Search Documents

  • SAIMM
    The Anisotropic Nature Of Selected Metamorphic Rocks From Greece (7c2b838c-2683-4593-b408-af708bc34e51)

    By H. Saroglou

    Anisotropy is a characteristic of intact foliated metamorphic rocks (slates, gneisses, phyllites, schists). Testing was used to establish the anisotropic behaviour of selected gneissic rocks. The effe

    Jan 1, 2004

  • AUSIMM
    The exploration history, geology and metallurgy of a High Sulphidation Epithermal gold deposit at Wafi River, Papua New Guinea

    By Lewis PJ, Halfpenny R, Craighead GA

    Exploration drilling by Joint Venture partners CRA Exploration Pty Ltd and Elders Mining PNG Pty Ltd has discovered a signif- icant copper and gold deposit at the Wafi River prospect, 60km WSW of L

    Jan 1, 1991

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No. 3 Shaft

    Konkola No 3 shaft experienced severe mining-induced stress and time-related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • AUSIMM
    Tectonic Development of the Gippsland Basin and Environs: Identification of Key Episodes Using Apatite Fission Track Analysis (AFTA)

    By Green P. F

    Apatite Fission Track Analysis (AFTA) is a thermal history reconstruction tool that enables determination of magnitude and timing of maximum paleotemperature and paleo-geothermal gradient at the tim

    Jan 1, 1992

  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • AUSIMM
    Swamp Works – A New Approach to Develop Space Mining and Resource Extraction Technologies at NASA’s Kennedy Space Center: Prospecting, Excavation, Load, Haul and Dump for In Situ Resource Utilisation

    By A J. Nick, I I. Townsend, J M. Schuler, J D. Smith, R P. Mueller, L Sibille, K Leucht, J J. Fox

    The first steps for in situ resource utilisation (ISRU) on target bodies such as the Moon, Mars and near-Earth asteroids (NEA), and even comets, involve the same sequence of steps as in the terrestria

    Nov 4, 2015

  • SME
    MinExpo 2008: The Biggest Ever

    From the massive equipment that moves the earth, to the parts that keep the equipment moving, it was all on display for more than 35,000 people who at-tended MinExpo 2008 at the Las Vegas Convention C

    Jan 1, 2008

  • SAIMM
    Experiential Training Of Technicians

    By J. du Plooy

    Mintek has implemented a training scheme that provides students with the experiential training requirement for the National Diplomas in Chemical Engineering and Extraction Metallurgy. This note descri

    Jan 1, 1998

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • ISEE
    Vibration Spectral Mapping

    By Gordon M. Matheson, Douglas A. Anderson, David K. Miller

    "Traditionally, analysis of vibrations from blasting has been focused on peak particle velocity fordetermining the likelihood of both annoyance and damage. The US Bureau of Mines, in RI 8507,indicated

    Jan 1, 1997

  • SAIMM
    Simulated Rockburst Experiment: Development Of A Numerical Model For Seismic Wave Propagation From The Blast, And Forward Analysis

    By M. W. Hildyard

    A blast was engineered close to a tunnel in a deep-level mine with the purpose of studying the wave interaction with the tunnel. Numerical modelling of seismic wave propagation was used in both the fo

    Jan 1, 2001

  • SME
    Performance Monitoring Of A Block Cave Mine Using Signal Processing And Waveform Analysis Of GPS Data

    By D. Rutledge

    Discrete (digital) signal processing techniques are proving to be very valuable tools for miners using the block cave method. Waveform analysis of different measured signals associated with active min

    Jan 1, 2008

  • CIM
    High Chromium White Irons for Slurry Pump Service in Mineral Processing

    By Rees J. Llewellyn

    High chromium white irons can be formulated to provide required combinations of abrasion and erosion wear resistance, toughness and capability to withstand corrosion attack. As a consequence, they are

    May 1, 2004

  • SAIMM
    Second Reply To R. Altindag ?Brittleness And Drillability? - In The Journal Of SAIMM, Vol 103. No. 8. Pp. 525

    By H. G. Denkhaus

    Please allow me the temerity to reply to your reply to my contribution as follows: A fracture is brittle if plastic deformation is absent or, conversely a fracture is ductile if plastic deformation

    Jan 1, 2003

  • SME
    Evaluation Of Blast Fragmentation In Quarries Nearby Istanbul ? Introduction

    By T. Hudaverdi

    Control of the particle size distribution of a muckpile after blasting is always an important subject for mining industry. Blasting has a significant impact on downstream processes such as loading, cr

    Jan 1, 2012

  • CIM
    Iron Behavior in Nickel Laterite Inverse Leaching Process

    By L. Su, S. Liu, K. Jiang, K. Xie

    The reduction of iron dissolution and acid consumption is fairly important in the extraction of Ni and Co from laterite ores from both economic and efficiency perspectives. BGRIMM conducted detailed r

    Jan 1, 2016

  • AUSIMM
    Successfully Implementing Technology-driven Change in the Mining Environment

    By B McCarthy

    Mining has been typified of late as a boom and bust, cyclical industry operating against a steady decline in the size and quality of mineral deposits. Decreasing deposit grades and increasing costs of

    Jun 22, 2016

  • DFI
  • SME
    SelectionConsiderations - Using a Consultant

    By Alfred Weiss

    Selecting a minicomputer is not unlike selecting a costly piece of mining equipment such as a truck, shovel, crusher, or conveyor belt system. A marked difference might lie in the frequency at which s

    Jan 11, 1981

  • SME
    Risk Ranking In Tunneling Projects With Fuzzy Electre Method

    By A. Yazadni-Chamzini

    Risk ranking of projects is one of the importance parts of the complicated risk management procedure. Recognizing the riskiest criteria enable the managers to plan for risk reduction. The first stage

    Jan 1, 2012