Brightwater East?A Case HistoryBy Luminita Calin
King County (Seattle, WA) is on a monumental task of building the new Brightwater System complete with a new treatment plant, three main conveyance tunnels, a new outfall into Puget Sound and other an
-
Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing ChallengesBy James D. Nickerson
Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea
Jan 1, 2009
-
Briquetted Chrome Ore Fines Utilisation In Ferrochrome Production At Zimbabwe AlloysBy N. N. Malila, N. R. Shoko
The ever-increasing pressure on the profit margins of ferro-chrome producers and the gradual depletion of deposits of rich hard lumpy chrome ores calls for the ferrochrome industry to maximise the use
Jan 1, 2004
-
British Columbia Paper - Lead- and Zinc-Deposits of the Virginia-Tennessee RegionBy Thomas Leonard Watson
Jan 1, 1906
-
Brittleness And DrillabilityBy H. G. Denkhaus
Comment on ?The evaluation of rock brittleness concept on rotary blast hole drills? in the Journal of SAIMM, vol 102. no. 1. pp. 61?66 Comment on ?Correlation of specific energy with rock brittlene
Jan 1, 2003
-
Broken Hill Ore Chute DesignTHE Broken Hill mining field, approximately 31 miles in length, is at present being exploited by seven companies, viz. : North Broken Hill Limited, Junction North Broken Hill No Liability, Broken Hill
Jan 1, 1925
-
Broker's Rules of Thumb for Mineral Valuation: A Focus on Gold EquitiesBy Dodd SF
Valuation of mining companies and their underlying assets prepared by brokers' analysts are, by necessity, approximations. The reliability of the valuations is entirely proportional to the qua
Jan 1, 1994
-
Bross process: bio-treatment of alkaline slags produced during lead recyclingBy L. J. Barnes
The process for bio-remediation of sulphidic slag (BROSS) operates at 45 degrees C in a neutral (pH 7), aerobic aqueous environment in which sulphide in the slag is converted to sulphate. A two-stage
Jun 18, 1905
-
Brown Coal Resource Evaluation - A Case Study of the Loy Yang DepositBy Hibbert W. D, Lottrey A
The behaviour of coal in a process is a function of both the coal properties and the processing conditions. In the case of the Loy Yang coal deposit, extensive testing has been undertaken to determi
Jan 1, 1992
-
Brunswick Mine SAG Mill Liner Design and WearBy Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah
"An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent
Jan 1, 2003
-
Bubble Attachment Time Measurements For Select Rare-Earth Phosphate Minerals In Oleate SolutionsBy W. M. Cross
Bubble attachment time measurements for the rare-earth phosphate minerals monazite and xenotime were made as a function of oleate concentration, sodium fluoride addition, and temperature. Results indi
Jan 1, 1989
-
Bubble Load Measurement in the Pulp Zone of Industrial Flotation Machines - A New Device for Determining the Froth Recovery of Attached ParticlesBy David Seaman, J-P Franzidis, Emmy Manlapig
"A new device has been developed to directly measure the bubble loading of particle-bubble aggregates in industrial flotation machines, both mechanical flotation cells as well as flotation column cell
Jan 1, 2004
-
Bucket Wheel Stacker-Reclaimers, A Survey Of Progress In The U.S.A.By W. L. Price
Since first introduced in the United States in 1964, rail mounted bucket wheel stacker-reclaimers have gained wide acceptance by users. The coal burning power plant group has adopted this new storage
Jan 1, 1969
-
Budget Control At the Hollinger MineBy J. W. Thomson, H. J. Lloyd, R. J. Taylor
"THE HOLLINGER MINE has been producing gold and by-product silver almost continuously for forty-eight years. The value of current production is $10,000,000 annually from one million tons of ore. Its m
Jan 1, 1960
-
Budget Estimation and Contingency Allocation of Block Cave Construction Using Least-squares Monte Carlo Real OptionsBy H M. Ahmed, W S. Dunbar
Construction of cave mining systems requires significant capital expenditure and long-term commitment of human, equipment and material resources before production commences. Risks and uncertainties of
May 9, 2016
-
Buffalo Paper - A Description of the Semet-Solvay By-Product Coke-Oven Plant at Ensley, Ala. (Discussion, 873)By William Hutton Blauvelt
An official of one of the prominent iron companies of the South recently made the following statement during a discussion of the present conditions of the Southern iron business: " The trouble with us
Jan 1, 1899
-
Building A Database For The Prediction Of Phases In Pt-Based SuperalloysBy L. A. Cornish, S. N. Prins, R. Süss
The work is being done using the Thermo-CalcTM software, and the database is being built up by obtaining good thermodynamic descriptions of all of the possible phases in the system. The database suppl
Jan 1, 2006
-
Building An Industrial Mineral Plant Outside The United States Or Canada - A Case Study In MexicoBy Joseph P. Nugent
The new combination gypsum plaster and gypsum wallboard plant of Compania Industrial Kaiser S.A., the first of its kind in Mexico went into production in April of 1969. This was approximately fourteen
Jan 1, 1969
-
Building An Intelligent Mining System – Morenci’s ApproachBy J. A. Flinn
Phelps Dodge’s Morenci copper mine has had six drills, six track-dozers, 16 shovels, two loaders, and 90 haul trucks equipped with either Caterpillar, Aquila, or Modular GPS systems for nearly three y
Jan 1, 2000
-
Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic DamBy I Thin, L Morizzi, C Seymour, G Mungur
Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,
May 9, 2016