Search Documents

  • SME-ICGCM
    Technical Assessment of Subsequent Burdens due to Hard Coal Mining

    By Axel Preusse

    On the basis of the Law on Financing Hard Coal Mining dated 28 December 2007, the subsidized German hard coal mining industry will be shut down to the end of the year 2018 in a socially acceptable man

    Jan 1, 2008

  • IIMP
    La hidrosiembra, técnica de bioingeniería para la restauración de suelos producto de actividades mineras: experiencia en el proyecto minero Mirador, Zamora Chinchipe – Ecuador

    By Armando Rivera, Ángel Cueva

    Proyecto Mirador es una explotación a cielo abierto que requiere la construcción de vías, campamentos, plataformas, diques, canales, bandas transportadoras y otras facilidades, las mismas que implican

    Sep 30, 2019

  • SAIMM
    PB Battery Recycling. New Frontiers In Paste Desulphurisation And Lead Production

    By M. Olper

    The change in regulations and the strong attention to the environment have suggested some changes in the traditional processes for the recycling of lead acid batteries. Engitec Technologies, marketing

    Jan 1, 2008

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • AUSIMM
    Making use of potentially contaminating mine waste in cover design

    By N Jamson, T K. Rohde

    The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a

    Jul 23, 2018

  • SME
    4. Pit Limit Design Technique For A Highly Irregular Deposit

    By C. Douglas Lee

    This case study describes the work done at the University of Arizona on the development of a computer mine model for an irregularly shaped and spotty ore deposit. The purpose of the work was to develo

    Jan 1, 1979

  • AIME
    Genesis Of The Leadville Ore-Deposits.

    By MORTON WEBB

    Discussion of the paper of Max Boehmer, presented at the Pittsburg meeting, March, 1910, and printed in Bulletin. No. 38, February, 1910, pp. 119 to 122. W. MORTON WEBB, Germiston, Transvaal, South

    Feb 1, 1911

  • CIM
    A Visual Sensing Approach to Estimate Material Hauling Cycles in Heavy Construction and Surface Mining Jobsites

    By E. Rezazadeh Azar

    Dump trucks are the main mean for hauling earth material within and outside of the construction and open-pit mining jobsites. The real-time monitoring of the material transportation trips is beneficia

    Aug 1, 2013

  • AIME
    Drilling Selection Requires Value Judgments - Principles Of Drilling

    The selection of a particular machine for production drilling is the most critical drill evaluation the pit engineer is called upon to make. It is a true engineering design problem requiring value jud

    Jan 10, 1967

  • AUSIMM
    Treatment of Hard Water for Furnace Jackets

    In Broken Hill, Northern Rhodesia, two water jacket lead furnaces have been in operation for the past three years. The furnaces were erected in war time, and only absolute essentials were procurable.

    Jan 1, 1920

  • CIM
    Revision of the Geology of the Southern Alberta Plains

    By Loris S. Russell

    THE plains of southern Alberta constitute one of the classic areas of geological investigation in Canada, for it was here in 1874, and in 1881 to 1883, that George Mercer Dawson (1, 2, 3) made the pio

    Jan 1, 1937

  • SME
    Mine Haul Road Design And Management Best Practices For Safe And Cost-Efficient Truck Haulage

    Well designed and maintained haul roads are the key to minimizing truck haulage on-road hazards and costs, as well as increasing productivity. However, practically designing and managing a haul road

    Jan 1, 2010

  • AUSIMM
    The Palabora Underground Mine Project

    By P Townsend, F Russell

    Palabora Mining Company operates an integrated open pit mine, concentrator, smelter and refinery complex located in the Northern Province of South Africa. The Palabora open pit went into production in

    Jan 1, 2000

  • SME
    Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project

    By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis

    East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta

    Jan 1, 2007

  • AIME
    Preliminary Annual Meeting Program

    By AIME AIME

    THE Annual Meeting-numerically the 162d meeting-of the American Institute of Mining and Metallurgical Engineers will be held at the Pennsylvania Hotel, 7th Ave. and 33d St., New York, Feb. 18-22, with

    Jan 1, 1945

  • IIMP
    Técnicas geoestadìsticas no-lineales para la estimaciòn de reservas recuperables: Estudio de un caso pràctico

    By Jacques Deraisme

    El método de minado es un componente importante de la estimaciòn de reservas, y el beneficio del proyecto está condicionado a la habilidad de minar selectivamente. En ese sentido, los métodos de lixiv

    Aug 25, 2002

  • IIMP
    Los early halos y su implicancia en la exploración de pórfidos en las Américas

    By Raymond Rivera, Federico Cernuschi

    Este documento trata de actualizar el conocimiento de un tipo de venillas no tan conocidas que llevan el nombre early halos. El reconocimiento de este tipo de venillas puede servir mucho para la vecto

    Sep 30, 2022

  • NIOSH
    OFR-129(1)-81 Development Of A Man And Supply Hoisting System For Underground Metal And Nonmetal Mines - Volume I

    By David J. Hoadley

    This report describes the development and underground operation of a semi-automatic, raise climber, Man and Supply Hoist System designed for stope access in underground metal and nonmetal mines. Demon

    Jan 1, 1981

  • TMS
    The Cathode Process of Aluminum Chloride Electrolysis

    By R. Tunold, Y. J. Zhang

    "The cathodic kinetics of aluminum deposition from aluminum chloridealkali chloride melts was studied by use of electro-cnemical transient techniques at 700 °C. Aluminum deposited as an insoluble prod

    Jan 1, 1988

  • SME-ICGCM
    Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts

    By Michael Alber

    Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control

    Jan 1, 2006