Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Port Radium Mine

    By D. D. Campbell

    "The Port Radium mine of Eldorado Mining and Refining Limited lies on the western tip of a large peninsula midway up the east shore of McTavish Arm, Great Bear Lake, about 30 miles south of the Arctic

    Jan 1, 1949

  • CIM
    Value Added Aluminum Smelter System Integration: Alouette Phase II Experience

    By A. Noël, R. Lapierre, M. Provencher

    "Modem aluminum smelters are facing significant operating cost pressure. Key methods used by smelters to manage this pressure are automation and production-information systems to optimize processes, m

    Jan 1, 2006

  • CIM
    Seeking Consensus ? How Many Samples and What Testwork is Required for a Low Risk SAG Circuit Design

    In Canada and other countries, legislation dealing with accurate factual disclosure for mining projects is being expanded to include more metallurgical design information. Grinding characteristics, me

    Jan 1, 2012

  • CIM
    Observational Construction Management of a Large Scale Underground Railway Station by Urban NATM Based on the Mechanism for Generation of Surface Settlement -Railway Bosphorus Tube Crossing, Tunnels and Stations

    By S. Kobayashi, N. Ohara, T. Aoki, S. Sakurai, M. Iwano, M. Shimo, I. Otsuka

    "This project is the upgrading of a commuter line of approximately 76 km to improve the railway system in Istanbul metropolitan area. Railway tracks have been connected between Asia and Europe through

    Jan 1, 2015

  • CIM
    Surf Inlet and Pugsley Mines

    By J. E. Gill, A. R. Byers

    The Surf and Pugsley gold-copper mines; owned and operated by Surf Inlet Consolidated Gold Mines; Limited; are about 6 miles inland from; the head of Surf inlet; on Princess Royal island; Skeena minin

    Jan 1, 1954

  • CIM
    The Migration of the Slave Province

    By W. G. Wahl

    The Slave Province, a segment of Archean continental crust, migrated west and north from the northern flank of the Superior protoshield shortly after the Kenoran orogeny. The probable cause of migrati

    Jan 1, 1973

  • CIM
    Effect of workpiece temperature on the machinability of alumina / aluminum metal matrix composites

    By A. Saigal

    The effect of temperature on the cutting forces during machining of alumina reinforced aluminum composites was investigated, Aluminum 6061, 10% Al2O3 reinforced composite and 20% Al2O3 reinforced comp

    Jan 1, 2005

  • CIM
    The Experimental Study of Crystal Boundaries

    By Bruce Chalmers

    INTRODUCTION TIE most important practical problem with which Physical Metallurgy is faced is the control of the mechanical properties of alloys. The most difficult aspect of this problem is the devel

    Jan 1, 1951

  • CIM
    Aerial Detection of Radioactive Mineral Deposits

    By A. F. Gregory

    "AbstractA resumé of aerial radiation survey studies performed by and for Eldorado Mining and Refining, Limited, since 1943 is presented. Flight tests were initiated in 1947 and were followed .by inte

    Jan 1, 1955

  • CIM
    The Political and Policy Context Shaping Canadian Energy

    By Paul Stothart

    Agenda 1)Key Political and Policy Issues 2)Relevance to the Mining Sector ?All parties vying to be the greenest ?Regulation, indoor air, health issues combined into Clean Air Act ?International c

    May 1, 2007

  • CIM
    Laboratory Investigation of Stress Gradient Effect at Spalling Experiments on Granite

    By L. Jacobsson, J. E. Lindqvist

    A series of laboratory tests were conducted to study stress-induced spalling on medium to coarse-grained granite specimens. The specimens made from cylinders had two manufactured notches on opposite s

    Jan 1, 2015

  • CIM
    Canadian Mining Innovation Council - Achieving Global Excellence in Mining Research, Education, Innovation and Commercialization

    Why innovate? ? How are we doing in Canada? ? How can we do better? ? Why now? ? What?s next? ? Lowering production costs ? Improving productivity ? Increasing value-added ? Discovering new mi

    May 1, 2008

  • CIM
    The Engineering, Procurement and Construction of the Éléonore Project

    By A. Fortin, C. Fréchette, M. Kreuh

    Éléonore project is a gold ore processing plant at a mine site located near James Bay, Quebec, Canada. SNC-Lavalin was mandated by Goldcorp to perform EPCM services on the ore processing plant and per

    Jan 1, 2015

  • CIM
    Mastering Aboriginal Inclusion in Mining

    Partnership with MiHR ? AHRC and MIHR jointly developed Mastering Aboriginal Inclusion for Mining ? Customization specific to mining Mining is unique? ? History of Aboriginal peoples and the lan

    May 1, 2009

  • CIM
    Evaluating Decision-Focused Stakeholder Consultation at EKATI Diamond Mine

    By Andrew Thrift

    Overview ? Problem ? Research question ? Literature review ? Methodology ? Results ? Discussion and recommendations ? New developments Problem ? Increasingly higher expectations ? Inadequate

    May 1, 2006

  • CIM
    Comminution by Conventional and Autogenous Grinding

    By J. A. R. Faucher

    "Autogenous grinding may be an efficient and economical solution to your ore comminution problem.An important potential economic advantage of autogenous mills results from the availability of very lar

    Jan 1, 1969

  • CIM
    Wet High Intensity Magnetic Separators at Sidbec-Normines

    By A. Lemay, G. Morin, C. Desmeules

    "Incorporated in 1976, Sidbec Normines was mandated to exploit a deposit of specular hematite at Fire Lake. A combined effort of three companies, Sidbec, which holds 50. 1 % of the actions, British St

    Jan 1, 1981

  • CIM
    Simply Empowering: Innovative Software Tools for the Miner

    By J. H. Curran

    Agenda ? Challenges of developed world mining ? Software aids for creative and practical engineering ? Rocscience software philosophy ? Rocscience suite of geomechanics programs ? Case study ? d

    Apr 1, 2005

  • CIM
    Recent electric furnace developments at Falconbridge (Sudbury Operations)

    By J. Chao, C. Tan, N. Stubina

    "Since J978, Falconbridge Limited has operated two electric furnaces at its nickel-copper smelter in Sudbury. As part of its S02 Abatement Program, the smelter has undergone many changes over the last

    Jan 1, 1994

  • CIM
    Revenue Mill Optimization Study

    By D. G. Cerigo

    "INTRODUCTIONAn interim report covering an uncompleted project on revenue mill optimization was presented at the invitation of Mr. C.S. Stevens, the Secretary of the Canadian Gold Metallurgists. The w

    Jan 1, 1967