Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Effect of Grinding Media on the Flotation of Sulfide Minerals

    Effect of Grinding Media on the Flotation of Sulfide Minerals

    Sep 13, 2010

  • AUSIMM
    Ventilation rules of thumb – friend or foe? Focusing on design upcast air velocities for shafts and raise bores

    By A S. Derrington

    There are several long-standing rules of thumb that are often quoted in mine ventilation studies. They include airway ‘carrying velocities’ and the critical upcast air velocity range that must be avoi

    Aug 28, 2017

  • AUSIMM
    Case History of the Discovery of the Hishikari Gold Deposit, Japan

    The Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed e

    Jan 1, 1995

  • AUSIMM
    PACMANUS: An Active Seafloor Hydrothermal Field on Siliceous Volcanic Rocks in the Eastern Manus Basin, Papua New Guinea

    By J M. Parr, P M. Herzig, J B. Gemmell, S D. Scott

    PACMANUS is an actively-forming seafloor analogue of volcanic-hosted massive sulfide orebodies, situated on the crest of an andesite-dacite-rhyodacite ridge overlying rifted older arc crust in a back-

    Jan 1, 1995

  • AUSIMM
    Pyrrhotite ù An Important Gangue and a Source for Environmental Pollution

    By W T. Yen

    Pyrrhotite crystallises as either a hexagonal or monoclinic structure, both of which can occur in ore deposits. In general, pyrrhotite is not considered as a valuable mineral unless it contains consid

    Jan 1, 2002

  • AUSIMM
    Gold Production Costs

    The final criterion of the payability of gold production must necessarily be the cost per ounce. While the cost per ton or per cubic yard is a convenient comparative measure, and a necessary one for o

    Jan 1, 1940

  • AUSIMM
    Kinetic Dependence of Refractory Gold Sulfide Biooxidation Using Different Microorganism Association

    Kinetic Dependence of Refractory Gold Sulfide Biooxidation Using Different Microorganism Association In this investigation, refractory sulfide concentrate from a deposit located in northern Russia wa

    Sep 13, 2010

  • AUSIMM
    The Coromandel Epithermal Gold-Silver Province: A Result of Collision of the Northland and Colville Volcanic Arcs in Northern New Zealand

    By D N. B Skinner

    Changes in the configuration of late Cenozoic volcanic arcs related to Pacific-Australian plate convergence in northern New Zealand may have localised large-scale epithermal gold-silver mineralisation

    Jan 1, 1997

  • AUSIMM
    Reducing total project cost in the study phase using zero base design

    By J Merrells

    Fluor, together with our clients, has yielded significant reductions in the total cost of mining projects by employing a systematic and methodical process of cost reduction. This paper outlines this s

    Jul 24, 2017

  • AUSIMM
    Geological Mapping, GIS, and Mineral Exploration into the 21st Century û The QMAP Programme and Allied Databases

    Geological information is essential for a diversity of public and other purposes, including land use planning, hazard mitigation, and the exploration and sustainable use of natural resources. This is

    Jan 1, 1994

  • AUSIMM
    Rehabilitation and Water Quality Control at Ohai Coalfields

    By K J. Thompson

    This paper describes the work which has been undertaken at the Ohai coalfields in Southland to restore overburden heaps during past opencast mining operations, and procedures which have been adopted t

    Jan 1, 1981

  • AUSIMM
    A Geological Structural Assessment at Appin Colliery with Reference to Roof Failure and Directional Mining

    At Appin colliery, geological structural analyses and investigations of roof conditions suggest roof failure may be attributed to vectorial stresses acting on underground openings, and inducing moveme

    Jan 1, 1970

  • AUSIMM
    Management of Technical Risk for the Ravensthorpe Nickel Project

    By R Fury, I Skepper, D White, G Miller

    Although the Pressure Acid Leaching (PAL) of nickel laterites has been conducted at Moa Bay, Cuba, since the early 1960s, the commissioning delays generally encountered by the æsecond generationÆ of P

    Jan 1, 2004

  • AUSIMM
    Tectonic Severance of Links between Placer Gold and its Sources, Southern New Zealand

    By D Craw, P Upton

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Otago Schist belt of southern New Zealand hosts widespread orogenic gold deposits. Eros

    Mar 18, 2015

  • AUSIMM
    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Flow Sheet Development of Three Geographically Distinct Chromium-Bearing Ores

    Sep 13, 2010

  • AUSIMM
    Gold Mineralisation at the Porgera Gold Mine, Papua New Guinea, in Response to Fluid Mixing

    By C A. Heinrich, J L. Walshe, V J. Wall

    The Porgera Gold Mine, located in the highlands of Papua New Guinea, has produced over 5 million ounces of Au, since its opening in late 1990. The deposit is located within Upper Cretaceous Papuan Pla

    Jan 1, 1995

  • AUSIMM
    Benchmarking Comminution Energy Consumption for Improved Efficiency

    By G R. Ballantyne, M S. Powell

    A comprehensive Australia-wide survey of comminution energy consumption at copper and gold mines was presented by the authors at the 11th AusIMM Mill Operators’ Conference 2012. The database has been

    Sep 1, 2014

  • AUSIMM
    Plant Improvement and Cost Reduction at the Great Boulder Proprietary Gold Mines Limited

    By Harris J. W

    The treatment plant at The Great Boulder Proprietary Gold Mines Limited was designed and erected by Chas. Ruwolt Proprietary Limited in 1934 to mill 12,000 short tons per month. The flow sheet called

    Jan 1, 1955

  • AUSIMM
    Stacking and Reclaiming Facilities at the Thiess Bros Pty Ltd, South Blackwater Coal Mine from Conception to Operation

    By R Hoskings

    Conceptual studies of the run of mine stockpiling and reclaiming requirements commenced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equipm

    Jan 1, 1980

  • AUSIMM
    Ensuring Professional Engineering Capability - Queensland Professional Engineers Act 2002

    The provision of professional engineering services in Queensland is regulated through the Professional Engineers Act 2002. The Act requires that anyone providing professional engineering services must

    May 1, 2010