Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Zeron 100 for Downstream Processing in Acid Leach Mining

    By Roger Francis

    There is increasing use of acid leach extraction methods at elevated temperatures and pressures by the mining industry. In many locations there are limited supplies of fresh water, and waters with hig

    Jan 1, 2010

  • CIM
    Canadian Copper and its Production

    By C. P. Browning

    Copper, as far as we know, was the first metal used by man, and due to the fact that it occurs in many places in the 'native' state, and also to the ease with which it may be shaped, it has

    Jan 1, 1927

  • CIM
    Proposed Mining and Milling Practice as Applied to the Stirling Ore-Bodies

    By R. E. Legg

    This paper gives a brief outline of the mining and milling methods which will be used on the Stirling zinc-lead-copper ores by Stirling Mines, Limited, who have for the past two years been developing

    Jan 1, 1929

  • CIM
    Structural control of ore deposits in the Canadian Shield between Great Slave and Great Bear Lakes, Northwest Territories

    By J. F. Henderson

    Stable mining operations commenced in the Northwest Territories in 1933. Pitchblende from Great Bear lake and gold from the Yellowknife district are the main minerals produced. The value of pitchblend

    Jan 1, 1954

  • CIM
    New Secondary Mine Vent Fan Design

    "INTRODUCTION Secondary mine ventilation has been hamstrung by the availability of fans that satisfy many competing operational factors. The sometimes legislated requirement of adequate volume to the

    Jan 1, 2019

  • CIM
    The Recovery of Zinc from Baja Mining Corp's El Boleo Orebody

    By M. Holmes, R. Molnar, E. Norton, K. Baxter, J. Riordan

    The Boleo Copper-Cobalt-Zinc-Manganese Project of Baja Mining Corp. is situated adjacent to Santa Rosalia on the Baja Peninsula of Mexico. The El Boleo ore is a mixed oxide-sulfide deposit with major

    Jan 1, 2008

  • CIM
    Fraser Mine Material Handling System

    Weekly Capacity ? Current Schedule Rate (198.5 tonnes / hour) X Skip Time (112.7 hours) X Effectiveness (85%) = Weekly Capacity (19,015 tonnes) Capacity Conclusions - Existing hoists optimized are

    Feb 1, 2008

  • CIM
    Development of Certain Non-Metallic Minerals in Western Canada

    By H. B. Lumsden

    This paper is intended to deal merely with the commercial development of some of the principal non-metallic mineral resources in the three prairie provinces- Manitoba, Saskatchewan, and Alberta. Coal

    Jan 1, 1928

  • CIM
    A General Review of Oil and Gas Developments

    By J B. Maughan

    Gas and oil seeps have been known in Quebec for more than one hundred years. These occur in three main areas which contain sedimentary rocks with a total thickness estimated to vary from 6,000 to 20,0

    Jan 1, 1964

  • CIM
    Slope Stability in Jointed Rock

    By Peter N. Calder

    The orientation of planes of inherent weakness (joints) with reference to an excavation in rock is the critical factor determining stability. The purely frictional 'residual' strength remaining follow

    Jan 1, 1970

  • CIM
    Development of New Erbia-Doped Yttria Stabilized Zirconia Solid Solutions via Spark Plasma Sintering

    By L. Bichler, C. J. Verdon

    In this work, the effect of doping yttria stabilized zirconia (YSZ) with 5, 10 and 15 mol% erbium oxide (Er2O3, erbia) was investigated using spark plasma sintering (SPS) technique. Sintering was carr

    Jan 1, 2014

  • CIM
    Government Versus Voluntary Sediment Pond Design Standards and Achieving Discharge/Receiving Water Quality for Total Suspended Solids at Mine Sites

    Keeping the sediment on the mine site and out of the water course is essential from the regulatory, environmental and sustainability perspectives. Regulation of this aspect of mining is embedded in en

    Aug 1, 2013

  • CIM
    Analysis of Ventilation Schemes for Re-Opening a Mine Sealed after a Fire and Gas Explosion Event

    By F. L. Wu

    Based on the analysis of a sealed coal mine resulting from a fire-triggered explosion, limitations were discovered in the re-entry procedures used to reduce the size of the sealed area that were being

    Aug 1, 2013

  • CIM
    Education and Careers Mineral Industry

    By V. C. Wansbrough

    First, permit me to say with what very great pleasure we find ourselves assembled in this most ancient and honourable city of Quebec. It is a city which we deeply respect as the fountain-head of the c

    Jan 1, 1951

  • CIM
    The Princeton Coal Field British Columbia

    By E. R. Hughes

    Introduction Situated 182 miles east of Vancouver, on the Kettle Valley branch of the Canadian Pacific railway, the Princeton coal field is readily accessible to the Coast markets. The area covers

    Jan 1, 1947

  • CIM
    The Commisioning and Start-Up of Quebec’s First Diamond Mine – Stornoway’s Renard Mine

    By V. Feldman, I. Holl, J. Zampini

    "The Renard Mine, 100% owned by Stornoway Diamonds, is located approximately 250 km north of the Cree community of Mistissini and 350 km north of Chibougamau in the James Bay region of north-central Q

    Jan 1, 2019

  • CIM
    Flowsheet Development for Thompson Ultramafic Low-Grade Nickel Ores

    By J. A. Bos, Z. Dai, P. Quinn, A. Lee

    A flowsheet is being developed for processing Thompson ultramafic low-grade nickel ores. This type of ore is characterized by high content of serpentinized magnesium silicates which generate slimes du

    Jan 1, 2009

  • CIM
    Processing of Natural Gas

    By J. M. Hollicky

    The economical processing of wet and sour natural gas presents a problem due to the seasonal demand for natural gas. The plants must be sized to handle the peak loads but may only operate at half capa

    Jan 1, 1958

  • CIM
    Safety First – Remote Rehabilitation of Underground Excavations

    By G. P. van Greunen

    "The rehabilitation of underground excavations has been undertaken as long as mining has existed. The conventional methods have proven to be dangerous, time consuming and expensive. During the constru

    Jan 1, 2019

  • CIM
    A Geological Reconnaissance of the East End of Great Slave Lake

    By Carl Lausen

    Within recent years several mining companies have sent expeditions co the east end of Great Slave lake co determine the mineral possibilities of that area. Little was known of the geography of the reg

    Jan 1, 1929