Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Platinum Group Metals Recovery from Recycled Autocatalyst by Aqeous Processing

    By Distin P. A

    The extraction of platinum and rhodium from scrapped honeycomb autocatalyst into hydrochloric acid/aluminum chloride/nitric acid solutions is described. Results are given for the effects of leachant

    Jan 1, 1992

  • AUSIMM
    Computer Methods for Mine Geology at Hellyer

    By Kuipers A. J

    Aberfoyle has been applying computer methods to mine geology in small to medium-sized underground mines since the early 1980's. Recently, the installation of DATAMINE software at the Hellyer Mine

    Jan 1, 1990

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Improved iron ore processing through digitalising conveyed ore flowsusing representative real time multi-elemental analysis

    By H Kurth

    High specification Prompt Gamma Neutron Activation Analysis (PGNAA) has been successfully applied to conveyed flows at iron ore operations since 2002 to representatively measure ore quality for improv

    Sep 18, 2023

  • AUSIMM
    Frequency Size Distribution for Iron Ore Fines Size Analysis

    In presenting size analysis data, one has the choice of various graphical techniques; each no doubt has been developed to highlight a particular aspect of the data. A frequency size distribution plot

    Jan 1, 1992

  • AUSIMM
    Roasting for antimony removal from Greenbushes materials-laboratory studies

    By Floyd JM, Bultitude-Paul J

    The development of a process for the extraction of antimony from materials produced by Greenbushes Tin Limited has been carried out based on theoretical and laboratory studies. The materials treat

    Jan 1, 1986

  • AUSIMM
    Chasing the Lead/Zinc/Silver Lining – Establishing a Resource Model for the Historic CML7, Broken Hill, New South Wales, Australia

    By D Smith

    The Broken Hill deposit is located in Australia in the far western region of New South Wales. The deposit was found in 1883 and has been mined continuously since its discovery. It is considered the la

    Aug 22, 2011

  • AUSIMM
    Residue Treatment Plant Practice at Risdon, Tasmania

    By Garrigan J. S, Oakes I

    Current operating practice in a plant commissioned some five years ago to treat ferritic zinc plant residue by the "Jarosite" process is described. Major problems overcome include obtaining reliabl

    Jan 1, 1977

  • AUSIMM
    Continuous Haulage Prospects for Underground Coal Mines

    Detailed observations were made for two existing continuous miner and shuttlecar systems. A simple model for the shift average cycle consisted of three time components - delays, mining and transport

    Jan 1, 1982

  • AUSIMM
    Reducing waste in the iron ore industry by beneficiating slimes using new flotation regime and two-stage processing routes

    By N Lima, A Piçarra, L Filippov, I Filippova, M Marques, K Silva

    The iron industry produces a considerable amount of tailings per annum, due to its substantial volumes of production. The actual iron ore processing routes require the removal of slimes fractions. In

    Sep 18, 2023

  • AUSIMM
    Solid bowl decanter centrifuges – the alternative technology

    By M Player, R Klug, N Schwarz

    There are several technologies available for thickening and dewatering of mining process slurries. The most commonly used are thickeners and filters, but technological developments have made solid bow

    Jul 1, 2021

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    Implementation of Mine to Mill Blast Optimisation at Porgera Gold Mine

    By S S. Kanchibotla, D La Rosa, R W. Pesch

    The Porgera Joint Venture and Dyno Nobel have commissioned a joint project to optimise the drill and blast operations to increase the overall profitability of the mine. One of the aims of this project

    Jan 1, 2003

  • AUSIMM
    Quantitative Kriging Neighbourhood Analysis for the Mining Geologist ù A Description of the Method With Worked Case Examples

    By J Vann, S Jackson, O Bertoli

    Ordinary kriging and non-linear geostatistical estimators are now well accepted methods in mining grade control and mine resource estimation. Kriging is also a necessary step in the most commonly used

    Jan 1, 2003

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    DeGrussa Copper Mine, Western Australia - Feasibility to First Production: A Case Study in Developing a Working Geometallurgy Model from First Principles

    By P Vass, C Butler, J Condon, B Hooper

    DeGrussa Copper Mine, resource status 10.2 Mt at 5.7 per cent Cu, 2.1 g/t Au (Sandfire Resources, 2013), commenced concentrate production through its 1.5 Mt/a conventional copper flotation processing

    Sep 29, 2013

  • AUSIMM
    The Steelmaker's Contribution to Shipbuilding

    The object of this paper is to give an insight into various metallurgical operations involved in the making and shaping of steel for shipbuilding at the Newcastle plants of the Broken Hill Proprietary

    Jan 1, 1951

  • AUSIMM
    Recent Advances in Iron Ore Sintering

    By O Ishiyama, L Lu

    Sintering is the most economic and widely used agglomeration process to prepare iron ore fines for blast furnace use. Due to the depleting reserves of traditional high-grade iron ore, there have been

    Jul 13, 2015

  • AUSIMM
    Ultra-Deep Hoisting Technology at Moab Khotsong

    By M Dohm, L Pretorius

    This paper provides a brief historical background to the approximately 12-year project that led to the revision of rope selection factors in the South African regulations, thus providing the ability t

    Jan 1, 2005