Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Similkameen ProjectBy J. H. Parliament
"The 15,000-tpd Similkameen open-pit copper mine, 10 miles south of Princeton, B.C., started production during 1972. The two main ore zones are separated by the deep canyon of the Similkameen River, w
Jan 1, 1973
-
Changes in the Converter Slag Chemistry Due to the Southern Peru Ilo Smelter ModernizationBy J. Suarez Condezo, E. Herrera Alarcon
The Ilo Smelter Modernization Project will require treating the slag from the Peirce Smith converters in Slag Cleaning Furnaces using pig iron technology. Currently the slags from the converters show
Jan 1, 2007
-
The Hauy Formation - Subaerial Volcanism in a Braided Stream EnvironmentBy M. Piche
The western part of the Hauy Formation of the Opemisca Group, occurring near the town of Chapais, is described in this paper. As it has been defined previously, the Formation is composed of a successi
Jan 1, 1984
-
Case History of Lost Circulation Jobs Leduc-Woodbend Field, AlbertaBy H. F. Naldrett
"AbstractAt the end of May, 1950, Imperial Oil, Limited, had completed a total of 192 D-3 wells in the Leduc-Woodbend field, 62 of which lost circulation in the D-3 zone for periods ranging from two h
Jan 1, 1950
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Mine Conveyance Safety DogsBy A. B. C. Stothart
"IntroductionIn the past four years Ontario Mines have made great progress in the development of reliable mine conveyance safety dogs. History shows that, prior to 1945, a rope failure on a descending
Jan 1, 1950
-
Greater Use of Geoscan On-Belt Analysis for Process Control at Sepon Copper Operation (25db9add-1585-4f00-b983-5ae3829699db)Access to accurate real-time information is critical to maintaining efficiency and competitiveness in any modern minerals processing facility. At MMG LXML Sepon Copper Operation in Lao P.D.R., control
Jan 1, 2016
-
Expansion of the Quebec Metal Mining IndustryBy J. E. Gill
THE 1938 season was marked by a distinct lull in exploratory activity in the Province of Quebec. Quebec was not unique in this respect, but the condition appears to have been more acute here than in m
Jan 1, 1939
-
Design of the New Lihir Gold Pressure Oxidation AutoclaveBy M. J. Collins, B. Parekh, A. Hasenbank, B. Hewitt
Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island
Jan 1, 2011
-
How to Achieve Operational Reliability in the Natural Resources and Petroleum IndustriesBy Emilio Giuseppe Sarno Severi
Mining and Petroleum Similar Industries ?Asset Intensive ?Exposed to market volatility ?Highly Risky Operations ?Scarcity of Experienced and Trained resources ?Operating in diverse countries wi
Nov 1, 2011
-
Petrology and alteration of the Siscoe Stock at the Siscoe Gold Mine, Val D'or, QuebecBy Laszlo Imreh, Pierre Trudel, André C. Tessier
"The Siscoe gold mine is ranked as the fourth largest mine in the history of the Val d' Or mining district with a total production of 27.4 tAufrom1929 to 1949. Most of the gold mineralization occurred
Jan 1, 1990
-
Closing the loop—Using actual concentrator performance to determine the true value of ore sources"The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copperzinc ores are campaigned separately through the concentrator producing co
Jan 1, 2005
-
Application and Maintenance of Hydraulic Drive Systems in Sherritt’s ConcentratorsBy L. H. Smith, D. S. Taylor
"AbstractSherritt has been applying hydraulic drives to concentrator equipment since 1967. The initial application was made on a bank of 5- by 5-in. slurry pumps. This has now been extended to all slu
Jan 1, 1977
-
Grinding Circuit Design for Similco MinesBy Anita Marks
In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197
Jan 1, 2012
-
Extractive Industry in Africa and Sustainable DevelopmentBy Theophile S. Yameogo
Les ressources naturelles ont en général été le moteur du développement économique et social des nations. Les pays aujourd?hui développés sont pour la plupart d?anciens eldorado, charbonniers ou pétro
Apr 1, 2005
-
Kinross Mine Planning Best PracticeBy C. Turek, R. Henderson
Mine planning is the foundation of value for a mining company. Good mine planning requires solid understanding of the ore body, rigorous standards and processes, robust and useful information technolo
Jan 1, 2011
-
Notes on Block Caving at the King Mine of the Asbestos Corporation, Limited, Thetford Mines, QuebecBy J. G. Ross
A DESCRIPTION of the block-caving system of mining as practised at the King mine of Asbestos Corporation, Limited, Thetford Mines, Que., was presented. at the Annual Meeting of the Institute held in Q
Jan 1, 1936
-
Ultragold: Real-Time Gold-in-Slurry Analysis with 100 Ppb Accuracy"Real-time, on-stream analysis of the metal content of process slurries is an essential prerequisite for process monitoring and advanced control of mineral processing circuits. On-stream X-Ray Fluores
Jan 1, 2017
-
Comparative Study on Flotation Performance of Stockpiled and Fresh Ore SamplesBy C. Pelley, S. Kelebek, T. Katsabanis, B. Nanthakumar
"As part of a larger investigation on generation of fines from mining activities and their effect on downstream operations, ore samples from Onaping area stockpiles of Falconbridge Ltd were studied. B
Jan 1, 2006
-
Geology of the Hat Creek Coal DepositsBy D. D. Campbell
The Hat Creek coal deposit s occur within folded and faulted Tertiary (Eocene) strata of the Coldwater Group, which comprises weakly lithified shales, siltstones and conglomerates underlying the floor
Jan 1, 1977