A Detailed Assessment of Concentrator Performance at Broken Hill South Limited (a6fcafc6-c375-4bcb-a3c6-c657d3498196)
By Restarick C. J & Stewart P S B, Kelsall D. P
Over a four-hour period of steady plant operation samples were taken at regular intervals from points within the grinding and flotation circuits. Size fractions of each composite sample were analyse
Jan 1, 1980
-
Retreatment/Flotation Rationalisation at Renison
Revised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap
Jan 1, 1991
-
Strata Support Interaction on a Powered Support Longwall Face Under a Massive Dolerite Sill - A Study
By Ghose AK
Design and selection of support systems for longwall faces call for in-depth know- ledge of strata mechanics and in particular of strata-support interactions. The paper presents the results of fiel
Jan 1, 1992
-
A Comparison of Drilling and Sampling Techniques as They Relate to Base and Precious Metal Exploration in the Mt Isa Inlier of North West Queensland and the Southern Lachlan Fold Belt in New South Wales
Universal Resources Ltd has acquired a large portfolio of high quality exploration projects in two of Australia's most prospective regions for base and precious metal exploration: the Mt Isa Inli
Mar 1, 2010
-
Roof Depressurization for Total Extraction Mining Trials Collie Basin, Western Australia
By Hebblewhite B, Humphreys D
An experimental mining project has been carried out in the Collie Basin to demonstrate the safe operation of total extraction mining techniques in the underground mines of the basin. To achieve this
Jan 1, 1988
-
Are Mining Geologists Really Necessary?
Alternatively are they a necessary evil'? Exploration geologists are a much higher profile group but then again the higher they are the bigger they Bill. At a mine site they are reluctantly being
Jan 1, 1997
-
Uranium Mining Operations at Ranger Northern Territory, Australia
By Savory P. J
Uranium mining operations commenced at Ranger mine site, Jabiru NT Australia in May 1980. The Ranger orebodies, totalling approximately 110 000 tonnes contained U305 had been indicated by airborne rad
Jan 1, 1993
-
Use of Draglines - Where to in the 21st Century
Draglines have been a significant part of world open cut mining since the early part of the 20th century particularly for the removal of overburden in the strip mining of coal. Since the mid-1960s dra
Jan 1, 1992
-
Experience at Goonyella/Riverside Mine with a Bucket Wheel Excavator System and Shovel/Truck Systems for Prestripping Overburden
A conventional Bucket Wheel Excavator (BWE) system with conveyor transport, mobile tripper and spreader was commissioned at the Goonyella Mine in 1982. The system was introduced to prestrip ahead of d
Jan 1, 1992
-
A Statistical Approach to Estimating the Number of Grains of Particulate Material in Geological Samples.
By Beck RW, Booth GW
Differences in the gold contents of sub-sample duplicates, derived from a single bulk sample are a function of analytical and random error, inhomogeneity within the bulk and natural variations in t
Jan 1, 1989
-
The Monitoring of Mineral Processing Operations Using Computer Vision and Neural Networks
By Bezuidenhout M, Moolman D. W
In the minerals industry numerous problems cannot be solved by conventional mathematical models owing to their complexity or a lack of phenomenological understanding. Neural networks provide one way
Jan 1, 1997
-
Underwater Blasting in Landslide Blocked River
By Dhawan AK
On 8 July 1993, a landslide of about one million cubic metres of rock blocked the river Satluj near Sanjay Vidyut Pariyojana - Bhaba project and caused flooding into the Bhaba Power House (120 MW) r
Jan 1, 1995
-
Critical Apraisal of Pillar Design as Required by Coal Mines Regulations of India Vis-Vis Latest-Rockmechanics Formulae
By Singh DP, Singh TN
The present study attempts to critically review the pillar-design as required by Coal Mines Regulations of India vis-a-vis latest rockmechanics formulae. Equivalent material modelling was the appro
Jan 1, 1992
-
A Second Derwent Crossing for Hobart
Proposals for engineering works in the River Dement in recent years have been made in the context of very little geological informat- ion. Breakage of the Tasman Bridge, forced a complete re-apprai
Jan 1, 1977
-
Mathematical Modelling of Heat Transfer in Flash-Smelting Burners
By Taylor R. N
Flow simulations have been performed on the flash-smelting burners currently used at KNS. This paper presents studies of the heat transfer between gas and particles at the burner exit. Gas and parti
Jan 1, 1992
-
Fragmentation and its Impact on Downstream Processing
The perennial challenge facing mining and minerals operators is to improve productivity, usually by a combination of cost reduction and performance improvement. In a typical production situation inv
Jan 1, 1997
-
Extensions to MelbourneÆs Telecom Cable Tunnel Network
By Gunn S. G, Wilson E. G
Studies by Telecom showed that the existing cable tunnel system in the Melbourne C.B.D. required expansion in order to meet the future telecommunications needs of the City. Due to physical locations
Jan 1, 1981
-
Preming Investigations for the Prediction of Hazards Ahead of Faces
The most appropriate technology needs to be applied to premining geological investigations to achieve reliable data for predictions of geological conditions ahead of mining. The paper describes th
Jan 1, 1988
-
Ventilation of Single Entry Developments at Ellalong Colliery
By Wallman D
Since 1981 two single entry roadways have been driven at Ellalong Colliery for a total distance of 1 030 metres. They were driven at a height of 1.73 metres within the 3.7 metres thick Greta Seam
Jan 1, 1983
-
Modified Open Cut Equipment in Underground Mining at King Island Scheelite
By McLaughlin R. G, Brammer R. A J
King Island Scheelite had been using dealer modified front end loaders for two years when in 1974 it started to increase production. Suppliers were then quoting long deliveries for underground die
Jan 1, 1977