Deep Foundations - Experience & Problems Encountered-Case Study For Second Thane Creek Bridge At Vashi, New Bombay. - SynopsisBy S. R. Nandargikar
Construction of open foundations for the Second Thane Creek Bridge was indeed a challenging task. Some major problems were encountered during the construction of foundations for pier No. P22 (S/N), P.
Jan 1, 1996
-
Effect of Installation Method on the Ratio of Tensile to Compressive Unit Shaft Resistance of Piles in Dense SandBy A. C. Galvis-Castro, R. Salgado, M. Prezzi, E. Ganju, R. D. Tovar-Valencia
It is generally accepted that the unit shaft resistance of piles in sands is lower for tensile loading than for compressive loading. So far, very little attention has been paid to the influence of the
Jan 1, 2019
-
Some Norwegian Experiences Related to Use of Dry-Mixing Methods to Improve Stability of Excavations and Natural Slopes in Soft ClaysBy Ørjan Nerland, Torgeir Haugen, Astri Eggen, Kjell Karlsrud
"Ground improvement by the deep dry mixing (DDM) method is used in Norway since the late 1970's. A brief review is given of the Norwegian guideline for ground improvement with DDM issued in 2012, but
Jan 1, 2015
-
Application of Triple-Axial CDM Method (Lemni 2/3 Method) for Stabilizing Soft SoilBy Kazuyoshi Kamimura, Masaya Kawata
"It has been 30 years since the cement deep mixing (CDM) method developed in Japan. CDM method has been applied to many structures. While various technical improvements have been implemented in the me
Jan 1, 2015
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme VariabilityBy Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Rock Socketed Drilled Shafts for the Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY consists of a dual-span 1,982.5-ft long cable-stayed bridge with approach spans of
Jan 1, 2016
-
Restoration Of Railway Embankment – A Case StudyBy Prodyot Kumar Ray, Sudip Kumar Koley, Aminul Islam, Somnath Banerjee
One of the most important topics in the construction industry is the building of railway embankments. Being such a delicate and significant structure, it is crucial to properly design the embankment a
Sep 1, 2022
-
How Well Do Helical Piles Resist Earthquakes as Foundation Systems? WHERE TO GO FROM HERE?By Amy B. Cerato, Shawn Allred, Tatiana Vargas
"Helical piles are deep foundation elements that resemble, and are installed like, a large steel soil screw — they have a slender steel shaft with one or more round helix bearing plates welded to the
Jan 1, 2017
-
Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)By Dinesh Hinduja, Pérez: Miguel
"Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders
Jan 1, 2015
-
Foundations Settlement Estimation by Non-Linear Stress-Strain Approach Using CPT RecordsBy Abolfazl Eslami, Fatemeh Valikhah
"Complexity in soil-foundation interaction and subsoil nonlinear behavior cause difficulties and uncertainties in evaluating the actual values of foundation design factors such as settlement. The acqu
Jan 1, 2017
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachBy M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
Geotechnical Assessment Of The Manhattan Cruise Terminal Piers: Analysis Of Timber Piles In Soft Organic SiltsBy Rodrigue Karam
An assessment of the geotechnical conditions at the Manhattan Cruise Terminals (Piers 88, 90, 92 & 94) was conducted after excessive settlement and structural distress was reported at Pier 92. The pie
-
Piled Foundations for the New Wembley Stadium, LondonBy Anthony L. Reynolds, Clifford J. Wren
"The adoption of a significant pile testing regime, the use of Eurocode 7 as the design standard, the development of lean construction techniques, and lateral thinking in overcoming some considerable
Jan 1, 2005
-
Shoring Design of Historic LA Metro StationBy Babak Mamaqani
The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi
Apr 1, 2022
-
DFI46 Panel on Foundation ReuseBy Andy Boeckmann
In early 2021, DFI formed a Foundation Reuse Task Force due to concurrent and coincidental discussions of this topic during meetings of the Subsurface Char- acterization for Deep Foundations and Test
Feb 1, 2022
-
A Resilience Approach for Design of Earth Retaining Systems with Application on MSE WallsBy George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis
"The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.
Jan 1, 2016
-
Underwater Pile HammersBy Douglas L. Scaggs
Driving piles in under water applications has become more common place over the past twenty years. Where only a water depth reachable with a follower or dewatered cofferdam was the rule in the past,
Jan 1, 2013
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Stone Columns Through Construction Demolition Debris FillBy Lok M. Sharma
Development of brownfields is of great interest in these days. Such fields are not easily adaptable for foundations of structures. The uncertainties in ground behavior present challenges of unpredic
Jan 1, 2009
-
Design & Installation of Offshore Driven Piles – A Gulf of Thailand Regional PerspectiveBy Kaushik Mukherjee
"Malaysian offshore and surrounding region are favorable to the installation of driven piles. During the design phase, pile driveability analysis plays a major role in pile make-up design to suit and