In-Situ Resource Recovery Testing At San ManuelBy D. S. Ramey
In-situ leaching of the oxidized copper mineral resource at the San Manuel mine has proven to be a technically and economically viable method of copper extraction. Although this leaching method has be
Jan 1, 1993
-
Ore Reserve EstimationBy Alan C. Noble
Ore reserve estimation is a multi- disciplinary process involving not only tonnage and grade estimation (resource estimation), but also consideration of technical and legal aspects such as mining the
Jan 1, 1991
-
Process innovations at Golden SunlightBy E. F. Loros, T. J. Smolik, V. G. Lofftus
Since plant start-up in January 1983, Golden Sunlight Mines Inc. has implemented several process changes and improvements. Among these are a pulp preaeration circuit and a sand tailing retreatment cir
Jan 1, 1987
-
Technical Note - Beneficiation Of Iron Ore Slimes Using HydrocycloneBy B. Das, B. K. Mohapatra, K. S. Narasimhan, S. K. Bhaumik
The iron ore slimes (d80 ~ 50 µm) generated at Noamundi iron ore washing plant (TISCO), assaying 57% Fe, 4% Si02 and 8.3% A1203, have been subjected to hydrocyclone studies. The effects of different d
Jan 1, 1993
-
Specialized Urban Shaft ConstructionBy Gary A. Almeraris, Thomas F. Peyton
This paper describes the innovative procedures employed during the construction of 3 deep shafts within the confines of New York City. The shafts, which varied in diameter from 1.8m (6ft) to 7.3m (24f
Jan 1, 1989
-
Comparing Investment Options In A Lignite Deposit Exploitation ProjectThe modelling process described in this paper was developed in order to assess the feasibility of various investments options for the exploitation of a lignite deposit located in the Prefecture of Flo
Jan 1, 2005
-
Technology Transfer to the Mining IndustryBy Ramamritham Sridhar, Vaikuntam I. Lakshmanan, Dan A. Macki
Historically, introducing new technology to the mining industry has been problematic. In general, the industry is reluctant to take risks with new technology because it is already heavily tied to risk
Jan 1, 2001
-
Prediction of Diamond Wire Cutting Performance by Computer SimulationBy A. Vargiu, R. Ciccu, G. Massacci
Based on the current results of field practice and on experimental data obtained in the laboratory with a suitable testing apparatus, the industrial operation of diamond wire cutting can be simulated
Jan 1, 1996
-
Technical Note - Dynamic input-output model as applied to the investment planning of a coal power enterpriseBy J. R. Sturgul
A dynamic input-output model for a coal power enterprise that now includes four underground coal mines, three coal washing plants, a power plant and a railway transportation system was developed. The
Jan 1, 1999
-
Man-Made Parameters In Elemental AnalysisBy L. Bloom
"Man-Made Parameters" refers to the importance of selecting appropriate analytical procedures to acquire useful chemical data. The correct procedures are particularly critical at the sample preparatio
Jan 1, 1993
-
Wear of grinding media in the mineral processing industry: An overviewBy M. J. Meulendyke, J. D. Purdue
Within the mineral processing industry, a range of grinding conditions exists which include semiautogenous grinding (SAG),rod milling, and conventional ball milling. Each of these mill environments pr
Jan 1, 1990
-
Role Of Fundamentals In Flotation Plant OperationsBy Brij M. Moudgil
Lack of understanding the major process parameters and inadequate scale-up factors have led to the belief that fundamental knowledge is not important for successful flotation plant operations. Flotati
Jan 1, 1993
-
The Treatment of Steel Plant Wastes by Magnetic CyclonesBy John L. Watson, Suren Mishra
Many of the wastes produced by modern steel plants are pulps or sludges containing significant concentrations of iron and displaying some ferromagnetic characteristics. These waste materials are often
Jan 1, 1992
-
A Model for Floor Stability AnalysisBy P. Tsang, S. S. Peng
Mine floor failures, such as floor heave and floor buckling, occur frequently in underground coal mines where soft mine floor exists. The types of failure can usually be classified into two categories
Jan 1, 1992
-
Monitoring of Environmental Factors at the San Manuel MineBy P. Mousset-Jones, F. Calizaya
Currently, a 4.3 km long drift is being developed on the 3440 level in the Lower Kalamazoo project at the San Manuel Mine, Magma Copper Company, AZ. The drift, located at 1050 m below surface, is bein
Jan 1, 1995
-
Preparation Plant Control Using on-Line Ash AnalyzerBy Mel J. Laurila
The application of on-line ash analyzers in coal processing has become widespread. However, the analyzers are employed largely in monitoring, blending or sorting applications. Just recently has work b
Jan 1, 1995
-
Conditioning of Florida phosphate rock using a gravity-flow mixerBy J. C. Ransdell
A conventional paddle-type mixer and a gravity-flow mixing device were evaluated for conditioning of fine phosphate feed (- 35 + 150 mesh) with fatty acid and fuel oil, and for acid scrubbing prior to
Jan 1, 1987
-
Long-term Subsidence Monitoring Over a Longwall Coal Mine in Southern IllinoisBy Brenda B. Mehnert
Long-term monitoring is necessary to successfully develop predictive subsidence models. Thus, the Illinois Mine Subsidence Research Program (IMSRP) has documented subsidence over a longwall mine in so
Jan 1, 1986
-
Mechanism of Adhesion of Bacillus subtilis onto DolomiteBy Ross W. Smith, Xiapeng Zheng, Peggy J. Arps
The adhesion (and de-adhesion) of Bacillus subtilis to dolomite was determined under a number of conditions of initial concentration of the organism, agitation, mineral particle size and temperature.
Jan 1, 2002
-
Repairing Conveyor Belting Without VulcanisingBy A. J. Friedrich
Conveyor belts are designed to go unnoticed. When they work well, they attract little attention. When they are not doing the job right, it is noticeable, and they need to be fixed immediately. Vulcan
Jan 1, 2000