Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mineral Exploration Beneath Temperate Forests: The Information Supplied by Trees

    By Colin E. Dunn

    Abstract-Plants have a remarkable ability to select, use and store metals derived from the substrate. Each species is unique in its requirements for and tolerances to the full spectrum of chemical ele

    Jan 1, 1995

  • CIM
    Energy Conservation at Inco Metals Company: Compressed Air in Underground Mining

    By J. G. Cullain

    In conjunction with the over-all goals of energy conservation at Inco Metals Company, a program of improvement in compressed air utilization was established. Air flows were monitored and compared to c

    Jan 1, 1979

  • CIM
    Defining the Mineral Zones of Northern British Columbia

    By Forrest A. Kerr

    Introduction During recent years the work of the Geological Survey in northwestern British Columbia has been in the nature of reconnaissance and exploratory mapping, largely for the purpose of gainin

    Jan 1, 1931

  • CIM
    Preparation of Hydraulic-Cement Backfill

    By R. J. McLeod

    "A new backfill plant was constructed in 1966 adjacent to the mill of Giant Yellowknife Mines. The reasons for the addition were to increase the storage capacity for sand fill, provide facilities for

    Jan 1, 1968

  • CIM
    Development of a Heap Biooxidation Process for the Lahoca Refractory Gold Project

    By John Keay, Douglas R. Shaw, Gregory J. Olson

    "The results are presented herein of on-going laboratory investigations of heap bacterial oxidation as a pretreatment method for the recovery of sulfide-encapsulated gold from ore samples of the Rhode

    Jan 1, 1998

  • CIM
    Rock anchor support systems at Smoky River Coal Limited, Grande Cache, Alberta

    By R. F. Dawson, A. S. Bagnall, K. Barron

    "At Smoky River Coal Limited (SRCL), economic occurrences of structurally thickened coal deposits form attractive surface mining targets. These steeply dipping, structurally complex deposits require t

    Jan 1, 1995

  • CIM
    Rock anchor support systems at Smoky River Coal Limited, Grande Cache, Alberta (b00134fd-f294-4823-b57d-05c31c7f1dcd)

    By R. F. Dawson, A. S. Bagnall, K. Barron

    "At Smoky River Coal Limited (SRCL), economic occurrences of structurally thickened coal deposits form attractive surface mining targets. These steeply dipping, structurally complex deposits require t

    Jan 1, 1995

  • CIM
    Bibliography of Canadian contributions in the field of rock mechanics

    By P. E. Weidmark

    "PART 1-Published PapersAllcott, G.A., and Archibald, D.E.; ""Description of pillar behaviour at Heath Steele Mines""; Can Min Metall Bull; 74:834:80-87; 1981.Baar, C.A.; Discussion of Theme 1: ""Phys

    Jan 1, 1982

  • CIM
    A Unique Partnership at the Red Dog Mine - A Model of Cooperation

    NANA Accepts Mining ­ 1974 - Leadership presented mining option to people ­ Community meetings; recognized need for cash economy ­ 1979 - Poll shows consensus in favor of mine development ­ 1980 -

    May 1, 2002

  • CIM
    The Settlement Properties of Fine Multi-metals Tailings Modified by Flocculants in Shizhuyuan Mine of China

    By He Zhexiang

    The settlement properties of tailings modified by flocculants were investigated at the Shizhuyuan Mine, with the aims to screen for the most effective flocculants and the optimum dosage rates for tail

    May 1, 2007

  • CIM
    Erosion Control Hollinger Mine Tailing Site

    By I. M. Gordon

    "INTRODUCTIONThe Hollinger tailing disposal plant is situated about 1 1/4 miles south of the mill. The area available for tailing covers 620 acres and is roughly 1 ¼ miles long by ¾ mile wide.Tailing

    Jan 1, 1969

  • CIM
    Rubber Mill Liners General Discussion

    "ChairmanThis part of the discussion is intended as an exchange of information between those who have installed rubber liners in their mills and a means of others to get information that may help them

    Jan 1, 1968

  • CIM
    Automated Bridge Condition Assessment With Hybrid Sensing

    By R. S. Adhikari

    It is necessary to assess the physical and functional conditions of highway bridges at regular intervals to ensure they still meet their service requirements. Currently, this condition assessment is m

    Aug 1, 2013

  • CIM
    Northern Minerals Ltd, Browns Range Project: Process Flowsheet Improvements

    By T. Hadley, Northern Minerals Ltd, C. S. Griffith, T. A. Safinski, K. H. Soldenhoff, M. Fainerman-Melnikova, A. Manis

    "ANSTO Minerals and Northern Minerals have been working together since 2012 on the process flowsheet development for the Browns Range project for the recovery of the heavy rare earths (Dy – Lu, + Y).

    Jan 1, 2016

  • CIM
    Improved Seepage Water Quality by Establishing a Marsh on a Pyrrhotite Tailings Pong (1987 Final Report)

    By D. R. Griffiths

    "Oxidation of pyrrhotite prcxiuces sulphuric acid which in turn leaches out heavy metals, resulting in acidic contaminated seepages. The establishment of a marsh on top of the pyrrhotite would result

    Jan 1, 1988

  • CIM
    Sampling Quality Control

    By Marcel Vallée

    Abstract -Traditionally, samples collected for mineral deposit evaluation have been viewed without explicit reference to reliability, with the illusion that a true value is attainable from a few sampl

    Jan 1, 1998

  • CIM
    Mill Expansion at Les Mines Selbaie

    By K. Wood, L. Duval

    "The paper discusses the approach used to add a new, separate 5000 t/d copper-zinc treatment circuit to an existing, 1650 t/d copper circuit, essentially within the existing mill building. Temporary i

    Jan 1, 1987

  • CIM
    The Effect of LPF on the Leaching Process of a Weathered Crust Elution-Deposited Rare Earth Ore

    By Yan Qun, Chen Xiao-ming, Ma Pei-long, Luo Xian-ping, Luo Cai-gui, Feng Bo

    The effect of leach promoting reagent LPF on the leaching process of a weathered crust elution-deposited rare earth ore has been investigated and the mechanism is discussed. The result shows that the

    Jan 1, 2014

  • CIM
    Numerical Modelling of Rock Fracture with the Embedded Discontinuity Approach Incorporating Heterogeneity

    By T. Saksala

    In this paper, the embedded discontinuity approach is applied to finite element modeling of rock fracture. A rate-dependent constitutive model based on the embedded displacement discontinuity theory i

    Jan 1, 2015

  • CIM
    Steel Mill Dust Recycling Through the "2Sdr Process"

    By C. Pichler, J. Antrekowitsch

    During the production process of steel and other metals a lot of different by products are generated in high amounts. Some of these residues are recycled to recover valuable metals like zinc, lead, co

    Jan 1, 2014