Search Documents

Search Again

Search Again

Sort by

  • SAIMM
    Descaling Behaviour Of Stainless Steel Following Simulated Reheating

    Experimental results are presented that test the hypothesis that the descaling behaviour of stainless steel slabs following reheating is controlled by interfacial roughening at the scale-steel interfa

    Jan 1, 2003

  • ISEE
    Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators

    By Michael S. Wieland

    Charge malfunction problems result from rather universal damage mechanisms and are widespread throughout surface and underground delay blasting. Recent refinements in instrumentation technology reveal

    Jan 1, 1994

  • DFI
    Design & Construction Of Pile Foundations For A Building Complex - A Case History

    By S. K. V. Avasarala

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c

    Jan 1, 1995

  • SME
    Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking

    By Bhaskar B. Thapa

    The proposed Caldecott fourth bore will consist of a two lane highway tunnel along California State Route 24 near the City of Oakland. The proposed design and construction sequence for the 15-m-diamet

    Jan 1, 2008

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • DFI
    Design And Construction Aspects Of A Deep Basement In Dublin - Synopsis

    By Philip J. Daynes

    As part of the regeneration of the centre of Dublin, a multi-functional development is being constructed on the site of the historic Smithfield Fruit Market. The site is being developed in three phase

    Jan 1, 2003

  • SME
    Design And Construction Challenges At The Gualcamayo Mine ? Introduction

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re

    Jan 1, 2011

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • DFI
    Design And Construction Considerations For The Use Of Slurry Walls To Construct Water Reservoirs In The Denver Formation

    By Ken Andromalos

    Continued population growth combined with limited water resources in the Denver area has resulted in the conversion of a number of mined out gravel pits in the area into municipal water storage facili

    Jan 1, 2007

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • DFI
    Design And Construction Imposed By Unique Geological Conditions In Paris, Milan And London ? Summary

    By Chris Harnan

    This paper describes the geology of three European cities and outlines how the geology has lead to the development of specific foundation construction techniques. Comparative tables of techniques

    Jan 1, 2000

  • DFI
    Design And Construction Of A Cut-Off Wall In Warm Permafrost

    By Steven L. Anderson

    A cut-off wall has been designed and is currently under construction along the Back Dam of the existing tailings impoundment at Red Dog Mine, Alaska. The cut-off wall, which will be in the order of 5

    Jan 1, 2010

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • SME
    Design and construction of a surface air cooling and refrigeration installation at a South African mine

    Impala Platinum?s No.16 Shaft mine is currently under construction and is expected to reach full production of 256 500 tons per month by 2014. Mining will start at 1 260 m below surface with a maximum

    Jan 1, 2009

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • SME
    Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental Issues

    By Adrian Coombs

    The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion

    Jan 1, 2008

  • DFI
    Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge

    By Frederick C. Rhyner

    Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw

    Jan 1, 2004

  • DFI
    Design And Construction Of Large Diameter Drilled Shafts For The Bath - Woolwich Bridge

    By Andrew Peterson

    The Maine Department of Transportation offered this challenging design-build project for a new, 12-span, bridge over the Kennebec River in Bath, Maine. This structure would be built to replace the exi

    Jan 1, 1999