Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Exploration and Resource Modelling of the Goondicum Industrial Minerals Project, Central Queensland, AustraliaBy H Hoogvliet
The Goondicum Crater industrial minerals deposit is located about 30 km east of Monto, Central Queensland, Australia. Early exploration programs in the 1990s found alluvial ilmenite along the banks of
Oct 5, 2011
-
Good Data-A Requirement For A Good ReserveQuite often the reserve assessor becomes enamored with the numbers gen- erated and forgets the basis for his assessment. The quality of the assess- ment can only be as good as the quality of the in
Jan 1, 1979
-
A Review of BHP - Utah Coal Limited's Dragline Stripping OperationsBHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut
Jan 1, 1989
-
Unmanned Aerial Vehicles for Mine Environment MonitoringBy P J. Cullen, B P. Banerjee, S Raval
Continuous monitoring of mining impacts on the surrounding environment is a necessary sustainability criterion. Traditional monitoring approaches such as in situ sampling and airborne and satellite-ba
Nov 4, 2015
-
Shifting the comminution workload from the primary ball mill to TowerMill circuitBy H Ishikawa, R Halomoan, S Palaniandy
The Karara iron ore project is a magnetite operation consist of open pit mining and concentrator to produce high-grade magnetite concentrate. The concentrator has adopted three stages of comminution,
Aug 29, 2018
-
Design and Construction Contract C916 Beauty World Station and Tunnels, SingaporeBy R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Increasing production systems availability through remote support disciplineBy A Innis, A Bye, B McCarthy, S Glover
Technology adoption in the mining industry has been steadily increasing over the past decade, driven by the need to improve operational efficiency, safety, sustainability, and profitability. As mining
Sep 1, 2024
-
Ventilation Surveys and Model Building - A ConsultantÆs OpinionBy J Rowland
"This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough
Jun 1, 2012
-
Maximise Orebody Value through the Automation of Resource Model Development Using Machine LearningBy S Oliver, D Willingham
"Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation
Jun 15, 2016
-
Paste Backfill for Enterprise MineBy D Morrison, P Goodman
The cycle time between adjacent stopes is critical to achieving the required production rate from 3500 Orebody; one of the Enterprise Mine orebodies. Current Mt Isa cemented fills require a 90-day cur
Jan 1, 1998
-
Challenges in designing a magnetic resonance logging-while-drilling tool for iron ore explorationBy T A. J Hopper, S Mukkisa, M L. Johns, K T. O’Neill
Technological advances the sensor design and performance for logging while drilling (LWD) instrumentation offer considerable opportunities in iron ore exploration. Here we focus on the development of
Nov 8, 2021
-
Application of RISKGATE to Coal Mine Tailings DamsBy M Gasparon, J Harris, T Baumgartl, D J. Williams, M Edraki, P A. Kirsch, D Rowe
RISKGATE, an Australian Coal Association Research Program-funded (ACARP) initiative, has been designed to assist the Australian coal mining industry in improving minimum standards for safety performan
Jul 16, 2014
-
A Study into Bonding within Reduced Titanomagnetite-Coal CompactsBy R J. Longbottom
In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this
Jul 11, 2011
-
A machine learning model to predict non-metallic inclusion dissolution in the metallurgical slagBy C Xuan, J H. Park, Q Wang, C Shen, D Kumar, W Mu
Dissolution of non-metallic inclusions in the metallurgical slag is of vital importance for cleanliness control of the steel manufacturing. With the development of high temperature confocal laser scan
Jun 19, 2024
-
New tools for ground control in freeze shaft sinkingBy J Franz, S Bock, N Hentrich
Artificial ground freezing is the unrivalled method for groundwater control during mine shaft sinking. Moreover, ground freezing may also provide temporary ground support. The fast development of fibr
Nov 30, 2018
-
Challenges and limitations in development of large thermodynamic databases for multiple molten phases using the Modified Quasichemical FormalismBy E Jak, M Shevchenko, E Nekhoroshev, D Shishin
In the field of pyrometallurgy, the presence of multiple molten phases with distinct chemical compositions, such as slags, mattes, speiss liquids, metals and molten salts, is a well-known phenomenon.
Aug 21, 2024
-
The Future of Mining on Pitjantjatjara LandsIn 1976 the Pitjantjatjara Council was established under the Associations Incorporation Act 1985 (SA), for the initial purpose of organising and bringing together three similar Indigenous groups. Thes
Jan 1, 2002
-
The Iron Bridge magnetite depositsBy C Simpson
The Pilbara region of Western Australia is well known for its abundant exports of hematite-goethite deposits, which have been mined and exported since the 1960s. Magnetite has also been mined in Austr
Jul 24, 2017
-
Report on the Tin Field of the Blue Tier District, TasmaniaTHE area dealt with in this paper is included within a radius of about 3 miles of the Poimena township. Several thousand tons of tin have been won from this field, and probably £200,000 spent in
Jan 1, 1912
-
Verified Stability Modelling of HighwallsBy D Fergusson, J D. St George
Highwall stability is a major consideration in optimising opencast mine geometry. It involves assessing the risk of those slope failures that are large enough to have significant cost, safety and/or o
Jan 1, 2006