Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Palabora Underground Mine ProjectBy P Townsend, F Russell
Palabora Mining Company operates an integrated open pit mine, concentrator, smelter and refinery complex located in the Northern Province of South Africa. The Palabora open pit went into production in
Jan 1, 2000
-
The Dewatering of Alumina Trihydrate in the Bayer ProcessBy Waqinwright M. S
The underlying principles of dewatering theory have recently achieved considerable practical application in the washing and dewatering of alumina trihydrate in Bayer plants. In particular, the infl
Jan 1, 1989
-
CAES System at KCGM ù Four Years OnBy L O. ÆNeill, J Bebek
When Kalgoorlie Consolidated Gold Mines (KCGM) purchased its fleet of 18 CaterpillarÆs dump trucks in 1999, as part of its change to owner operated mining, five CaterpillarÆs Computer Aided Earthmovin
Jan 1, 2003
-
Operational Geotechnical Engineering at the Ok Tedi Mine, Papua New GuineaBy Cortes JP
In a dynamic environment such as the Star Mountains of Papua New Guinea Geotechnical Engineering for the Ok Tedi Project must be described as both interesting and challenging. To be effective a rea
Jan 1, 1997
-
Finding a Mine Within a Mine - The Mount Isa Lead/Zinc Case StudyBy M D. Rosengren, G Gregor, M F. Young
Over the last 15 years the silver/lead/zinc ore treated at Mount Isa became increasingly complex and lower grade. Metal recoveries dropped dramatically, causing a serious decline in profitability. The
Jan 1, 1998
-
Seismic Extension of Volcanic ArcsWhile convergence of plates at a subduction zone produces shortening at the toe of the overriding plate, this deformation is localized to the frontal 100 km or so of the plate. There is increasing evi
Jan 1, 1990
-
Revision of the Markham 1:250,000 Sheet, Papua New Guinea: What is the Finsterre Terrane?By Kagl J, Publlier M, Nekitel S, Arumba J, Rangin C, Mosusu N
Since the advent of plate tectonic modelling, the Ramu-Markham valley has been thought the site of a classical island-arc/conti- nent collision zone. In this interpretation the units south of the Ma
Jan 1, 1997
-
Ore Block Optimisation for Open Pit Grade ControlBy M B. McKevitt, W J. Shaw
The main task of grade control on a daily basis is to define the material that should be mined to a destination under various categories. This can be determined by grade, lithology, quality and blendi
Jan 1, 2009
-
Case Examples of Stability on Surface Mining ProjectsStability on surface mining projects is primarily controlled by five factors. These include structural geology, the most important of the factors, the existence of weak layers, primarily clayey go
Jan 1, 1986
-
Modelling the Basic Separation Phenomena in Flowing Film Concentration ProcessesBy Bevilacqua P, Preti U
The basic separation phenomena taking place in film concentration processes are studied through a kinetic-probabilistic approach. This approach is based on the fact that the particle velocity in the
Jan 1, 1993
-
Design Risk Management at Mt Leyshon Gold MineThe Mt Leyshon Gold Mine is located 30 kilometres south of Charters Towers in Northern Queensland. The current open cut mine has been in operation since 1986. In 1992 a feasibility study was complet
Jan 1, 1994
-
Mechanised Shields for Trenchless Sewer Construction in SingaporeBy Musa MA
Tunnel excavation for sewer construction long remained a labour intensive, hazardous and costly operation. Even with the of mechanical and semi-mechanical shields for tunnel excavation, many problems
Jan 1, 1993
-
Maximising the Capacity of the Ore Handling Systems at Xstrata CopperÆs Mount Isa Copper OperationsBy G W. Croft, L E. Krause
The current copper ore handling systems in use at Xstrata CopperÆs Mount Isa Copper Operations are up to 33 years old and have hoisted over 160 Mt at a rate of around 6 Mtpa. The mineÆs production pro
Jan 1, 2005
-
The Use of Evaluation Surfaces to Assist in the Determination of Mine Design CriteriaOne of the problems with mining projects is the setting of the design criteria that will best match the requirements. Normally this is expressed in economic terms but can be other factors. With massiv
Jan 1, 2000
-
Towards Larger Flotation MachinesEconomic and technical reasons forced the mining industry all over the world to increase the unit size of mineral processing equipment. in large flotation cells, this development leads to problems
Jan 1, 1978
-
The Eight Millisecond Time Window MythBy A B. Richards
Time window analysis that limits the explosive mass fired within a specified time window (commonly eight milliseconds) has been used for many years in blast design by explosives engineers. Despite sev
Jan 1, 2003
-
Beyond The Scheduling Horizon û Improving The Next Decade ÆsIt is usually the case that the short-term plannerÆs role is occupied by the younger site mining engineer. ThatÆs because mine scheduling is generally seen as a mundane and thankless task. But, short-
Jan 1, 2003
-
Micro-X-Ray Diffraction Analysis of Pigments - Determination of Detection Limits of 14 Coloured Pigments in Three White Pigment MatricesBy D Lau
Traditionally X-ray diffraction (XRD) has not been significantly used by the cultural heritage sector, as the most commonly used technique, X-ray powder diffraction (XRPD), requires sample removal fro
Jan 1, 2008
-
Desulphurizing ISF feed by roastingBy Wright S
The feed to the Cockle Creek Imperial Smelting Furnace consists of mixed Pb/Zn con- centrates and lead sulphate-containing elec- trolytic zinc plant residues. Roasting was investigated as a means of
Jan 1, 1986
-
Subsidence for Deep Longwall Mining of Coal Overlain by Massive Sandstone StrataMining is taking place at increasing depths of cover on the Southern Coalfield beneath pre- dominantly massive sandstone strata. Within the next twenty years, there will be longwall mining at depths
Jan 1, 1981