bolt to Blast Loading

    By Francis O. Otuonye

    A time series and system analysis modeling technique was applied to signals from strain egages mounted on a fully grouted resin roof bolt and signals from accelerometers mounted on the bolt head and r

    Jan 1, 1987

  • ISEE
    Rock Slope Remediation on the Pennsylvania Turnpike Bedford, Pennsylvania

    By Ron Woolf, Corry Goumans

    This paper describes rock slope remediation performed along America’s first Superhighway, the Pennsylvania Turnpike and in particular, the specialized drilling equipment designed and built by Pacific

    Jan 1, 2001

  • ISEE
    Low Cost Method for monitoring Shock-Tube Detonator and Explosive Product performance in Blast holes.

    By W. Birch, G. D. Rangel-Sharp, L. Bermingham

    For many years, the accepted method of Measuring the Velocity of Detonation (VOD) in blast holes has been to use an electric cable of a constant resistance per metre. Thus as the wire is consumed by t

    Jan 1, 2011

  • ISEE
    Careful Blasting (125,000 cu.m) for a Shopping Centre in Downtown Helsinki

    By R Vuolio, B A. Jonsson

    In the center of Helsinki - capital of Finland - extensive blasting operations were carried out during the years 1982 - 84. At the corner of the streets Mannerheimintie and Simonkatu - in the Forum bl

    Jan 1, 1985

  • ISEE
    Regression Model for Surface Vibrations from Underground Operations

    By Tristan Worsey, Nathan Rouse, Daykin Schnell

    The authors were retained by a proposed underground metals mine operation to evaluate the potential blast vibration amplitudes that could be generated at surface structures above the proposed mine. Li

  • ISEE
    Seismic Monitoring During Blastings of Building Pit for WTC at Rijeka

    By D Vrkljan, Z Ester

    Excavating the building pit for the World Trade Center at Rijeka, it was necessary to blast over 160000 m3 of hard mass in fused condition. The building pit is located at a densely populated residenti

    Jan 1, 1999

  • ISEE
    Vibration Monitoring and Control of Blasting Associated with the Construction of a Highway Next to a Show Cave

    By Paul Worsey, Gerald Rupert, Mark Kirkbride

    The realignment of Highway H in the proximity of Crystal Cave (Springfield MO.) required the development of a blasting program that was both economical and efficient for construction, yet ecologically

    Jan 1, 1997

  • ISEE
    Mass Blast of Pillars Using New Blasting Technique

    By Ingvar Hansson, Bjorn A. Jonsson, Bernt Larsson

    In the Kiruna Research Mine, Sweden, four large open stopes have been mined, leaving intermediate piIlars and crown pillars. At the final stage of mining mass blasting of the crown pillars above two o

    Jan 1, 1986

  • ISEE
    Engineering Considerations for Blasting at the Hanging Lake Tunnel Project, Glenwood Canyon, Colorado

    By Thomas R. Scotese, John L. Ackerman

    The Hanging Lake Tunnel Project represents a major portion of the Glenwood Canyon Project, the last piece of Interstate 70 to be constructed. The project features twin bore, large span rock tunnels an

    Jan 1, 1992

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    Underground Mega Mass Blasting with Electronic Initiation Near Urban Area (d4770d5b-0062-4b3c-9658-460485a3a3f4)

    By Jean-Francois Lagueux, Andre Pomerleau

    Goldex Mine is an underground mine located near the town of Val-d’Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco

    Jan 1, 2011

  • ISEE
    Everglades Nutrient Removal Project

    By Philip M. E Thomas

    For over sixty years man has struggled to defeat the natural swamp lands known as the Florida Everglades as demand for land to support the burgeoning population growth in the state continued almost un

    Jan 1, 1994

  • ISEE
    A Rational Method for Predicting Damage to Historical Structures Subjected to Blasting Vibrations

    By Kenneth Medearis

    The accurate prediction of possible damage to historic structures subjected to blasting-related ground motions is not infrequently the dominant factor in whether or not a mining or quarrying operation

    Jan 1, 1993

  • ISEE
    Blasting 250 Feet from a Historic Structure

    A case history is presented where a variance was permitted by the court to change a 500 foot limit to 250 feet for blasting overburden at a surface coal mine in the proximity of a historic structure.

    Jan 1, 1991

  • ISEE
    New Developments in Seismic Explosives

    By Oldrich Machacek

    Seismic explosives are very important tools in the search for oil and gas. Changes and new techniques in seismic exploration methods are also demanding new developments in seismic explosives. This art

    Jan 1, 1985

  • ISEE
    Blast- Induced Structural and Crack Response of a Brick Residential Structure Near an Aggregate Quarry

    By Charles Dowding, Cathrine Aimone-Martin

    This article summarizes an investigation of the structural response of a brick façade home in New Mexico. The subject Ricter residence was located some 1100 to 1400 ft away from an aggregate quarry, a

    Jan 1, 2005

  • ISEE
    Cavity Expanision by Hypervelopcity Impact Applied to Blasthole Expansion by Detonation

    By Claude Cunningham, Szendrei

    The partitioning of blasting energy into “Shock” and “Heave” components is a popular concept for attempting to match explosives to particular ground conditions and blasting results. The issue is compl

    Jan 1, 2004

  • ISEE
    Use of Seismographs in Quality Control of Surface Mine Blast Adjacent to Underground Mines

    By Robert C. Brown

    During a research period lasting over three years, a vast number of seismograms were collected and analyzed. From this data, other than obtaining a host of new information pertaining to the effects of

    Jan 1, 1980

  • ISEE
    On the Development of Explosion Technology in Seoul Metro-Subway Construction

    By Ginn Huh

    The blasting work to construct a subway in Seoul, Korea have often caused increased neighbor’s complaints because of ground vibration. In order to prevent the damage to the structure, it was necessary

    Jan 1, 2000

  • ISEE
    Generating Site Specific Blast Designs with State-of-the-Art Blast Monitoring Instrumentation and PC Based Analytical Techniques (da596259-c39e-4f49-b378-cc1a75a7ae1e)

    The common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and

    Jan 1, 1991