Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Dealing with Social and Biological Environmental Impact AssessmentBy Morrison K
This paper describes an approach developed by the authors for integrating social and environmental impact assessment (SIA and EIA) for mining projects. The approach is an evolving one and is based
Jan 1, 1987
-
Tungsten Recovery in the King Island Scheelite MillCircuit alterations and adoption of more compact items of equipment have made it possible to increase the capacity of the King Island Scheelite concentrator, both with regard to head grade and fee
Jan 1, 1977
-
Preparing for Automated Sample PreparationPreparing for automated sample preparation has two facets; the need for better procedures as seen by the laboratory Manager and the approach to be adopted as envisaged by the equipment manufacturer. B
Jan 1, 1976
-
Assessment of Technical and Financial Risk Through Feasibility StudiesBy Aspinall T. O
This paper discusses the identification and assessment of risk for mining developments particularly for open pit mining. A distinction between sensitivity studies and risk analysis is developed, dem
Jan 1, 1994
-
Process Control and Performance Monitoring of Argyle Diamond Mines Heavy Medium Cyclone Separation PlantBy Hutton W, Jack G. St
The Argyle Diamond Mines process plant incorporates a high level of computerised process control, and facilitates detailed performance monitoring. The control system was designed to provide a high
Jan 1, 1987
-
Kwinana Nickel Refinery - Recent Plant ChangesBy Troman L, Groutsch J. V
The Kwinana Nickel Refinery began operations in 1970 processing sulphide concentrates from Kambalda using the Sherritt Gordon pressure leach and hydrogen reduction process to produce nickel metal as
Jan 1, 1996
-
Study of the Geodynamic Regime of the Region Under Large-Scale Mining in the Apatite-Nepheline Deposits in the Kola Peninsula, RussiaBy V A. Maltsev, V I. Panin
The question of prediction and prevention of dynamic events û rock bursts (RB), tectonic rock burst (TRB) and mining-induced earthquakes (MIE), induced by large-scale mining, are discussed. The mine i
Jan 1, 2000
-
Ore Reserve Reporting Practices of Major Australian Mining CompaniesIn recent years stricter requirements imposed variously by the Companies Acts, auditors and the Stock Exchanges have resulted in annual financial statements of mining companies becoming more detail
Jan 1, 1981
-
Collector û Addition Point and ConsumptionBy D MacKay, W J. Bruckard
One of the mining worldÆs greatest challenges is to effectively use consumables (ie reagents and grinding media) to maximise metallurgical response, while minimising operating costs. It is anticipated
Jan 1, 2008
-
Assessment Of Longhole Open Stope Stability Using Computer ModelsPrediction of large-scale underground opening stability in quite complex mining circumstances is being undertaken on a routine basis at The Zinc Corporation, Limited, (ZC) and New Broken Hill Cons
Jan 1, 1983
-
The Effective Use of ConsultantsBy Tooth MA
Mining, metallurgical and engineering consultants have made a considerable contribution to mining industry development in Australia. Expertise has been developed locally to a high level during th
Jan 1, 1975
-
Concentrator OptimisationThis paper outlines a range of strategies for steady state optimisation of most types of concentrators. Optimisation is considered in terms of comminution performance, energy efficiency, concentrato
Jan 1, 1993
-
In Situ Remediation of Heavy Metal Contaminated Soil or Rock Formations by Directed and Controlled Crystallisation of Natural Occurring MineralsBased on the idea to copy crystallisation and precipitation phenomena occurring in nature, a new technology was developed allowing the preparation of metastable, mineral forming solutions. If these so
Jan 1, 2003
-
Bore Core Evaluation For Coal Mine DesignMuch of the data required for the evaluation of mine design is obtained from bore cores. It is essential to collect data that is useful and not to overlook features which might have adverse effects
Jan 1, 1977
-
Energy Exploration Management in AustraliaThe general theme of the paper is a resume of factors which induce management to explore for oil, gas, coal and uranium in Australia. It is non-technical in the sense that apart from brief reference
Jan 1, 1974
-
Blasting the Way AheadExplosives have been an important tool for unlocking minearl wealth from the earth's crust for several countries. In'the past, innovation in explosives technology, spurred on by industry n
Jan 1, 1988
-
Macroeconomic Factors Affecting Future Mineral Developments in the Pacific Rim RegionEconomic evaluations of mineral projects are based on discounted cash flow analyses, followed by sensitivity and risk analyses. However, the global macroeconomic and political environment in whic
Jan 1, 1987
-
Saxonvale Mine Development a Case Study in Project Planning and Project ManagementSaxonvale mine is a multi bench open pit coal mine developed to its Stage I capacity of 1.75 Mt/y of run of mine coal. Detailed engineering studies for the mine commenced in April 1980, approval t
Jan 1, 1983
-
Copper Tank House Technology Reviewed and AssessedThe present practices in electro-refining of copper are shown to be the result of piecemeal and gradual improvements and innovations as metallurgists responded to changing cost pressures and the avail
Jan 1, 1985
-
Developments in Merchant Mill DesignA continuous casting machine, of the Concast curved mould design casting billets in four strands, was commissioned at the Newcastle Works of The Broken Hill Proprietary Co. Ltd., in November, 1967
Jan 1, 1972