Search Documents

  • SME
    King County’s Project Delivery Approach for the Brightwater Project

    By William W. Edgerton, Calvin Locke

    INTRODUCTION King County, Washington operates a regions wastewater treatment system that provides treatment to 18 cities and 16 sewer districts in the greater Seattle metropolitan area. The system

    Jan 1, 2005

  • SME
    The Globe Hill Breccia-Hosted Gold Deposit, Cripple Creek District, Colorado - Introduction

    By A. D. Trippel

    The Cripple Creek Mining district is located in Teller County, Colorado, 30 km west of Colorado Springs and 9 km southwest of Pikes Peak (Fig. 1). Since its discovery in 1891, the district has produce

    Jan 1, 1986

  • NIOSH
    RI 3885 Exploration of Red Mtn. Chromite Deposits - Kenai Peninsula, AK

    By F. A. Rutledge

    "The chromite deposits of Red Mountain, 10,miles southeast of Seldovia, Alaska, are in an intrusive of ultramafic rocks. The earliest reference to the deposits was made by U.S. Grant3/; J.B. Mertic, J

    Apr 1, 1946

  • RMCMI
    Producing Liquid Fuels from Coal

    By James T. Bartis

    Review of Key Issues Affecting the Prospects of CTL in the United States ?Issues of concern to the public - Impacts of coal mining - Water use - Greenhouse gas emissions ?Issues of concern t

    Jan 1, 2009

  • SME
    Economics Of The Treatment Of Gold Plant Tailings In High Rate Thickeners (a8dd0c9f-cb3e-40a6-ba3f-3d542a0d1f62)

    By I. M. Arbuthnot

    Over the last five years, a large number of small to medium sized carbon-in-pulp gold treatment plants have been built in Australia, most designed to treat between 250,000 -1,500,000 tpa of ore. In ma

    Jan 1, 1991

  • SME
    Ultrafine Coal Single-Stage Dewatering And Briquetting Process

    By J. W. Wilson, Y. Ding

    In the ultrafine coal-cleaning process, small coal particles (-400 mesh) are produced during the pulverizing operation. After the coal-cleaning process, these ultrafine particles are very difficult to

    Jan 1, 1996

  • AIME
    Get Your Reduced Railroad Fare Certificate

    By AIME AIME

    ANNOUNCEMENT of the annual meeting to be held Feb. 18 to 22 inclusive will be mailed the latter part of the month to all members. Particular attention is called to the fact that application has been m

    Jan 1, 1929

  • SME
    Bureau Of Mines Research In Injection Well Construction And Environmental Aspects Of Insitu Uranium Leaching

    By Daryl R. Tweeton

    Bureau of Mines research in in situ uranium leaching includes injection well construction and environmental aspects. Clogging of injection wells is a common problem, and is affected by construction te

    Jan 1, 1978

  • AIME
    Papers - Theoretical - Flow of Heat from an Intrusive Body into Country Rock (T. P. 1677, with discussion)

    By C. E. Van Orstrand

    An intrusive body is a mass of igneous rock that has migrated upward, presumably from great depths. Great variations in form, composition and depth of burial occur. It is not proposed in this paper to

    Jan 1, 1946

  • AIME
    Papers - Theoretical - Flow of Heat from an Intrusive Body into Country Rock (T. P. 1677, with discussion)

    By C. E. Van Orstrand

    An intrusive body is a mass of igneous rock that has migrated upward, presumably from great depths. Great variations in form, composition and depth of burial occur. It is not proposed in this paper to

    Jan 1, 1946

  • IMPC
    Theoretical Principles of Mechanical Activation during Processes in New Construction Mills

    By Lj. D. Andric

    Development of modern devices for mechanical and mechanochemical materials activation has been dated since the beginning of last century. Rapid development of high-energy mills that are different in

    Jan 1, 2014

  • TMS
    Recent Progress In Thermal Ditfusivity Measurement Of Molten Oxides By The Laser Flash Method

    By Hiromichi Ohta

    Precise thermal properties of molten materials are essentially required for analyzing the metal production process. These properties are also important as a clue to consider the dynamic structure of l

    Jan 1, 2003

  • SME
    Getting the Right Contract Package

    By W. W. Edgerton

    Construction projects may be delivered under one contract package or multiple packages divided by discipline, geographic location, or other characteristics. Dividing the construction into contract bid

    Jan 1, 2008

  • AUSIMM
    Application of Geostatistics to Gold Deposits

    Geostatistical methods have become well established in the last two decades for the evaluation of ore reserves in base metal, industrial minerals, coal and gold deposits of the Witwatersrand type. How

    Jan 1, 1992

  • SME
    Recovery Of Silver From Chloride Leach Solutions By Iodide Precipitation

    By T. G. Carnahan

    The U.S. Department of the Interior, Bureau of Mines, performed a laboratory-scale investigation of technique for recovering silver from pregnant solutions generated in the hydrometallurgical treatmen

    Jan 1, 1980

  • NIOSH
    RI 7996 Double Roast-Leach-Electrowinning Process for Chalcopyrite Concentrates

    By M. B. Shirts

    Numerous alternative processes have been proposed as being potentially more economical or less polluting than the traditional smelting of copper sulfide concentrates. One such process as recently deve

    Jan 1, 1975

  • SME
    3-D Modelling Of Mine Openings In Salt

    By M. K. Rizkalla

    This paper discusses the time-dependent behaviour of rock when it involves the presence of several layers of rock strata in the vicinity of mine openings, mining in sequences and the placement of back

    Jan 1, 1996

  • SAIMM
    Strapping of Pillars with Cables to Enhance Pillar Stability

    By J. Arzuúa, U. Castro-Filgueira, L. R. Alejano, F. Malan

    "Pillar design for underground mining is typically done using empirical formulae or numerical modelling. Practical experience and recent literature, nevertheless, illustrate the shortcomings of these

    Jan 1, 2017

  • AIME
    Production - Domestic - Oil and Gas Production in the Texas Gulf Coast during 1941

    By Jack F. Harang, P. B. Leavenworth

    Development during the year 1941 on the Texas Gulf Coast resulted in the dis covery of 27 new fields as compared to 26 fields for the year 1940. Drilling.—During the year, 1405 wells were drilled.

    Jan 1, 1942

  • AIME
    Production - Domestic - Oil and Gas Production in the Texas Gulf Coast during 1941

    By P. B. Leavenworth, Jack F. Harang

    Development during the year 1941 on the Texas Gulf Coast resulted in the dis covery of 27 new fields as compared to 26 fields for the year 1940. Drilling.—During the year, 1405 wells were drilled.

    Jan 1, 1942