Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
New Zealand's Late Cretaceous - Early Tertiary Coal Fields û An OverviewLate Cretaceous and early Tertiary coals in the Greymouth, Ohai and Kaitangata coalfields represent a major national energy resource comprising-up to 2500 x 106 tonnes of coal in ground. The three coa
Jan 1, 1987
-
Studies of FUL Grout by ExperimentBy Pinghui J
The paper describes the detailed hydrogeological studies carried out prior to the sinking of twin shafts at British Coal's new mine at Asfordby, Leicestershire, UK. The test methods for assessi
Jan 1, 1988
-
Mine Planning at the Mae Moh Lignite Mine ThailandThe Electricity Generating Authority of Thailand own and operate an opencut mine supplying coal to on-site power stations at Mae Moh, 600 km North of Bangkok. The mine is being expanded from an an
Jan 1, 1986
-
Estimation of High Grade Copper Slope Grades in QTS North, Cobar Mines, Cobar NSWBy Schofield N. A
The cross-sectional method of stope grade estimation at Cobar Mines has consistently had several shoneomings, me most imponant of which being mat stope grade is significantly overestimated in the high
Jan 1, 1993
-
Geological Investigation in the Vicinity of Leichhardt Colliery Near Blackwater, QueenslandLeichhardt Colliery is developed for underground mining of coal seams at depths exceeding 280 m. Investigations of the area were conducted in phases, each designed to delineate seam characteristics
Jan 1, 1974
-
Electrowinning of Copper at High Current Densities Part IIBy Andersen AK
A previous paper (1) indicated that electrowinning of copper at current densities considerably higher than those currently employed in electrowinning operations is technically feasible. It is of int
Jan 1, 1969
-
An Integrated Approach to Evaluation of Blasts - A Case StudyBy Chung S
The problems associated with equating calculated and measured properties of explosives with blast results are examined. The results from six full-scale test blasts in a limestone quarry are describe
Jan 1, 1990
-
Pitfalls in the Preparation of Environmental Impact ReportsNew Zealand Steel Limited is nearing completion of the environmental reporting and planning procedures for its proposed fivefold expansion to steelmaking at Glenbrook, and supporting mining operations
Jan 1, 1981
-
Rock Breaking on the Melbourne Undergroudn Rail LoopTechniques and results achieved during the excavation of the Melbourne Underground Rail Loop (HURL) are summarised and discussed in the context of the various restraints present in a typical urban
Jan 1, 1978
-
Controlled Recirculation in South African Gold MinesControlled recirculation of nine ventila- tion air is becoming an acceptable practice world-wide. A brief review of operating and planned schemes is given which illustrates the various purposes for
Jan 1, 1988
-
Electron Microprobe Analysis in Mineral ExplorationBy Ramsden AR
The ability of the scanning electron microprobe to provide non-destructive qualitative and quantitative mineralogical analysis at the micrometre scale makes it a very versatile tool for the mineral
Jan 1, 1989
-
Hilton Mine Dewatering-North West Queensland, AustraliaBy Whincup P
Hilton deposit comprises en-echelon silver-lead-zinc orebodies with reserves in excess of 50 million tonnes. The host rock to the ore is a dolomitic and pyritic shale/siltstone which dips steeply we
Jan 1, 1988
-
A Modified Cable Bolt System For The Support Of Underground OpeningsBy Worotnicki G, Tillmann V. H
Past experience with fully bonded cable dowels placed as a means of reinforcement in highly stressed crop pillars at the New Broken Hill Consolidated Limited (NBHC) mine indicated such support was
Jan 1, 1983
-
Mining Equipment - Mine TransportationEQUIPMENT TO BE DISCUSSED It is the intention of this paper to discuss the transporting of large skid mounted equipment and track machines around open cut mines. By large I mean 100 to 350 tonne cap
Jan 1, 1989
-
Shotcrete Lining Design for Underground Excavations in Rock û The Current State of PracticeBy B Bendtsen, L McQueen
The use of shotcrete as an efficient means of both temporary and permanent ground support has continued to grow over the last 30 years, with its use underground now commonplace around the world. Howev
Jan 1, 2008
-
Performance of Different Constructive Solutions against Explosions in Full-scale Masonry WallsBy M Chiquito, R Castedo, P Segarra, L M. López, J A. Sanchidrián, J Navarro
The aim of this work is to assess the performance of different constructive solutions against explosions on the strength of masonry walls. The solutions tested, namely an external metal mesh, a glass
Aug 24, 2015
-
The Life Cycle of a Mine Tailings DamA case-study is presented of the tailings dam of Nairne Pyrites Pty. Ltd., at Brukunga, South Australia. The methods of-construction and operation of the dam are outlined over the whole working lif
Jan 1, 1975
-
Application of Pile Theory to Ground Support DesignBy Best R, Poulos H
This paper discusses the results of an Australian Coal Association Research Program project into the development of a routine analytical design method for roof support in underground mines. Simple d
Jan 1, 1995
-
An Outline of Blast Hole Diamond Drill Stoping at Mount IsaBy McConachie W. J
Introduction.Ore Bodies.Lead.Copper.Ground.Main Haulage Levels.Stope Preparation.Stoping Practice.General.Longitudinal Stopes-Ring Drilled.Parallel Hole Drilled.Transverse Stopes -Ring Drilled.Paralle
Jan 1, 1953
-
Experience with Tungsten Carbide Bits at Mount IsaThis paper aims to provide some' new and original thoughts on tungsten carbide drill-bits and describe practices and performances, some of which are unique and most of which have not previously b
Jan 1, 1953