Search Documents

  • ABM
    Projeto Cr298: Altas Taxas De Injeção De Carvão Com Baixo Fuel Rate Nos Altos Fornos Da Arcelormittal Tubarão

    By Filipe Sathler

    O projeto CR298 se iniciou no final do segundo semestre de 2014 quando o Coque Rate (CR) médio era de 351,0 kg/t. A meta definida foi de atingir média mensal de CR de 298 kg/t em dezembro de 2016, per

    Oct 30, 2017

  • CIM
    The Pierina Project: From Acquisition to Production

    By Barrick Pierina, John Frostiak, Igor Gonzales, Kenneth G. Thomas, Ken Manning

    "1.0 SummaryThe Pierina deposit was acquired in August 1996 when Barrick Gold Corporation purchased Arequipa Resources, a junior mining company with extensive land positions in Peru. At the time of ac

    Jan 1, 2000

  • SME
    Punk Rock in Portland

    By Pat Wilmoth, Joseph P. Gildner, Dan Nowak, Shane Yanagisawa, Don Z. Painter, Gordon F. Revey

    Frontier/Traylor is presently completing construction of twin tunnels for the Tri-County Metropolitan Transit District of Oregon’s (Tri-Met) westside lightrail system. The tunnels are each 4,550 m (1

    Jan 1, 1997

  • NIOSH
    OFR-21-85 Conservation And Substitution Technology For Critical Metals In Bearings And Related Components For Industrial Equipment And Opportunities For Improved Bearing Performance - Introduction

    By Allen G. Gray

    It's not news to you that the United States is highly vulnerable to potential problems in supply of critical and strategic metals, and that these metals - chromium, for example - are employed in

    Jan 1, 1984

  • SAIMM
    Fatigue Knowledge?A New Lever In Safety Management - Synopsis

    By W. J. Theron

    The purpose of the paper is to give an introduction to the concept of fatigue and its causes in the mining industry. By knowing the fundamental role it plays, together with its dynamics, can positivel

    Jan 1, 2011

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • ABM
    Caracterização Microestrutural E Mecânica Do Aço Api 5l X80 Com Distintos Projetos De Liga

    By João Paulo Vilano de Castro

    O processo termomecânico de laminação controlada seguido de resfriamento acelerado permite obter aços de elevada resistência mecânica e tenacidade e excelente soldabilidade, com o emprego de menores a

    Aug 16, 2017

  • NIOSH
    OFR-64-81 Evaluation, Modification & Application Of Roadheaders In Underground Uranium Mines

    By J. P. Connell

    The U.S. Bureau of Mines awarded a contract to Morrison-Knudsen, Inc., to evaluate the use of roadheaders in underground mining operations. Road-headers were found to be widely used in mines as constr

    Jan 1, 1980

  • NIOSH
    IC 9182 Human Factors In Mining

    By Mark S. Sanders

    There is a growing awareness among mining professionals that the human factor plays a significant role in safety and productivity. Since the 1960's, the science of human factors, or ergonomics, h

    Jan 1, 1988

  • CIM
    Chrome Grinding Balls at Campbell Mine

    By Bill Shand

    "Placer Dome - Campbell Mine is a gold mine located at Balmertown in the Red Lake District of North Western Ontario. During the last 50 years, the mine has produced over ten million ounces of gold.A c

    Jan 1, 2001

  • SME
    Interview With Richard L. Lawson, President of the National Mining Association

    By Tim O’Neil

    What prompted the merger of the two long-established American Mining Congress/National Coal Association (AMC/NCA) groups that combine the coal, hard-rock, industrial- and agricultural-minerals sectors

    Jan 1, 1995

  • SME
    Deep Neural Network Models for Improving Truck Productivity Prediction in Open‑pit Mines - Mining, Metallurgy & Exploration (2024)

    By Wei Victor Liu, Omer Faruk Ugurlu, Chengkai Fan, Bei Jiang

    The accurate prediction of truck productivity plays a pivotal role in improving the efficiency and profitability of open-pit mining operations. However, predicting truck productivity is challenging ow

    Feb 12, 2024

  • CIM
    Industrial Engineering at the Jeffrey Mine

    By J M. Fletcher

    The responsibility and scope of the Industrial Engineering Department, as organized at the Jeffrey mine, has been broadened to include any study, project or report that could result in more effective

    Jan 1, 1963

  • ABM
    Simulação Física E Matemática Da Penetração De De Gás Na Perna De Subida De Um Modelo Físico De Desgaseificador Rh

    By Bernardo Martins Braga

    O desgaseificador RH é um reator de refino secundário bem estabelecido. Nesse equipamento, gás inerte é usado para promover a circulação de aço entre a panela de aciaria e uma câmara de vácuo. A predi

    Aug 17, 2017

  • CIM
    Magnesite-talc deposit in southern Deloro Township, Ontario

    By A. T. GRIFFIS, R. J. GRIFFIS

    A large magnesite-talc body is locared in Delora Township, 11 km sourh-southeasr of Timmins, Onrario. The deposit occurs in part of an Archean greensrone belt dominated by volcanic and sedimenrary roc

    Jan 1, 1984

  • CIM
    A Preliminary Comparison of Coal Classification and Processing between Canada and China

    By Ting Lu, Gerard Laman

    "This document compares the systems of coal classification described under ASTM standards used in Canada to GB standards used in China. A preliminary connection of metallurgical coal classes was set u

    Jan 1, 2012

  • SME
    Practical Approaches To Geologic Modeling In Precious Metals Reserve Estimation ? Introduction

    By M. W. Springett

    During the 1970's geostatisticians were often accused of not paying sufficient attention to geologic features in the computerised generation of ore reserves. Unfortunately this charge was all -to

    Jan 1, 1985

  • NIOSH
    OFR-32(3)-83 Safety Analysis Of The Blind Shaft Borer - Volume 3. Supplementary Reports F-J

    By C. A. Geffen-Fowler

    This report, sponsored by the Bureau of Mines, presents the results of an examination of the safety of the Blind Shaft Borer (BSB) shaft sinking system and an alternative modified BSB design concept i

    Jan 1, 1981

  • SME
    Heat Stress in Underground Mines and its Control Measures: A Systematic Literature Review and Retrospective Analysis

    By Siddhartha Roy, Hemant Agrawal, Ram Madhab Bhattacharjee, Devi Prasad Mishra

    Heat stress is a major concern for the health, safety and productivity of miners working in hot and humid underground mines. At greater depth, heat inside underground mines increases due to geothermal

    Jan 14, 2022

  • ABM
    Validação Experimental De Soluções De Flexibilidade Elástica Aplicáveis A Corpos De Prova C(T) E Se(B)

    By Gustavo Henrique Bolognesi Donato

    O projeto e a operação de estruturas que podem vir a conter trincas demandam estudos de integridade estrutural suportados por propriedades mecânicas à fadiga e à fratura advindas de ensaios experiment

    Aug 17, 2017