Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Syntectonic Base-Metal Mineralisation with an Epithermal Gold Overprint: McKinnons Gold Deposit, Cobar, NSW, Australia

    By P K. Seccombe

    The McKinnons gold deposit is hosted by weakly deformed, Palaeozoic metasedimentary rocks of the Cobar Basin in the western Lachlan Fold Belt of New South Wales. Mineralisation comprised a largely sup

    Jan 1, 1999

  • AUSIMM
    Open Stoping with Associated Caving at Mount Lyell

    Underground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce

    Jan 1, 1982

  • AUSIMM
    The Design and Evaluation of a Large Direct-Contact Ice-Air Cooler for Vaal Reefs Gold Mine

    By Bluhm S. J, Feio L, Ramsden R

    A new mining area at the Vaal Reefs gold mine is to have a shaft. system which will extend to a depth of 4 200 m and will require 130 MW of cooling. A novel feature of the proposed cooling system

    Jan 1, 1988

  • AUSIMM
    The Effect of Residence Time and Aeration on Coal Recovery Within the High Intensity Zone of a Flotation Machine

    By J A. Cowburn

    The high intensity zone within the Jameson Cell is the downcomer. It is largely external and separated from the flotation tank. This, together with operation of the downcomer under vacuum, rather than

    Jan 1, 2005

  • AUSIMM
    Automation in Underground Drilling, Loading and Transportation

    By Ulvelin K, Antila K

    Large scale cut and fill mining in narrow silver-lead-zinc orebodies began at Mount Isa in 1964. Initially each orebody was one stope and access was via raises from the level above. Upholing was t

    Jan 1, 1988

  • AUSIMM
    Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience

    Transport Canada (Federal Government) constructed the Halifax International Airport (HIA) near Halifax, Nova Scotia, Canada in the late-1950s. Site location criteria were primarily; direct access to t

    Jan 1, 2003

  • AUSIMM
    Some Factors Affecting the Coulombic Efficiency of Zinc Electrowinning

    By Frazer E. J, Lwin T

    Measurements of coulombic efficiency (QE) for zinc electrodeposition were carried out under mass-transfer-controlled conditions using a rotating disc electrode in synthetic acidic zinc sulphate so

    Jan 1, 1987

  • AUSIMM
    New Pelaeomagnetic Results from Late Palaeozoic Rocks of Australia and their Tectonic Significance

    Palaeomagnetic work on the red beds of the Hervey Group from central N.S.W., and on the Mount Eclipse Sandstone from the Ngalia Basin, Central Australia, reveals a pre-deformational magnetization

    Jan 1, 1987

  • AUSIMM
    Cut-and-Break, a 'New' Method of Rock Excavation

    By Seib W

    In cut-and-break rock excavation use is made of the fact that breaking rock in tension towards a free face requires a specific energy of excavation which is small in comparison with that required for

    Jan 1, 1992

  • AUSIMM
    Maximising Payable Gold in Base Metal

    Breakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr

    Aug 1, 2010

  • AUSIMM
    Risk Analysis in Open Pit Mine Planning

    Sophisticated pit optimisation software has allowed mine planning engineers to generate mining outlines that consider the numerous factors that have a major effect on the success or otherwise of a min

    Jan 1, 1998

  • AUSIMM
    Heap Leaching with Fine Grinding and Agglomeration at Potosi - Bolivia

    By Equivar J, Mirabal C, Pyper R

    In 1984, work was started to determine the viability of heap leaching silver-containing waste dumps from Cerro Rico near Potosi - Bolivia, at an elevation of 4300 meters (14 100 ft.). The result tod

    Jan 1, 1991

  • AUSIMM
    The Reaction of Ammonium Nitrate with Black Shale at Mt Whaleback

    By Bellairs P, Stewart JC

    On 20 December 1983 at 8.40am blast- hole 57 of Blast RN177 prematurely detonated follwed by a violent deflagration of blast- hole 59 at 10.40am. The blastholes were 380mm diameter drilled in black

    Jan 1, 1986

  • AUSIMM
    Drill and Blast - A Necessary Evil Or?

    It is well documented that drill and blast outcomes affect the downstream mining processes of loading, hauling, crushing and grinding but it can also significantly impact on mine profitability via dil

    Jan 1, 1999

  • AUSIMM
    Spontaneous Combustion Management Comparison between Australia and China

    By B Poborowski, A Chen

    "For some time, the Australian and Chinese underground coal mining industries have evolvedindependently with minimal infl uence on each other. Despite the fact that in recent years severaltechnologies

    Jun 1, 2012

  • AUSIMM
    Modelling of gas-slag flow behaviour in the ironmaking blast furnace – a review

    By B J. Monaghan, P Zulli, X F. Dong

    In the lower zone of blast furnace (BF), slag trickles down through a packed bed of carbonaceous particles in the form of films, rivulets or droplets. During its downward flow, there are significant i

    Jun 19, 2024

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • AUSIMM
    Some Installation, Operational and Maintenance Aspects of Diesel Engine Power Plant, Gold Mines of Kalgoorlie LTD., W.A.

    This paper describes the oil engihe plant owned and operated by Gold Mines .of Kalgoorlie Limited, and gives some details of installation, operational, and maintenance experiences which have arisen du

    Jan 1, 1945

  • AUSIMM
    Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation Medi

    By M Sparrow

    The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun

    Mar 8, 2011

  • AUSIMM
    A Numerical Approach for Prefeasibility Analysis of Tailings Disposal Options

    By B Muller

    The disposal of tailings has become a greater issue due to the changing economics of mineral extraction. The processing of lower grade deposits and tougher environmental regulations has led to the sel

    Sep 26, 2011