Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Transforming dust control – lessons from tunnellingBy A De, B Palmer, rade, P Stowasser, A Fanning
Mining and tunnelling share many commonalities (eg confined working environments, excavation equipment and processes), but of significance is an overarching commitment to provide safe work conditions
Apr 16, 2024
-
Application of Block Caving System in the Tongkuangyu Copper MineBy Song Yongxue
During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a
Jan 1, 2000
-
Predicting Field Performance of Lysimeters Used to Evaluate Cover Systems for Mine WasteBy S L. Barbour
Measurement of the net percolation from the base of a cover system into the underlying waste material is a key component of a cover system monitoring program. The units of measure (ie a percentage of
Jan 1, 2003
-
Environmental Geochemistry of the Halls Peak Massive Sulphide ZnPbCuAg Deposits, New South Wales, Australia (388f85f2-8218-4c99-9e32-5b2813a920c5)By Muller M, Ashley PM
Massive sulphide ZnPbCuAg deposits in the Halls Peak district of northeastern NSW are of the submarine volcanogenic type. They occur as a number of small lenses enclosed in shale and epiclastic rocks
Jan 1, 1995
-
Effect of Titania on the Sintering Performance of Hematite Iron OresBy S Hapugoda, J Manuel, N Ware, A Dehghan-Manshadi
The effect of titania (TiO2 ) addition on the sintering performance of hematite iron ore has been studied by doping pure TiO2 into a sinter blend. The results of laboratory-scale compact sintering tes
Jul 13, 2015
-
Rise and Pillar Rill Stoping at Golden Crown MineBy Rogers M, Sullivan B
Golden Crown Mine is a narrow vein gold mine producing 75000 tpa. Production has been predominantly by shrink stoping using hand held machine and airleg. Bogging from these stopes is done with Toro 15
Jan 1, 1993
-
Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill OperationBy D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett
During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve
Oct 29, 2012
-
Drilling Techniques for Resource Estimation of Mineral Sand DepositsBy M Z. Abzalov
Drilling mineral sand deposits has specific challenges, which are different from drilling hard rock deposits: Drilled sequences are represented by non-consolidated free-flowing sands to semi-conso
Oct 5, 2011
-
Sourcing and Treatment of Gravel Requirements in OtagoFor the purpose of this paper the Otago Region is that covered by the Otago Regional Council. This area, like other South Island Regions, has a river system starting in the Mountains and are all grave
Jan 1, 1992
-
Confirmation of Multiseam Extraction Rules for Black Rock Manganese Operations, Assmang, Northern Cape, South AfricaBy M K. C Roberts, M G. Magwaza, J W. L Hanekom, P Piper, R Lousteau
Due to the perceived potential to extract the second economic manganese seam at its Black Rock Operations in the Northern Cape Province, South Africa, Assmang commissioned an investigation with respec
Nov 5, 2014
-
Keynote Address A Review of Instantaneous Outburst DataThe problem of instantaneous outbursts remains unsolved after over a century of events and the investigation of the mechanism of the phenomenon and means of treating it. Outbursts have occurred of
Jan 1, 1980
-
The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport SystemBy Matsuo T, Uga Y
The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spec
Jan 1, 1987
-
The VIMP Program and Major Advances in Geological Mapping in VictoriaBy OÆShea P. J, Dickson T. W
In April 1994 the Victorian Premier announced new State initiatives, collectively termed the Victorian Initiative for Minerals and Petroleum (VIMP), for exploration totalling $16.5 m over three yea
Jan 1, 1997
-
Plant Practice at the New Celebration Gold MineBy Martins V, Dunne R
A re-evaluation of the Hampton Boulder prospect in the early eighties resulted in a decision to proceed with mine development in December 1985. A 500 000 tpa gold treatment plant was commissioned in D
Jan 1, 1992
-
A Multi-year Assessment of Landform Evolution Model Predictions for a Trial Rehabilitated LandformBy G Hancock, J Lowry, T Coulthard, W Erskine, M Saynor
An important part of planning for the rehabilitation of uranium mine sites is the ability to assess the geomorphic stability of the final landform, over time frames ranging from decades to millenia. D
Jul 16, 2014
-
Textural Characteristics of Porphyritic Intrusions Related to Cu-Au Mineralisation in the Endeavour 26 North and Endeavour 27 Deposits, Goonumbla, NSW, AustraliaThe Goonumbla district of central-west New South Wales, Australia, hosts four significant porphyry Cu-Au deposits that contain a combined probable ore reserve of 71.7 million tonnes at 1.2 per cent Cu
Jan 1, 1999
-
Simulation of Copper Ore Handling at ISA MineBy Ruffles B. R
A computer simulation has been developed to model the flow of copper ore in Isa Mine. It simulates extraction of copper ore from the 1100 orebody by load-haul-dump (LHD) units to ore passes, haulag
Jan 1, 1974
-
Comparative Cost of Rock Drilling UndergroundDURING a period extending over about the last two and a half years, the performances of various types of rock drills in use at the mining department of the Zinc Corporation have been recorded as close
Jan 1, 1923
-
Project Evaluation – A Non-Executive Director’s PerspectiveBy R Knight
"In project evaluation there are two matters of keen interest to non-executive directors: the process by which an investment recommendation is reached, as well as the investment itself, as presented.
Mar 8, 2016
-
Some Novel Shaft Appliances at the State Coal Mine.A description of:1. Air-lock at No. 14 Upcast shaft.2. Pit-top gates at Dudley winding shaft.3. Safety rider employed in sinking No. 18 shaft.1. AIR-LOCK AT No. 14 SHAFT.Some time ago it became desira
Jan 1, 1928