Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Gravity Concentration At Campbell MineBy Brad Hewitt
Since Campbell Mine began processing ore, there has been a gravity gold recovery circuit. From 1947 to 1982, gravity gold was concentrated through the combination of jigs and mercury amalgamation. In
Jan 1, 1996
-
Going Hard at Soft Ground in Buenos AiresBy Stephen P. E. Redmond
A 15 km water supply tunnel is being constructed in Buenos Aires, Argentinata expand the capacity of the existing system. Two 4.3 meter diameter Earth Pressure Balance (EPB) tunneling machines operati
Jan 1, 1999
-
Riverside Badlands Tunnel, Inland Feeder Project: The Challenges Between Concept and CompletionBy John Waggoner, Steve Klein, John Townsend, Jay Arabshahi
The Riverside Badlands Tunnel is a 13 km (8 mile) long segment of the Inland Feeder Project. This 3.65 m (12 ft) finished diameter water tunnel presented many challenges that had to be overcome to tak
Jan 1, 2003
-
Drill and Blast Operations and Water Control Measures atLake Mead Intake No. 2By Richard W. Kimball, Richard F. Coon
This paper describes drill and blast excavation and groundwater control measures at the Lake Mead Intake No. 2 project. The construction includes a deep access shaft, intake shaft, surge chamber, fore
Jan 1, 1999
-
Preface to the MME Special Issue on Emerging Technologies/FourthIndustrial Revolution in Mining Mining, Metallurgy and ExplorationBy Jürgen F. Brune
The Fourth Industrial Revolution, that of digital technologies and their application, is rapidly impacting the mining industry, as it is manufacturing, transportation, agriculture, trade, and most oth
-
An investigation of wet grinding in a laboratory overflow ball millBy L. G. Austin, R. C. Klimpel
Batch breakage kinetic tests were performed in a mill of 0.3 m diameter for a range of mill conditions. Accurate simulation required the measurement and use of factors which accelerated the specific r
Jan 1, 1990
-
79th Street Water Tunnel ExtensionBy Sara J. Heinlein, George Malkos, James E. Lindell, Tony Pestonatto
The 79th Street Water Tunnel Extension Project was initially designed by the City of Chicago, Department of Public Works, to increase the capacity of the City’s south side water distribution system. M
Jan 1, 2003
-
In-Pit Crushing And Conveying At Highland Valley CopperBy D. M. Richards, A. D. MacPhail
Highland Valley Copper currently mines two low-grade ore bodies, Lornex and Valley. The partnership was formed in 1986. As a cost reduction measure, it was decided to use an in-pit crushing and convey
Jan 1, 1995
-
Bacterial Metal Sulfide Degradation - Pathways, Inhibition Measures, and MonitoringBy Wolfgang Sand, Alex Schippers, Tilman Gehrke, Thore Rohwerder, Peter-Georg Jozsa
Metal sulfides are degraded via thiosulfate (pyrite) or via polysulfides and sulfur (sphalerite, galena, chalcopyrite) by leaching bacteria The attack on the crystal lattice is either effected by only
Jan 1, 2000
-
Improving Continuous Mining Productivity Through Systems AnalysisBy E. Topuz
Productivity is the most important determinant in the economics of underground coal mining operations. Lower labor productivity increases labor requirements per ton. This, in turn, increases the unit
Jan 1, 1988
-
Progress report on Cominco’s Red Dog project in Alaska, second largest zinc deposit ever discoveredBy H. M. Giegerich
About Cominco Only the original Broken Hill zinc deposit in Australia is larger than Cominco's Red Dog deposit. Indeed, the third largest zinc deposit in the world is Cominco's own Sullivan
Jan 12, 1986
-
Pyrometallurgical Principles Involved In The Combustion Synthesis Of Advanced Materials (f72a5417-8236-436d-ae7c-d3ce8a44e98b)By J. J. Moore
Combustion synthesis or self propagating high temperature synthesis (SHS) reaction systems are discussed with respect to thermodynamics and kinetics. In particular, tile effect of the process paramete
Jan 1, 1991
-
Anticipated Ground Conditions for the Riverside Badlands TunnelBy D. B. Desai, J. T. Waggoner, J. S. Hill, R. R. Redd, S. J. Klein
The 13 km (8 mile) long Riverside Badlands Tunnel is planned for construction starting in 1998. Extensive geotechnical investigations indicate that the 3.7 m (12 ft) finished diameter tunnel will be
Jan 1, 1997
-
Practical Application Of Aerostatistics To Multiple Fan System Analysis In Mine Ventilation (8d7def32-8c75-4ab2-8ed4-e06e8adecd95)By P. C. O. Chukabarah
Many aerodynamic and thermodynamic properties, such as temperature, pressure, velocity and density vary widely, and in random spatial and temporal manner for a given underground mine environment. Such
Jan 1, 1994
-
The Channel Tunnel Current Status Of The French Tunnel WorkBy Ph. Vandebrouck
SUMMARY In August 1986, TRANSMANCHE LINK, a joint venture comprising the 10 companies who initially promoted the project, signed a contract with EUROTUNNEL for the design, construction and commis
Jan 1, 1989
-
Stability Analysis Of A Room-And-Pillar Mine With Thinly-Laminated Roof, Strong Pillars And Weak FloorBy Park. D. W., Y. M. Jiang, L. A. Morley, W. Keeton
Underground room-and-pillar mining operations in the Warrior Coal Field in Alabama frequently suffer instability due to soft floors and thinly-laminated immediate roofs. This investigation concerns a
Jan 1, 1993
-
Numerical Modeling and Onsite Detection Analysis of Upward Mining Feasibility of Residual Coal from Multi‑Gobs in Close‑Multiple Coal Seams - Mining, Metallurgy & Exploration (2023)By Xinghai Lei, Nan Wang, Xiangyang Jin, Yuqi Ren, Yang Li
The upward mining method, as an effective mining method, is widely employed in close-multiple coal seams to extend the service life of coal mines and improve the recovery rate of residual coal resourc
Jun 28, 2023
-
Improved Method For Assessing The Risk Of Gas/Coal OutburstsBy H. Janas
In a gas/coal outburst the gas plays an active, driving part. The proneness of coal to outbursts can be determined by means of its gas emission properties, since coal that is liable to outbursts diffe
Jan 1, 1980
-
Navajo Mine – Multiple Seam Dragline StrippingBy D. L. Schenk
The Navajo Mine is exclusively a multiple-seam surface coal mine located in the northwest comer of New Mexico. The property is situated entirely on the Navajo Indian Reservation. It is owned and opera
Jan 1, 1990
-
Construction of a Long Coal Mine Decline in Southwest VirginiaBy Alwyn Protheroe, Steve Smith, Herbert Jr. Gibson
In September of 2000, Cowin and Company, Inc., contracted with Paramont Coal Corporation to construct a large decline approximately 820 m (2,700 feet) in overall length at a grade of 8 degrees to the
Jan 1, 2003