Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Framework to Generate Accurate and Complete as-Built BIMS Based on Progressive Laser Scans

    By Te Gao

    It is a general expectancy that in most of the construction and renovation project, the contractor is going to hand over the as-built documents to the owner or the facility management team at the comp

    Aug 1, 2013

  • CIM
    Underground incentives - their development, application and effect at Brunswick No. 12 mine, Bathurst, New Brunswick

    By Robert W. Baker

    "Brunswick Mining and Smelting commenced production at the No. 12orebody, a lead/zinc/copper/silver deposit, situated some seventeen miles southwest of Bathurst, New Brunswick, in 1964 at 4100 tonnes

    Jan 1, 1995

  • CIM
    The Nine Keys to Maximizing Profits and Equipment Uptime through Inventory Management for Maintenance Parts

    By Robert Lamarre

    We will present the summary of a number of case studies whereby mining organizations have succeeded in maximizing equipment uptime by reducing the number of maintenance parts stock outs by more than 8

    Nov 1, 2011

  • CIM
    Effects of the Rolls’ Speed and Pressure on the HPGR Performance during Gold Ore Grinding

    By H. Dundar, C. Dzomeku

    An extensive testwork was performed around the HPGR plant at GoldFields Ghana Limited Tarkwa Gold Mine. The HPGR was used to prepare the feed for heap leaching. The circuit was configured in such a wa

    Jan 1, 2012

  • CIM
    Application of Deadtime and Gain Compensation to Sag Feeder Control at P. T. Freeport Indonesia

    By Andrew Neale, Len Anderson, Rob Perry

    "P.T Freeport Indonesia's new SAG mill commenced operation in February 1995. The reclaim system consists of four apron feeders and a series of three conveyors. The feeders are used in various combinat

    Jan 1, 1996

  • CIM
    Sustainable use of Geotechnical Data for Improved Mine Planning and Design Through Multi-Parametric Modeling

    By Andrew D. Lapworth

    The use of geological and grade models has been standard practice in mine design for many years now, with a wide range of software available to create and analyze the models. Although geotechnical par

    May 1, 2007

  • CIM
    Where Have All the People Gone? - Innovative Trends and Solutions for a Shrinking Mining Workforce

    By Robert J. McCarthy

    There are two things on everyone's lips when mining folks gather these days - one is the exciting business opportunities that now exist for mine development and expansion, and the other is the di

    May 1, 2008

  • CIM
    Study on Dynamic Characteristics of Frozen Soil by Using SHPB Test and Nurmerical Simulation Test

    By Z. Liang, Z. Q. Liu, X. F. Li, H. L. Zhang

    "Dynamic characteristics of frozen soil is important for the safe, effective and rapid construction in cold regions and artificially frozen engineering. In this paper, dynamic characteristics of froze

    Jan 1, 2015

  • CIM
    Consideration on Safety Aspects, Uranium Mining Operation, Uranium Processing and Management of Tailings in Romania

    By Gheorghe Vieru

    Security and safety due to environmental impact as well as the radiological consequences during the uranium mining operations, tailings management, uranium processing, disposal of waste in conventiona

    Aug 1, 2010

  • CIM
    Microstructural changes and high temperature mechanical behavior of an andalusite based low cement refractory castable

    By T. Cutard, E. Yeugo Fogaing, C. Gault, H. Marzagui, N. Prompt, M. Huger, C. Deteuf

    This paper deals with studies made in the field of the French research network PROMETHEREF. Several refractory castables are considered in this program. In the present paper, one of these materials is

    Jan 1, 2004

  • CIM
    Cadia Expansion – From Open Pit to Block Cave and Beyond (4a1cbd75-8ba9-4485-8c66-2de027979f5e)

    The Cadia mine is shifting from the open pit operation to the Cadia East underground block cave. The resulting increase in milled tonnes and the decrease in fines production through shifting to block

    Jan 1, 2012

  • CIM
    NUGGET: PC Software to Calculate Parameters for Samples and Elements Affected by the Nugget Effect

    By Clifford R. Stanley

    "Abstract - Reproducible analyses of representative samples for elements affected by the ‘nugget effect’ is vital in mineral exploration and reserve estimation. Unfortunately, a priori knowledge of wh

    Jan 1, 1998

  • CIM
    Effects of the Rolls? Speed and Pressure on the HPGR Performance During Gold Ore Grinding

    By H. Dundar

    An extensive testwork was performed around the HPGR plant at GoldFields Ghana Limited Tarkwa Gold Mine. The HPGR was used to prepare the feed for heap leaching. The circuit was configured in such a wa

    Jan 1, 2012

  • CIM
    Development of Ni-Base Single Crystal Superalloys Having a Balance Between Castability and Creep Strength

    By Yasuhiro Aoki, Akihiro Sato, Mikiya Arai

    In this study, a freckle formation model based on the Rayleigh number was applied to actual multi-component Ni-base single crystal superalloys and verified in large scale casting trials. Finally, new

    Jan 1, 2010

  • CIM
    BIM for Facility Management: Design for Maintainability with BIM Tools (Construction Science and Management Program)

    By R. Liu

    As Building Information Modeling (BIM) becomes widely adopted by the construction industry, it holds undeveloped possibilities for supporting Facility Management (FM). Some FM information systems on t

    Aug 1, 2013

  • CIM
    Logistic model applied to geophysical data for sulphide nickel exploration

    By R. Simard

    "Conventional exploration strategies identify many mineral deposits as potentially interesting, although only a few of them turn out to be of economic importance. In the context of exploration for sul

    Jan 1, 1980

  • CIM
    Going Coarser: is it Worth it?

    By H. C. L. Reemeyer

    One of the fundamental trade-offs for copper concentrators is between grinding circuit product size and copper recovery. The capital and operating cost savings and throughput increases for a coarser g

    Jan 1, 2019

  • CIM
    Thiol Collector Composition in Flotation of Platinum Group Metal Containing Cu-Ni Ores

    By A. A. Lavrinenko, N. I. Gluhova, L. M. Sarkisova, D. V. Makarov

    "The investigated sulfide Cu-Ni ores are characterized by low PGE contents and emulgated impregnations of pentlandite and palladium minerals in the main ore-forming mineral pyrrhotite, which hinders t

    Jan 1, 2016

  • CIM
    Solids Sampling at Australian Iron Ore Mine Sites (55a29317-25fd-4ddf-9f4c-115775e95e5b)

    By C. Matthews, A. Vo

    Australia is one of the world’s leading exporters of bulk commodities and the extensive use of sampling equipment is key to the successful management of each mining operation. At the process plant, wi

    Jan 1, 2019

  • CIM
    The 2019 Copper Smelting Survey

    By Joël P. T. Kapusta, Liam J. Watt

    The last extended copper smelting and converting survey dates back to the 2003 International Copper Conference held in Santiago, Chile. The following year, the Minerals, Metals, and Materials Society

    Jan 1, 2019