Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Wet Heavy Mineral Pilot Plant Design, Assembly, Commissioning And Operation For A Remote LocationBy P. A. P. Fouché
Processing confidence for a bankable feasibility study on a green field heavy mineral deposit is inmost cases achieved only through bulk sample processing. Bulk sample is classified as a large enough
Jan 1, 2007
-
Multivariate Resource Modelling For Assessing Uncertainty In Mine Design And Mine Planning ? SynopsisBy C. Montoya
This paper shows, through a case study, the impact of multivariate grade modelling upon mine design and mine planning. A deposit explored by drill holes is considered, in which the grades of five elem
Jan 1, 2012
-
A Step towards Combating Rockburst Damage by Using Sacrificial SupportBy R. A. Govender, A. Mudau
"Rockbursts continue to be a major contributor to mine accidents and cause of damage to mine excavations, particularly at great depth. The problem of rockbursts has also escalated in civil engineering
Jan 1, 2016
-
Process mineralogical characterization of the Swartberg polymetallic sulfide ore, South Africa, H.J.J. Gordon, G. Stroebel, J.A. Miller, K.C. Corin, A.E. Landsberg, and M. BeckerBy A. E. Landsberg, K. C. Corin, G. Stroebel, J. A. Miller, M. Becker, H. J. J. Gordon
Geometallurgy represents an integrated approach to mine planning and operation whereby the naturally occurring ore variability and its effects on all key downstream activities in the mine life cycle a
Jan 1, 2020
-
Conformation and association of confined anionic and cationic lithium mineral collectors in saltwater: Insights from, molecular dynamics simulations Q. Gonzalo, R.E. Roberto, and T.G. PedroBy T. G. Pedro, Q. Gonzalo, R. E. Roberto
Anionic surfactants, such as oleic acid and sodium oleate (OLE), and cationic surfactants, such as dodecyl amine-hydrochloride (DDA), are used as flotation collectors of spodumene. However, recovery i
Jan 1, 2020
-
Development of a Geometallurgical Model for a Copper ConcentratorBy B. Mulcahy, M. Valenta
"The purpose of executing a project in a stagewise fashion is to evaluate all potential options in a cost-effective manner and develop an understanding of the project drivers, thereby minimizing overa
Jan 1, 2016
-
Self-learning infill drilling for strategic mine planning: Simultaneously optimising the value of additional information in a mining complex under grade uncertainty APCOM 2021By Z. Levinson, R. Dimitrakopoulos
A mining complex is an engineering system where raw materials are extracted from several mines, processed, transported, and sold to the market. The uncertainty and local variability of material grades
Sep 1, 2021
-
Static Recrystallization Behaviour of Ti-Nb Microalloyed High-Strength SteelBy G-L. Wu, X-B. Liu, C-Y. Zhou
"The static recrystallization behaviour of Ti-Nb microalloyed high-strength steel during hot deformation was studied by conducting double-hit hot compression experiments using a Gleeble-3500 thermomec
Jan 1, 2017
-
A General Model for Semi-autogenous and Autogenous MillingBy L. G. Austin
The paper summarizes the current state of development of simulation models for SAG and FAG mills, and gives the results of recent investigations of the physical processes occurring in autogenous grind
Jan 1, 1987
-
Integrated Short- And Medium-Term Underground Mine Production Scheduling ? SynopsisThe development of short- and medium-term mine production schedules in isolation from each other has meant that only a local optimum can be achieved when each scheduling phase is carried out. The glob
Jan 1, 2012
-
Use of an Energy Balance around the Mill Sump to Estimate Mill Discharge DensityBy M. H. Moys
A method of estimating the percent solids in the discharge from a grinding mill is described and tested on both pilot and industrial scale. It involves the use of energy and mass balances around the m
Jan 1, 1987
-
Preconcentration Of UG2 Platinum Ore: Economic Benefits - SynopsisBy F. Smit
Mining and plant practices can benefit from preconcentration of UG2 platinum ores in a dense medium separation (DMS) plant. The main benefit of DMS is the selective discard of waste from the feed stre
Jan 1, 2013
-
Analysis of Deep-level Mine Design Problems Using the MINSIM-D Boundary Element ProgramBy J. A. L. Napier
Computer programs which rely on the assumption of linear, elastic rockmass behaviour have been used routinely for many years in the South African mining industry to determine the stresses arising in t
Jan 1, 1987
-
Incorporation of rehabilitation cost into the optimum cut-off grade determination - SynopsisBy J. Gholamnejad
Determination of the optimum cut-off grades is one of the most important aspects of mine production planning. A cut-off is a grade below which we choose not to process material. This material is treat
Jan 1, 2009
-
Keynote Address: Theoretical, practical and economic difficulties in sampling for trace constituentsMany industries base their decisions on the assaying of tiny analytical sub-samples. The problem is that most of the time several sampling and sub-sampling stages are required before the laboratory pr
Jan 1, 2009
-
Evaluation Of Reductants Used For Ilmenite Smelting Based On CO2 Reactivity (Boudouard Reaction) Measurement - SynopsisBy P. Jordan
The practice of ilmenite smelting in electric arc furnaces has been researched and published over the last few decades. An issue that has not been addressed is the understanding of the properties of i
Jan 1, 2011
-
The influence of conditional bias in optimum ultimate pit planningBy E. J. Magri, A. Couble
Kriging estimates of geological resources are sometimes conditionally biased because the kriging plan contains too few samples. This may be done purposely in order to match the variance of the estimat
Jan 1, 2003
-
Towards electrode immersion control on Lonmin?s no. 1 circular furnace - SynopsisBy G. A. Georgalli
A control philosophy to be applied by Lonmin to maintain constant electrode immersion in their no. 1 circular smelting furnace is put forward. This control philosophy is facilitated though a combinati
Jan 1, 2008
-
Applications And Benefits Of 3D Lasers Canning For The Mining Industry ? SynopsisBy J. W. van der Merwe
Technology is advancing at a rate that makes it extremely difficult for the mining industry to keep pace. Many advances occur within a given piece of technology and often this is missed by the discipl
Jan 1, 2013
-
Linear Elastic Numerical Modelling For Failure Prediction, An Assesment - SynopsisBy S. K. Murphy
A partial shaft pillar extraction project was embarked on at a mine in the West Wits mining region in South Africa. Prior to the extraction, a rock engineering assessment was conducted with the main o
Jan 1, 2012