  • SME
    Investigation of Climatic Conditions in Underground Coal Mining Mining, Metallurgy and Exploration (63acde09-eb8c-4eb1-b788-340f56a030a7)

    By İbrahim Çınar, Hakan Özşen

    Mine workers in heavy and dangerous work are under several physical risk factors, for example temperature, humidity, noise, vibration, lighting and air velocity. Thermal comfort includes parameters su

  • SME
    Cresson Mine Completes Two-Year Expansion

    By William R. Yernberg

    The Cripple Creek & Victor Gold Mining Co.(CC&V) celebrated completion of a two-year, $168.5-million expansion and capital improvement program. An open house celebration was held in the historic mini

    Jan 1, 2002

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (6ba9ad25-c173-46b9-a527-da25ba80fe4d)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2002

  • AUSIMM
    Yanacocha Gold District, Northern Peru

    By S A. Myers, T Klein

    The Yanacocha mining district is located in the northern Andes of Peru. The project is within the Cajamarca province, 20 km north of the town of Cajamarca and 600 km north of Lima, the capital of Peru

    Jan 1, 1999

  • NIOSH
    An Inexpensive Dual-Chamber Particle Monitor: Laboratory Characterization

    By Susanne Hering, Brent Kirby, Charles D. Litton, Tracy Allen, Kirk R. Smith, Rufus Edwards

    In developing countries, high levels of particle pollution from the use of coal and biomass fuels for household cooking and heating are a major cause of ill health and premature mortality. The cost an

  • NIOSH
    RI 3440 Reclamation Of Stripped Coal Land (562de5e2-d1ec-435f-b520-6a08692e4239)

    By Albert L. Toenges

    A phase in strip mining of bituminous coal is the overturning of the surface of the land. The purpose of this report is to acquaint the operators and others interested in stripping with the work that

    Jan 1, 1939

  • CIM
    The evolution and future of overburden dewatering at Highland Valley Copper (ccb710cb-32e0-4645-ac2a-8a63f54a56a6)

    By P. A. Witt

    "Highland Valley Copper is a conventional truck-shovel mining and flotation concentrator operation located 75 km southwest of Kamloops, British Columbia (Fig. 1).The ore is situated within a porphyry

    Jan 1, 2005

  • CIM
    The Benefits of Collaborative, Leveraged Industry-University Research Case Study of a McGill-CAMIRO Project

    By J. E. Nesset, L. S. Urbanoski, J. R. Goode

    "The benefits and advantages of pre-competitive, collaborative industry/university research are not always well appreciated. This paper presents the case study of a current collaborative project betwe

    Jan 1, 2001

  • AUSIMM
    Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit Slopes

    Owing to improvements in computer capacity, it is now possible to undertake fully coupled or partially coupled, three-dimensional (3D) hydromechanical Finite Element (FE) simulation of mines, includin

    May 1, 2010

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • NIOSH
    RI 7705 Autogenous Smelting Of Copper Sulfide Concentrate

    By Robert B. Worthington

    This investigation was undertaken to develop a more efficient copper smelting practice that would help meet the increasingly stringent antipollution standards. Continuous smelting to copper and a 0.8-

    Jan 1, 1973

  • AIME
    Rock Mechanics - Stress Conditions under which Core Discing Occurs

    By L. Obert, D. E. Stephenson

    The objectives of this investigation were to develop a laboratory procedure in which core discing could be produced under known (and variable) stress conditions, and to study the discing characteristi

    Jan 1, 1965

  • DFI
    Use Of Large Diameter And Long Steel Pipe Piles In Japan ? Synopsis

    By K. Kawakami

    In Japan, pile foundations have been used extensively for buildings, bridges and port facilities. A large number of steel pipe piles were first used in the 1960's and the amount of steel used in

    Jan 1, 2010

  • CIM
    Gold Milling at Lac Shortt

    By P. Dyas, H. Zouitt, D. M. Smith

    "Falconbridge Copper's Lac Shortt gold mine is located in northern Quebec approximately 300 km northeast of Val D'Or and 100 km west of Chibougamau (Pig. 1). Engineering for the mill commenced in earl

    Jan 1, 1987

  • NIOSH
    OFR-161(4)-82 Probabilistic Modeling Of Tailings Embankment Designs - Volume II - Model Application And Verification

    By Loren R. Anderson

    A probabilistic slope stability computer model was developed at Utah State University and independently evaluated by CH2M Hill Consulting Engineers as a design and analysis tool. Volume I of this repo

    Jan 1, 1982

  • SME-ICGCM
    Dynamic rock anchors

    By James J. Scott

    Dynamic rock anchors are interior fixtures developed by the author which promise to be a revolutionary development in the field of ground control. The fixtures are designed to be placed in the ground

    Jan 1, 1989

  • AUSIMM
    Numerical Modelling of Confinement Effects on Mechanical Properties and Failure Pattern of Brittle Rocks in Triaxial Tests with PFC3D

    One of the most important goals of the experiments is to determine deformation and strength of the rock specimen under applying triaxial load, the status of failure condition is one of the subjects wh

    Nov 25, 2010

  • AUSIMM
    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process

    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process The trends to the Tower Mill (TM) fo

    Sep 13, 2010

  • SME
    High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case History

    By Joseph J. Diehl, Brian B. Khalighi

    This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI

    Jan 1, 1997

  • AUSIMM
    The Continuous Miner and its Application to Pillar Extraction

    By Monger N. R

    Factors leading to the decision to use Joy Continuous Miners for pillar extraction in the Burwood Colliery are outlined. A detailed description is given of the Joy 1-CM-2 Continuous Miner, including t

    Jan 1, 1957