Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Benchmarking Tool for Assessing Flotation Cell Performance

    By Jan E. Nesset, James A. Finch, Wei Zhang

    "Bubbles are unquestionably the heart of the flotation process. Their size and combined surface area are largely what drive the recovery process. This suggests that plant engineers should be aware of

    Jan 1, 2012

  • CIM
    Outotec’s Fully Automated Smelter 2020 – The Vision, the Status and the Future

    By Joey Hoang, Robert Johansson, Tapani Keronen, Mikael Jåfs, Jani Jansson, Mikko Korpi

    At the Copper 2016 conference in Kobe, Japan, Outotec introduced a vision for the year 2020, wherein smelting would make use of four digital cornerstones: intelligent instruments, advanced process con

    Jan 1, 2019

  • CIM
    Benefication of Low Grade Ore at the Detour Lake Mine

    "The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or

    Jan 1, 2016

  • CIM
    Hydraulic Fill Research at James Cook University in the new Millennium

    By K. Pirapakaran

    The Geotechnical Engineering research group at James Cook University has been working closely with all the leading mines in Australia in the area of minefills. They have carried out substantial resear

    May 1, 2007

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004

  • CIM
    Self-Tuning Flotation Control at Brunswick

    By M. W. Franklin, D. W. Hendriks

    "Changing ore types, feed grades and c1rculat1ng loads are some of the many factors that can make flotation feed-back control difficult. To control a flotation circuit using conventional fixed-paramet

    Jan 1, 1986

  • CIM
    Red Lake Gold Mine Autoclave Optimization Project

    By K. K. Murray, D. G. Gelderland

    "The pressure oxidation autoclave at the Goldcorp’s Red Lake Gold Mines (RLGM) was commissioned in 1991. Since commissioning, the circuit has been well maintained and its capacity increased to mechani

    Jan 1, 2017

  • CIM
    Nstrumentation and Monitoring Techniques for Oxygen Barrier Covers Used to Control Acid Mine Drainage

    By Abdelkabir Maqsoud

    Different management options and rehabilitation strategies are available for mine wastes that produce acid mine drainage (AMD). One of them consists in building a cover with capillary barrier effects

    May 1, 2007

  • CIM
    Review of Eco Clean YGJ Lead Production Using SKS-YGLTM Oxygen Bottom Blowing Smelting-Direct Reduction of Molten Slag Technology

    By Johnny Zhang, Yang Anguo, Li Weifeng, Xueyi Guo

    "SKSTM oxygen bottom blowing smelting technology was developed by SKS-ENFI at SKS Smelter, Hunan in the 1990s to replace the conventional sintering process and thus to meet the high national EHS stand

    Jan 1, 2014

  • CIM
    The Caustic Crack Route for Processing Concentrate from the Avalon Nechalacho Deposit

    By Dave Marsh, John Goode, Niels Verbaan, Kevin Bradley, Henrie Notzl

    The mineralogy of the Avalon Nechalacho deposit is complex with significant fractions of HREEs, Zr, and Nb found in refractory minerals such as zircon and fergusonite. Sulphuric acid baking followed b

    Jan 1, 2014

  • CIM
    Recycling of Rare Earth Magnet using Molten Fluoride

    By H. Zhu, Y. Sato, O. Takeda, K. Nakano

    Recycling of rare earth magnet wastes is essential to insure the stable supply of rare earth resources. For the development of a novel recycling process, the removal of rare earth oxide from an off-sp

    Jan 1, 2014

  • CIM
    Design and Implementation of a Brownfield Sag Pre-Crush Circuit

    By G. Castillo, G. Thies, C. Bissue

    "Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond

    Jan 1, 2013

  • CIM
    40Ar/39Ar Geochronology of Alteration and Petrogenesis of Porphyry Copper-Related Granitoids in the Darreh-Zerreshk and Ali-Abad area, Central Iran

    By P. H. Reynolds, S. Liaghat, A. Zarasvandi

    "Darreh-Zerreshk and Ali-Abad are two relatively small porphyry copper-type deposits in Yazd Province in central Iran. They are located within the central Iranian volcano-plutonic belt, formed above t

    Jan 1, 2007

  • CIM
    Distributions of Flow Characteristics and Physicochemical Properties of Acid Mine Drainage in a Settling Pond

    By Dong-kil Lee

    Field tests have been conducted to investigate the characteristics of flow and physical chemistry of acid mine drainage(AMD) in the Hwangji-Yuchang settling pond in south Korea. pH and ferrous concent

    May 1, 2011

  • CIM
    Beneficiation of Concentrated Ultrafine Suspensions with a Falcon UF concentrator

    By Jean-Sébastien Kroll-Rabotin, Éric Climent, Florent Bourgeois

    "Falcon concentrators are enhanced gravity separators designed for concentrating fine and ultrafine slurries. The Falcon UF model is unique in that it is dedicated to beneficiation of ultrafines, one

    Jan 1, 2011

  • CIM
    Application of conditional simulations to resource classification schemes

    By M. E. Rossi, J. E. Camacho

    "Geostatistical conditional simulations are becoming increasingly popular as tools that provide models of uncertainty at different stages of a mining project. They have been used as grade control tool

    Jan 1, 2004

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    Developments In Copper Smelting: A Discussion of Changes in Copper Technology and Science as Seen through the Lens of Professor Davenport’s TEXTS

    By Phillip J. Mackey, Gerardo R. F. Alvear F.

    It is now 38 years since the publication of the first edition of "Extractive Metallurgy of Copper" by Professor W.G. Davenport and the late Professor A.K. Biswas. The text book would be issued in a to

    Jan 1, 2014

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Operational Data and Maintenance Reliability

    By Justin S. Johnsen

    As OEM sensors and interfaces have grown in number, the available data from equipment in the mining environment has continued to multiply. This equates to an increased visibility of operating performa

    Nov 1, 2011