Bacterial Metal Sulfide Degradation - Pathways, Inhibition Measures, and MonitoringBy Wolfgang Sand, Alex Schippers, Tilman Gehrke, Thore Rohwerder, Peter-Georg Jozsa
Metal sulfides are degraded via thiosulfate (pyrite) or via polysulfides and sulfur (sphalerite, galena, chalcopyrite) by leaching bacteria The attack on the crystal lattice is either effected by only
Jan 1, 2000
-
Computer Optimization Of Service Hoisting PlantsBy Franc Runovc
The service hoisting plant in the mining transportation is an installation serving for the vertical transport of material and persons. An adequate mathematical model is presented for simple evaluation
Jan 1, 1992
-
Agricultural Materials – Soil AdditivesBy Gretchen K. Hoffman, George S. Austin
Soil amendments or soil conditioners generally carry the con- notation of being useful for problem soils or soils needing special treatments to produce maximum yields. Many different materials have be
Jan 1, 1994
-
Mineral Recovery Enhanced By Ultrasonic TreatmentBy H. V. Fairbanks
The following processes were investigated using ultrasonic treatment in mineral recovery: (1) cleaning coal from coal slurry ponds, and (2) extracting precious metals from tailings and other sources.
Jan 1, 1990
-
Tomographic Computer Programs With Constraints To Improve The Reliability Of Reconstructions With Crosshole DataBy Daryl R. Tweeton
The Bureau of Mines has developed PC-based tomographic computer programs for geophysical applications, and is making them available to potential users as part of a Bureau plan to facilitate the transf
Jan 1, 1992
-
Practical Aspects of Flocculant use in Hydrometallurgical ProcessingBy S. Eugene Sankey, Geoffrey L. Payne
Modern metallurgical processing often depends heavily on the use of flocculants to achieve the high levels of efficiency required. Selection of the optimum polymer can be complicated by the effects of
Jan 1, 1986
-
Overall Project SchedulingBy Roger G. Haga, Richard P. Campbell
Introduction Project scheduling . . . . • What is it? • Why is it done? • Who does it? • How is it done? • When is it done? These are some of the questions that will be addressed in this
Jan 1, 1986
-
Applying the Mixture of Mine Tailings and Fly Ash as Construction MaterialBy Q. Feng
"Efforts have been tried to apply the mixture of mine tailings and fly ash as construction materials. Through the present investigation, a protocol to make construction materials using the mixture of
Jan 1, 2016
-
Impact Of Control Parameters On Shearer-Generated Dust Levels (d1a2d171-424d-4a4b-afcc-224df2ebf29f)By A. E. Prokop, J. P. Rider
Previous research on continuous mining operations has shown that significant interactions exist between dust-control parameter application and the resulting respirable dust levels. However, simply inc
Jan 1, 2003
-
Clay Problems Encountered in Gold Heap LeachingBy Phoebe L. Hauff, Jeffrey P. Kurtz, Paul D. Chamberlin
Clay minerals can be a source of problems in heap leaching operations. The ore for many heap leach operations is commonly acid-sulfate alteration zone rocks which may be found in hot springs deposits
Jan 1, 1987
-
Removal of mercury cyanide species from solutions using dimethyl dithiocarbamatesBy J. B. Nanor, J. Lorengo, M. Misra, C. B. Bucknam
The dissolution of mercury during the gold cyanidation process is the cause of many environmental, health and processing problems. The removal of mercury-cyanide complexes from synthetic solutions and
Jan 1, 1999
-
Improved Geo-Sensing Using Artificial Intelligence Techniques For Tomographic InterpretationBy Kent S. Roessler
The Bureau of Mines is currently investigating the geophysical application of Tomography to monitor leachate during in-situ mining. Determining the location of the leachate is important for both econo
Jan 1, 1992
-
Optimum Fragmentation In Underground MiningBy Kai Nielsen
In underground mining coarse muck and large boulders lead to ineffective utilization of costly mining equipment, and extra expenses and delays caused by secondary blasting. Cost analysis in some Norwe
Jan 1, 1986
-
The Related Information Approach to the Integration of Diverse Geological Data and Mineral Resources EstimationBy Guocheng Pan
This paper presents-:a new multivariate mineral resource estimation model, referred to as the Related. Information (RI). Instead of relating a mineral resource descriptor directly to a set of geologic
Jan 1, 1992
-
Knowledge Representation Issues Pertaining To Mine Ventilation KBS Development (cc6ab886-7b63-4708-be07-9212b667ae40)By R. V. Ramani, K. V. K. Prasad, M. Swaminathan
Engineering design involves, in addition to numerical calculations, considerable amount of expertise and judgement. The expertise and judgement is required to conceptualize and idealize the problem, s
Jan 1, 1989
-
On-Stream Analysis At Zaldivar Cu SX PlantBy J. J. Whittaker
Zaldivar is an open pit copper mine operation located in the Atacama Desert, in northern Chile. The plant produces Cu cathodes using 4 solvent extraction trains. The plant was started up May 1995. S
Jan 1, 1999
-
Evaluation Of Progressive Rib Failure In Thick Coal SeamsBy W. C. Smith
Even with the most conservative mine plan, rib instability can occur unexpectedly, and if not adequately dealt with, can progress from a nuisance to a major safety hazard. This Bureau of Mines paper e
Jan 1, 1989
-
"Market Leadership Through Excellence": Developing A Corporate Strategic Plan With VisionBy T. Kontos
Rogers Group, Inc., is the nation's largest privately held aggregates producer (primarily producing crushed limestone and secondarily sand & gravel) and a major regional asphalt paving constructi
Jan 1, 1994
-
Coal Quality Challenges In The Powder River BasinBy Sharon G. Roness
Powder River Basin (PRB) mines were originally built to serve power plants designed specifically for their: coal. Sulfur was the major concern. Btu content and sodium limited the market for some plant
Jan 1, 1998
-
Knelson Concentrator Aids In Shift From Silver To Gold ProcessingBy Russell Dittrich
The Kinross DeLamar Mine has been operated for more than 17 years producing precious metals doré from ores, principally silver bearing with associated gold coproducts. In late 1995, the Stone Cabin or
Jan 1, 1998