Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Accidents in the Broken Hill Mines

    The importance of the Broken Hill mining field may be gauged from the fact that since the discovery of the ore-body in 1883, till the end of 1931, approximately 43,000,000 tons of ore have been raised

    Jan 1, 1932

  • AUSIMM
    Williamstown Industrial Mineral Deposits - A New Lease of Life

    By Olliver J. G

    Over 400,000 tonnes of kaolin, sillimanite, mica, kyanite, feldspar and rutile have been mined from the unique Williamstown orebodies since their discovery in the early 1900's. Numerous compan

    Jan 1, 1989

  • AUSIMM
    Methods of Treatment of McArthur River Mixed Concentrate

    Various steps, and complete sequences, for the recovery of lead and zinc from a mixed sulphide concentrate, high in silica and pyrite, have been tested.Oxidation steps of roasting in air or in a sulph

    Jan 1, 1975

  • AUSIMM
    Water Resources in Australian Mine Pit Lakes

    By M A. Lund, C D. McCullough

    In Australia and worldwide, open cut mining has become increasingly common over the last few decades through changes in excavation technology and ore economics. However, such operations frequently lea

    Jan 1, 2009

  • AUSIMM
    Stannite Ore from Oonah Mine, Zeehan, Tasmania

    Ore from the "Staimite" lode in the Oonah mine, Zeehan, has a complex composition and contains an exceptional number of elements. Its chemical composition has been indicated by the following

    Jan 1, 1931

  • AUSIMM
    Paper No. 175. The Disposal of Residues at Kalgoorlie.

    THE method depends upon:--1. The position of the mill.2. The space available for stacking the residue.3. The nature of the residue as discharged from the mill.4. The value of the residue for re-treatm

    Jan 1, 1909

  • AUSIMM
    A New Method for Coal Pillar Design

    By KEITH BARRONI

    In the proposed criterion for coal a distinction is made between brittle and "psuedo-ductile" failure. This criterion is the basis for the development of new equations for coal pillar streng

    Jan 1, 1988

  • AUSIMM
    Geotechnical Milestones at Mount Lyell Mine

    By D A. Cuello, G B. Sharrock

    The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined un

    May 9, 2016

  • AUSIMM
    Phytostabilisation and Phytomining – Principles and Successes

    By R L. Chaney, M Mahoney

    Mine and ore beneficiation wastes and smelter contaminated soils often cause phytotoxicity and threaten adverse environmental effects if not remediated. Science has clarified both the risks from soil

    Jul 16, 2014

  • AUSIMM
    Block Caving - Controllable Risks and Fatal Flaws

    Block caving is the lowest cost underground mining method but it has relatively high risks and a high up-front capital and development cost. It has application to large, often lower-grade orebodies wh

    Jan 1, 2000

  • AUSIMM
    Analysis of Progressive Seismicity and its Correlation with Geotechnical Variables at the El Teniente Mine

    By A Brzovic, E Córdova

    In an underground mine, different mining activities such as undercutting and cave progression generate redistribution in the present in situ stress field, and these changes are represented in the rock

    May 9, 2016

  • AUSIMM
    The Manufacture of Sulphuric Acid and its Use in Metallurgy

    Owing to the number of chemical processes now in use for the separation of metals from their ores, and the consequent employment of chemicals at the mine, it is sometimes necessary to be able to produ

  • AUSIMM
    Effect of Temperature on Removal of Phosphorus from Australian Goethitic Iron Ores

    By B M. Washington, R R. Lovel, G J. Sparrow, M J. Fisher-White

    "Work in CSIRO with several Australian ores has shown that?by heating a high-phosphorus goethitic iron ore and then leaching with caustic or acid, the phosphorus levels in the ore can be lowered to a

    Aug 12, 2013

  • AUSIMM
    Preparation of Iron Oxide Feed Stock for Pig Iron/Sponge Iron Production - Role of NMDC

    By Sahoo K. C

    Traditionally, the blast furnace (BF) has maintained a dominant position as the primary source of iron units. Notwithstanding the efficient nature of the process in respect of its material and energ

    Jan 1, 1999

  • AUSIMM
    Enhancing the Business Environment for Prospecting, Exploration and Mining (Past and New Initiatives)

    By K L. Temel, W P. Player

    The underlying message of this paper is that investment in prospecting, exploration and mining in New Zealand is welcomed. The Government's policy with respect to Crown owned minerals is for cont

    Jan 1, 1997

  • AUSIMM
    A Preliminary Geotechnical Assessment for Re-Opening the Blackwater Mine

    By J Taylor, L Richards, M McKenzie

    When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.

    Jan 1, 1996

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    Characterisation of Coal Seam Gas Waters in New Zealand

    By D Nobes, D Trumm, D Manhire, A OÆSullivan, M W. Milke

    Coal seam gas (CSG) exploration and development requires the abstraction of significant amounts of water. This is so because gas desorbtion in coal seams takes place only after aquifer pressure has be

    Jan 1, 2005

  • AUSIMM
    The Use of Novel Approaches to Separate Heavy Minerals from AlbertaÆs Oil Sands

    By J Coward, S Bulatovic

    There are currently two operators producing oil from the surface-mineable portions of AlbertaÆs oil sands (Syncrude Canada Ltd and Suncor Inc) and two other companies are proposing to enter the indust

    Jan 1, 2001

  • AUSIMM
    Trommel panel development for iron ore applications

    By R Wilson, R Williams, B Freeburn

    McLanahan RSS14x50 scrubber screens have individually processed over 50 Mt of Pilbara iron ore. The first stage of separation in these plants with abrasive, high specific gravity, large lumps is an ex

    Jul 24, 2017