Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
BHP Billiton Iron Ore Car Dumper 4 - Temporary WorksBy D Ford
BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow
Jan 1, 2007
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
Uncertainty Based Push-Back Design Algorithm In Open Pit MiningBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
An independent analysis of the 2006 draft royalty bill for the South African mineral and petroleum sectors - SynopsisBy F. T. Cawood
This paper reviews the Mineral and Petroleum Resources Royalty Bill of 2006, identifies potential areas that require further consideration by the National Treasury and, where appropriate, offers alter
Jan 1, 2007
-
SAG Mill Operation at Cortez: Evolution of Liner Design from Current to Future OperationsBy Raj K. Rajamani, Sanjeeva Latchireddi, Dave Plummer, Stieger. Julius
"The Cortez SAG mill liner design was recently modified to improve the mill operating energy efficiency. In addition to the expected benefits, the design change unexpectedly played a significant role
Jan 1, 2007
-
Annual Review 2006 – Mining ReviewBy Staff
The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several stages—basic (mining), intermediate processing, manufacturing of finish
Jan 1, 2007
-
The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply SystemBy Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole
Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands
Jan 1, 2007
-
Alignment Of SAMREC Reserve With Mining PlanBy L Tolmay, L Nair
Investor confidence can be compromised when one observes large discrepancies between the SAMREC reserves and the mining plan. It is therefore up to the responsible persons to ensure that all contribut
Jan 1, 2007
-
Simulation Modeling Validates Load and Haul Requirements at Cortez Gold MinesBy W. L. Jacobsen, T. L. Dyer
Cortez Gold Mines completed a feasibility study for a new openpit gold mine in north central Nevada. The production schedule calls for a peak in material movement. This schedule is based on current op
Jan 1, 2007
-
Improving Cfd Analysis Of Dc Furnace Operation By Refining And Addition Of Transportation Phenomena ModelsBy M. Shapiro, L. A. le Grange, B. Henning
A paper was presented by Bateman Minerals and Metals at INFACONX (2004) describing a simplified Computational Fluid Dynamics (CFD) Model for predicting the temperature and velocity distributions in al
Jan 1, 2007
-
The Stress-Strain Behaviour Of In-Stope Pillars In The Bushveld Platinum Deposits In South AfricaBy B. P. Watson
In South Africa, the Bushveld platinum group metal deposits are unique in that they are the largest platinum group metal deposits in the world. These deposits occur as two distinct stratiform tabular
Jan 1, 2007
-
Overview of the New Zealand Mining Industry 2006/07By R G. Barker
This paper reviews the annual status of the New Zealand mining industry (metallic minerals and coal) including key aspects such as mineral production, mineral exploration expenditure, commodity price
Jan 1, 2007
-
The Influence of the Fe3+/Fe2+ Redox Couple on the Chalcopyrite LeacidngBy E. M. Córdoba
The effect of the Fe3+ lFe2+ redox couple on the chemical and biological dissolution of chalcopyrite was studied. All the tests were carried out in stirred flasks with 100 mL of a ferric/ferrous sulph
Jan 1, 2007
-
Portable XRF analysis of occupational air filter samples from different workplaces using different samplers: final results, summary and conclusionsBy Martin Harper
This paper concludes a five year program on research into the use of a portable X ray fluorescence (XRF) analyzer for analyzing lead in air sampling filters from different industrial environments, inc
Jan 1, 2007
-
The Derrick Stack Sizer™: Revolutionary Advancements in Wet Screening TechnologyBy Benjamin H. Clark
"For over 50 years, Derrick Corporation has been renowned for its innovative and durable fine screening equipment and screen surface technology. Derrick’s latest innovation, the patented Stack Sizer,
Jan 1, 2007
-
Recovery of Osmium and Rhenium from the Copper Ores of KazakhstanBy Z. S. Abisheva
The Zhezkazgan copper sulfide ore deposit in Kazakhstan contains both rhenium and the rare osmium isotope "osmium-187" (187Os) in the high isotopic purity of 99.4 ± 0.2%. This isotope is believed to h
Jan 1, 2007
-
Electrolytic Treatment Of Highly Contaminated Effluents From Copper SmeltersBy S. R. Stopic
The EU-financed INTREAT Project (Integrated treatment of industrial wastes to¬wards prevention of regional water resources contamination) addresses the environmental pollution associated with solid an
Jan 1, 2007
-
Joint Water Pollution Control Plant Tunnel and Ocean Outfall ProjectBy Steve Dubnewych, Jon Kaneshiro, Calvin Jin
The Joint Water Pollution Control Plant (JWPCP), operated by the Sanitation Districts of Los Angeles County (the Districts), treats wastewater generated by over3 million people and processes wastewate
Jan 1, 2007
-
Three-Seam Stress Analyses at Bowie Mines, ColoradoBy Hamid Maleki
In this paper, the authors present a review of data gathering programs and stress analyses for improving mine layout designs at BRL mines located near Paonia, Colorado. BRL and other companies have
Jan 1, 2007
-
A Preliminary Investigation of Hydrothermal Alteration at the Rahu and Ascot Epithermal Au-Ag Prospects, Southern Hauraki Goldfield, New ZealandBy P Licence, M Stevens, P Atkinson, J L. Mauk
The Rahu and Ascot epithermal Au-Ag prospects are two km north of the Karangahake deposit in the Hauraki Goldfield, and all occur in an approximately 6 km2 north-south elongated magnetic æquietÆ zone.
Jan 1, 2007