Search Documents

Sort by

  • AUSIMM
    Integral Pressure Stripping

    By Beer G

    The recent re-emergence of an Integral Pressure Stripping system which operates with both cell and column in closed circuit at elevated temperature and pressure, requires no cyanide in the eluate so

    Jan 1, 1991

  • CIM
    Metallurgy of the Mt. Milligan Porphyry Gold/Copper Deposit

    By A. B. Cron, R. MacPhail, L. Melis, K. Armstong

    "Mt. Milligan is a porphyry gold/copper deposit in north-central British Columbia. Diluted and mineable drill-indicated reserves total 449 million tons at an average grade of 0.013 oz gold/ton and 0.1

    Jan 1, 1991

  • SME
    Evaluation of respirable dust control on longwall mining operations

    By R. S. Ondrey, R. A. Haney, T Tomb, R. T. Stoltz, Novakowski D. L. Chiz, E. J. Gerbec, D. J. Atchinson

    Although the number of operating longwalls in the United States (approximately 100) has remained relatively constant over the last five years, longwall production levels have significantly increased a

    Jan 1, 1991

  • SME
    Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, Arizona

    By William D. Leech, Ronald E. Romley, Gary N. Sheppard

    The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The

    Jan 1, 1991

  • DFI
    Bearing Capacity Of Precast Nodular Piles In Tianjin Soft Clayey Soil

    By Xu Youzai

    Static loading teets of five nodular piles and four non-nodular piles were performed in Tianjin soft clayey soil in which measurements of axial force and movements were made. Distribution of shaft res

    Jan 1, 1991

  • DFI
    Experiences Of The Cast-In-Situ Pile Filling In Stone-Line Intercalation

    By Guan Jichang

    An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t

    Jan 1, 1991

  • DFI
    Maritime Structures

    By D. Waite

    The Chairman opened the session by wondering why so few papers on Maritime Structures had been received for this conference. Perhaps because the marine environment is so hostile and the access so diff

    Jan 1, 1991

  • AUSIMM
    Highwall Mining Trials at Callide Mine

    By Boyd G

    This paper describes the planning, analysis, design and operational experience of highwall mining based on auger drilling techniques applied to thick coal seams exposed in an opencut highwall. Bein

    Jan 1, 1991

  • AUSIMM
    Aspects of Mining at Ok Tedi

    By Zwaan J, Kepa J

    Ok Tedi mine has become one of the major copper producers in the world. In the process of becoming of age, it overcame the challenges of operating in a locality which is young in geological terms,

    Jan 1, 1991

  • AUSIMM
    Timing of Epithermal Activity in the Horohoro-Matahana Basin Area, Taupo Volcanic Zone

    By P J. B Fransen

    Several spatially and/or temporally distinct phases of epithermal activity can be recognised in the Horohoro-Matahana Basin area of the Taupo Volcanic Zone. In the northern Matahana Basin a 140 - 350

    Jan 1, 1991

  • SME
    English Sea Drives - A Success Story

    By Joseph L. Margin

    From a stubborn start to record setting performances in little over a year, that is the story of the English Running Tunnel Boring Machines. The program to transfer technical information on these high

    Jan 1, 1991

  • CIM
    The long distance commute in the mining industry: the human dimension

    By M. Phylli Bray

    "Concurrent with the continuing demise of many Canadian mining towns is the rise of a new method of providing remote mine sites with a workforce. This is the Long Distance Commute (LDC) which uses com

    Jan 1, 1991

  • SME
    Study Of High MgO Blast Furnace Pellets

    By J. A. M. Cano

    An extensive research work was developed by Samarco Mineracao S/A to study the quality characteristics of blast furnace pellets produced with high content of MgO. Comparative blast furnace simulatio

    Jan 1, 1991

  • ISEE
    BLASTCAD Three Dimensional Underground Blast Design Software

    By David Sprott, Patrick Andrieux

    In 1990 the Noranda Technology Centre commenced a project to develop an interactive three-dimensional blast design system using a commercial computer-aided drafting and design package (CADD). The obje

    Jan 1, 1991

  • AUSIMM
    Review of Some Recent and Current Open Cut R&D Projects

    By Brett J. R

    Some recent and current research and development projects relating to strip type open cut coal mining are reviewed. The projects include a dragline-hopper-truck mining system, an overburden slusher

    Jan 1, 1991

  • IOM3
    The Neves-Corvo project: the successes and challenges

    By D. C. Bailey, D. I. Hodson

    Paper presented at the annual joint meeting of the IMM and IMinE held in Harrogate, 31 January 1991. The Neves-Corvo copper-tin mine is the highest-grade large-tonnage copper operation in the world an

    Jan 1, 1991

  • DFI
    Experimental Evidences From A Pile Load Test On A Driven Composite Pile

    By A. Garassino

    A pile design was performed for a thermal power station in Egypt and more than 4000 piles were to be driven. Technical economical reasons suggested the choice of driven composite LACOR piles designe

    Jan 1, 1991

  • ISEE
    Critical Blast Design Parameters for Construction Blasting

    By Tom Short

    "Construction blasting covers a very extensive variety of explosive applications. I will discussseveral of these with you and then show slides from my collection, starting in 1956, which will betteril

    Jan 1, 1991

  • AUSIMM
    The Adsorption and Desorption of Aurocyanide from Activated Carbon

    This monograph presents a unified theory of adsorption and desorption of aurocyanide on activated carbon. This theory has proved useful for CIP/CIL carbon adsorption and Zadra and AARL elution proc

    Jan 1, 1991

  • NIOSH
    RI 9333 - Evaluation of the Safety of the CSE SR-100 Self-Contained Self-Rescuer

    By R. W. Watson

    A belt-wearable self-contained self-rescuer (SCSR) manufactured by the CSE Corp. and designated the "SR-1OO" was evaluated for safety in the underground mine environment by the U.S. Bureau of Mines. T

    Jan 1, 1991