Search Documents

  • NIOSH
    IC 9143 Bureau Of Mines Cost Estimating System Handbook (In Two Parts) 2. Mineral Processing

    This Bureau of Mines report and its companion report (Information Circular 9142) have been prepared to assist in the preparation of prefeasibility type estimates for capital and operating costs of ben

    Jan 1, 1987

  • CIM
    Oil-Field Waters of Alberta and Saskatchewan

    By W. P. Campbell

    Introduction OWING to the necessity of curtailing the length of this paper, nothing like an exhaustive treatment of the subject will be attempted. Instead, merely a few aspects will be considered,

    Jan 1, 1929

  • AUSIMM
    Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)

    By Gordon DM

    Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap

    Jan 1, 1983

  • AUSIMM
    Implications of the New Legislative Environment for the Mining Industry

    The new legislative regime applying to the mining industry has been in force for nearly two years. However the parameters for the permits required under the Crown. Minerals Act 1991 and the resource c

    Jan 1, 1993

  • DFI
    Deep Vibrocompactation By Stone Columns And Liquefaction Investigation

    By P. Ventura

    Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde

    Jan 1, 1989

  • NIOSH
    OFR-149-77 Dust Control On Auger-Type Mining Machines, Using The Wet Auger System

    By G. J. Hundman

    Control of respirable dust produced by auger type continuous mining machines is normally attempted by water sprays from fixed nozzles mounted on the frame of the machine. In tests conducted under this

    Jan 1, 1977

  • NIOSH
    IC 8018 Helium Production At The Bureau Of Mines Keyes, Okla., Plant ? Introduction And Summary

    By W. M. Deaton

    The Keyes Helium Plant of the Federal Bureau of Mines was constructed under an expedited schedule, to supply the urgent and growing demand for helium in atomic energy, missiles, aerology, space explor

    Jan 1, 1961

  • AUSIMM
    Zinc extraction and refining (d2ff8c77-a915-4b29-b3fc-8901b38144f0)

    The history of zinc production in Australia is outlined including attempts to make zinc electrolytically at Cockle Creek, N.S.W. in the last century, the use of horizontal retorts at Cockle Creek and

    Jan 1, 1986

  • SME
    Cost Estimating Standards For International Reporting Of Ore Reserves: What Are They? What Should They Be?

    By O. Schumacher

    Guidelines for publication of information defining the amount and grade of resource material available in a deposit are well established in Australasia?s JORC Guidelines, Canada?s National Instrument

    Feb 27, 2013

  • DFI
    The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment

    By James E. Parkes

    The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station

    Jan 1, 2011

  • SAIMM
    The Evaluation Of Rock Brittleness Concept On Rotary Blast Hole Drills

    By R. Altindag

    The rock brittleness is one of the most important rock properties that affect the drill-ability of rocks. It is supposed that the increase in rock brittleness causes the increase in penetration rate.

    Jan 1, 2002

  • CIM
    What are the Opportunities and Challenges for Women in Fly-in-fly-out (FIFO) Mining in Canada? An Exploratory Study

    By Costa

    The fly-in-fly-out (FIFO) mining model has significant implications for the industry as it plays an important role in fulfilling the economic, social and workforce needs of the contemporary mining ind

    May 1, 2006

  • SME
    Development of Slurry Wall Technique and Equipment and CSM Cutter Soil Mixing for Open Cut Tunnels

    By W. G. Brunner

    The slurry wall technique has undergone an evolution from its invention to its today’s status. In the early stages slurry walls were built with cable grab, later on with much stronger hydraulic grab a

    Jan 1, 2007

  • SME
    Sustainable Change of Coal Mining Regions

    By J. Kretschmann

    According to the model of product life cycles, the global coal mining industry is in the stagnation phase. The coal demand of the main consumer, China, has peaked in 2013 and is slowly declining. The

    Jan 1, 2019

  • SME
    How To Deliver Your Project On Time: An Owners? Procurement Strategy

    By Wayne Green

    The Regional Municipality of York, located north of the City of Toronto in Ontario, Canada, has experienced unprecedented growth during the past decade, with new home construction averaging 15,000 uni

    Jan 1, 2010

  • SAIMM
    Problem Of Non-Normality In Statistical Quality Control: A Case Study In A Surface Mine

    By B. Samanta

    A quality characteristic analysed through construction of the Shewhart control chart is required to be normally distributed. In mining applications, this assumption is often violated as many quality c

    Jan 1, 2004

  • AUSIMM
    The Risdon Sulfuric Acid Plant of the Electrolytic Zinc Company of Australasia Limited

    The acid plant consists of the following units: 1. Glover tower. 6. Mills-Packard type chambers. 3. Reaction towers. 6. Gay-Lussac towers.The sulphur dioxide bearing gases, used in the manufacture of

    Jan 1, 1934

  • SAIMM
    Effect Of Residual Tectonic Stresses On Roadway Stability In An Underground Coal Mine

    By B. Unver

    Effective strata control is a prerequisite for maintaining an efficient mining operation. If the strata in the vicinity of an opening are not controlled effectively, it is impossible to perform a safe

    Jan 1, 1999

  • DFI
    New Technologies For Quality Control Of Augered Cast-In-Place Piles

    By Tracy Brettmann

    In recent years the Augered Cast-In-Place (ACIP) Pile industry has seen a substantial increase in the quality control options available to Contractors, Engineers, and Owners. Quality control methods r

    Jan 1, 2000

  • NIOSH
    OFR-73-77 Longwall Mining Communications - I. Executive Summary ? A. Objective Of Work

    By Martyn F. Roetter

    The objectives of the work described in this report are to determine the communications requirements and need for communications, both for voice and control, on longwalls, and to make recommendations

    Jan 1, 1976