  • AUSIMM
    Design, Development and Operation of a Hardrock Roadheader

    By Bromley JC

    Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up

    Jan 1, 1987

  • CIM
    Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machine

    By R. Lovat, J. A. Hunter

    "The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica

    Jan 1, 1984

  • SME
    Design, Excavation, Support Of A Large Diameter Coal Mine Access Decline Using A Tunnel Boring Machine

    By Steve Polegato, J. Coady Marsh, Gary Landry

    The Donkin-Morien Mine in Cape Breton, Nova Scotia, has successfully completed the excavation of a 7.6m (25-ft) diameter access decline over a distance of 3.5km out under the Atlantic Ocean. The tunne

    Jan 1, 1985

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • SAIMM
    Design, Installation And Testing Of The No 250 Wemco Smartcell? Flotation Machine At Minera Los Pelambres

    By A Weber, L MacNamara, H Schreiber

    Design and development of the world?s largest flotation cell was completed in 2002. This was the first 257 m3 flotation cell installed in the mineral industry and represents a major development in t

    Jan 1, 2007

  • IMPC
    Design, Simulation and Operation Column Flotation (ABSTRACT PAGE)

    By J. B. Rubinstein

    "The paper gives an overview of the history of flotation machine development. The laws of their evolution are stated and the place and role of column flotation are demonstrated.The major parameters of

    Jan 1, 2003

  • AUSIMM
    Design, Simulation and Operation of a New Generation of Column Flotation Machines

    By Gerasimenko MP

    The authors consider the features and advantages of a new promising trend in mineral processing - column flotation. Design aerohydrodynamic and process characteristics of pilot-scale columns are stu

    Jan 1, 1993

  • CIM
    Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology

    By Lyne Côté, Jose Adante

    "The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n

    Jan 1, 2009

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive

    By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté

    "A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr

    Jan 1, 2004

  • SME
    Design, Testing, and Production of Steel Fiber Reinforced Concrete Segmental Tunnel Lining for the East Side Combined Sewer Overflow Tunnel

    By K. Wongaew, R. F. Cook, J. E. Carlson, T. Cleys, C. R. Smith

    Steel fiber reinforced concrete segmental rings are the final tunnel lining for approximately 85% of the alignment for a 6.706-meter (22-foot) internal diameter tunnel being built as part of the East

    Jan 1, 2007

  • SME
    Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft

    By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker

    The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P

    Jan 1, 2007

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    Design-Build Support Of Excavation For Block 76, Salt Lake City, Utah

    By Rick Deschamps

    The Block 76 project includes the demolition and redevelopment of an entire city block for mixed use retail, office and residential properties directly adjacent to Historic Temple Square in Salt Lake

    Jan 1, 2009

  • SME
    Design/Build Agreement For The Niagara Tunnel Project

    By Russel Delmar, Rick Everdell, Harry Charalambu, John Tait

    Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam

    Jan 1, 2007

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • DFI
    Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - Synopsis

    By Anupam Saxena

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U

    Jan 1, 1996

  • DFI
    Designed, PDA Assisted Load Tested, And Constructed Pile Foundation Provides An Economical Foundation Solution - A Case History

    By Gregory A. Stephan

    A case history of design, prediction, probe pile driving, and construction of a pile foundation for Building 3 of Waterside at Bay Beach Condominiums located in Fort Myers Beach, southwest Florida, is

    Jan 1, 2003

  • AUSIMM
    Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast

    By Kleine T. H

    Blast design involves many engineering constraints and objectives. Some of the more important include the implementation costs, the desired fragmentation and shape of the muckpile. A spreadsheet has b

    Jan 1, 1992