Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Settlement of Tailings Slurries by Creep Compression

    By J. Don Scott

    Analytical predictions of the rate and magnitude of settlement of deposited oil sands tailings slurries generally overestimate how fast pore pressures will dissipate. Field deposits of nonsegregating

    May 1, 2004

  • CIM
    Regulatory Tendencies And Abatement Technologies Used In The Chilean Copper Industry

    By M. Sanchez

    In the last decades, the Chilean copper mining and metallurgical industry have had to modify their technological processes to meet the environmental regulations implemented by the Chilean government,

    Jan 1, 2007

  • CIM
    Small-scale mining using the modular gold processing unit at the Granada mine, Rouyn-Noranda, Quebec (d2911615-1db3-4ddc-ae0e-f3be18f048cf)

    By P. Trudel, É. Cabot, L. Cabot

    "A modular gold processing unit (MGPU) was designed, installed and operated over an eight-month period by RSW-Béroma at the Granada mine located near Rouyn-Noranda, Quebec. A description of the projec

    Jan 1, 2003

  • CIM
    Inorganic Chemistry of the Platinum-Group Elements

    "2.1. General Considerations and Properties2.1.1. IntroductionOur present knowledge of the platinum-group elements (POE) is extensive, the reason being two-fold. The elements have many uses and, moreo

    Jan 1, 1979

  • CIM
    Observed Detonation Pressures of Blasting Agents

    By Alan Bauer, Melvin A. Cook

    Measured detonation pressures of "prills and oil" (94/6 ammonium nitrate/fuel oil) and three of the new "slurry" blasting agents are presented and compared with computed, ideal detonation pressures an

    Jan 1, 1961

  • CIM
    A Laboratory Protocol to Evaluate Potential Chemical Interferences in Flotation Circuit Applications

    By B. G. Cousins, B. O’Rourke, C. Spence

    "Some non-flotation chemicals are added to flotation circuits directly and indirectly to control issues such as scaling and dust in other areas of the operations. Since dosage levels are generally not

    Jan 1, 2016

  • CIM
    Stochastic Simulation of Open Pit Pushbacks with a Production Simulator

    Material scheduling, sequencing planning and execution are the core tactical mine plan for achieving production targets that maximize the objective function of any mine production entity. This objecti

    May 1, 2004

  • CIM
    Sixth Commonwealth Mining and Metallurgical Congress

    By J. C. Mitcheson

    Mr. President, Mr. Mayor, Ladies & Gentlemen: IT GIVES ME great pleasure to have the opportunity, today, to speak on behalf of all the constituent. bodies of the Common-wealth Council of Mining and

    Jan 1, 1957

  • CIM
    Corrosion properties of skin and bulk of semi-solid processed and high pressure die cast AZ91 alloy

    By C. Blawert

    The corrosion properties of the skin and the bulk of semi-solid processed and high pressure die cast AZ91 alloy were studied in 5% NaCI solution by (a) analysing the corrosion morphology, (b) measurin

    Jan 1, 2004

  • CIM
    Verification of a CFD Code use for Air Flow Simulations of Fractured and Broken Rock

    A direct comparison has been undertaken between laboratory wind tunnel experimentation and computational fluid dynamics simulation of a 3D manufactured analogue for a body of fractured broken rock, cr

    Aug 1, 2013

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • CIM
    Yamana Chapada’s Optimisation of a Copper/Gold Plant

    By T. Banerjee, R. deS. Almeida, D. Gudgeon, F. C. F. Batista, L. deÁ. Silva

    "Yamana Chapada’s mine is one of the larger copper-gold mines in Brazil. The mine is located in Goiás state, in the central part of Brazil. The mine has estimated Mineral Reserves of 4.1 million ounce

    Jan 1, 2018

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    High precision shovel GPS (4f4c9d38-4aa1-4e72-ad20-70b16ea72848)

    By L. M. Gould

    "Syncrude Canada operates the largest oil sands crude oil production facility in the world and produces over 13% of Canada’s total oil requirements. To achieve this, Syncrude mines the oil sands in op

    Jan 1, 2002

  • CIM
    An Electrolytic Etch Technique for Aluminum

    By G. Marchand, R. H. Hay, E. C. Pearson

    "AbstractA polishing .technique is described together with two anodic etching methods for aluminum and its alloys. Some of the optical and structural characteristics of the film formed by •these etchi

    Jan 1, 1952

  • CIM
    Hydrodynamics Analysis of a 680 M3 Mechanical Agitated Flotation Cell Based on Numerical Simulation

    By Shen Zhengchang, Dong Ganguo, Chen Dong, Zhang Ming

    "It is advantageous to process low grade ores with large scale flotation cells. Large-scale flotation cells have been enhanced with effective volume scale-up. In this paper, the latest and largest flo

    Jan 1, 2016

  • CIM
    Simulation Numérique Du Dma Dans La Halde Sugar Shack South De La Mine Questa, Nouveau-Mexique

    By René Lefebvre

    Numerical simulations of the physicochemical processes related to acid rock drainage (ARD) in the Sugar Shack South rock pile of the Questa Mine were performed with the TOUGH AMD simulator. The object

    Nov 1, 2002

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Characterization of Fine and Ultrafine Particles Produced During Dry Machining Of Aluminum Alloys

    By A. Djebara

    Today, indoor air quality, especially in manufacturing industries, is of great interest due to the use of new processes and advanced materials such as those containing nanoparticles. Manufacturing pro

    Jan 1, 2011

  • CIM
    Speciation for aqueous systems - An equilibrium calculation approach

    By C. A. Young, H-H. Huang, L. G. Twidwell

    Equilibrium calculational software programs can be effectively utilized to model important parameters in aqueous and aqueous/solid systems, e.g., activity or concentration, solubility, temperature, so

    Jan 1, 2005