    Autogenous Grinding Of Disseminated Copper Ores

    By W. D. Bachman

    A study has been made of wet, autogenous grinding of disseminated copper ores, including testing of a large number of samples from Kennecott Copper Corporation's Chino mine. The efficiency with w

    Jan 1, 1970

  • ISEE
    Response of Non-Traditional Structures to Coal Mine Blasting

    By Catherine Aimone-Martin, Mary-Alena Martell

    Whole-structure and mid-wall responses of 33 non-traditional structures to surface coal mine blasting were characterized. Eighty-nine blasts were conducted at 11 mine sites throughout the U.S. to meas

    Jan 1, 2002

  • CIM
    Development of an Iron Ore Concentrate Fines Recovery Process from Copper Tailings

    By Lutz Markworth, Fernando Parra, Wolfram Jaspers

    "The worldwide demand of iron ore and the depletion of the high-purity deposits make it necessary to recover ores in increasingly fine size fractions or low Fe content in the feed material. Impurities

    Jan 1, 2008

  • NIOSH
    Design Analysis Of Underground Mine Ore Passes: Current Research Approaches

    By Stephen R. Iverson, Bill M. Stewart, Michael J. Beus

    The U.S. Mine Safety and Health Administration (MSHA) has identified ore pass hazards as a significant safety problem in underground metal mines in the United States injury and fatality data show that

  • DFI
    Seismic Considerations for Bridge Foundations

    By Lok M. Sharma

    "Construction of a new bridge in a seismically sensitive area requires careful assessment of earthquake impact on the serviceability of the facility. Not only is the superstructure vulnerable, the fou

    Jan 1, 2017

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963

  • NIOSH
    Analyses Of Montana Coals - Montana Coal Fields - Location

    By C. E. Dobbin

    The coal fields of Montana are widely distributed through the plains region in the eastern and northern parts of the State, and the mountain regions in the central, southern, and southwestern parts of

    Jan 1, 1932

  • SAIMM
    Focal Depths of South African Earthquakes and Mine Events

    By M. B. C. Brandt

    Focal depths of 15 tectonic earthquakes and 9 mine-related events were determined for South Africa using data recorded by the South African National Seismograph Network. These earthquakes and events w

    Jan 1, 2014

  • SAIMM
    Plenary Speaker-Technical Aspects Of Closed Loop Cooling Water, Associated With The Pebble Bed Modular Reactor Demonstration Power Plant

    By Carl Havemann

    [PAPER PRESENTED AT THE 8thINTERNATIONAL CORROSION CONFERENCE HELD AT THE SA NATIONAL MUSEUM OF MILITARY HISTORY, SAXONWOLD JOHANNESBURG DURING 14-15 NOVEMBER, 2006.]

    Jan 1, 2006

  • NIOSH
    IC 7613 Petroleum Refineries, Including Cracking Plants, In The United States January 1, 1951 ? Summary ? Crude-Oil Capacity

    By J. G. Kirby

    The total number of petroleum refineries in the United States continued to decline during 1950, and according to the Bureau of Mines annual refinery capacity survey there were 357 refineries January 1

    Jan 1, 1951

  • NIOSH
    IC 7196 Crude Oil And Gasoline Pipe Lines In The United States, May 1, 1941 ? Total Mileage

    By G. R. Hopkins

    Crude-petroleum pipe lines in the United States on May 1, 1941, had a total length of 118,350 miles - an increase of 7,770 miles since Jun, 30, 1936, then the last previous survey was made by the Bure

    Jan 1, 1941

  • SME
    Grouting For Groundwater Control Milwaukee Inline Project

    By Edwin F. Shorey, Richard F. Coon, Steven B. Fradkin

    Crosstown Interceptor Phase IA is the first deep tunnel element of the Milwaukee Inline Project. The tunnel contract includes 6,492 meters (m) of 9.1-m-diameter tunnel, two access shafts, and partial

    Jan 1, 1987

  • SME
    Snow Tunneling at the South Pole

    By John H. Wright

    The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)

    Jan 1, 2002

  • NIOSH
    RI 8347 Titania From Intermediates Prepared by Soda-Smelting Ilmenite

    By A. E. Raddatz

    The Federal Bureau of Mines, as part of its goal to minimize undesirable environmental impacts associated with mineral processing, has investigated a soda-smelting technique for processing ilmenite in

    Jan 1, 1979

  • SME
    A Study Of Coal Mine Roof Behavior During Mining

    By R. T. Langland

    The U.S. Bureau of Mines has conducted underground tests and computer analyses to study coal mine roof behavior. Southern Ohio Coal Company provided test sites it) their Heigs mines located near Athen

    Jan 1, 1977

  • AIME
    Reservoir Engineering – Laboratory Research - Laboratory Study of a Combination of Forward Combustion and Waterflooding – The COFCAW Process

    By D. R. Parrish, F. F. Craig

    In some respects, forward combustion (alias: fie-flooding, underground combustion, in-situ combustion, dry combustion) is an efficient oil recovery method. For example, its displacement efficiency (as

    Jan 1, 1970

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011

  • AUSIMM
    Development of Cost-Efficient Environmentally Sound Technology for Enhanced Gold Recovery from Rebellious Gold-Containing Raw Materials

    Development of Cost-Efficient Environmentally Sound Technology for Enhanced Gold Recovery from Rebellious Gold-Containing Raw Materials Study of biochemical leaching performances in gold-bearing sulf

    Sep 13, 2010

  • ISEE
    Journal: 100 Years / Engineering News New York January 5, 1905 Methods and Cost of Blasting and Handling Boulders (52912f89-42e4-4811-8c7f-344764181b42)

    By Daniel Hauer

    Blocking. (5) The “blocking” of boulders is a much cheaper way of breaking them up than “mud capping.” It should always be used in preference to that method except when too much time will be consumed

    Jan 1, 2006

  • SME
    The Effect Of Rock Type And Tunneling Machine On Bulk Material Handling Parameters

    By Donald E. Raab, Lee W. Saperstein

    INTRODUCTION The Premise Not much time has to be spent in a tunneling project to realize the tremendous interdependence that exists among the various unit operations. The research that is to be