Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Kemano Power TunnelBy Kenneth R. Dickson, I. Michael Gowring, Gary M. Davey
The Kemano Power Tunnel is currently being constructed by a joint venture of Atkinson, Kiewit, and Commonwealth. The 5.73 m diameter, 16.1 km long tunnel is part of the Kemano Completion Project in Br
Jan 1, 1991
-
Geotechnical Aspects Of The Mt. Baker Ridge Tunnel DesignBy Robert A. Robinson, Steven R. Thompson, Harvey W. Parker
The Mt. Baker Ridge Tunnel, under construction in Seattle, will be the world's largest-diameter soil tunnel with an inside diameter of 19.2 m (63 ft) and an effective outside diameter of about 24
Jan 1, 1983
-
Alternative Ground Pillar Control In Soil And Weak RockBy Reinhard Gnilsen
Ground pillar control in soil and weak rock often represents a critical and sometimes a determining factor for mined underground civil structures. A concept is desirable that minimizes the restriction
Jan 1, 1987
-
Offshore Shaft Construction In The North SeaBy J. N. Adamson
The Alcan Smelter project at Lynemouth on the Northumbrian coast draws cooling water for the power station through shafts and tunnels from the North Sea. The sea at this part of the coast is frequentl
Jan 1, 1997
-
Tunnel Boring Machine Concept for Converging GroundBy Rock M. Poulin, Bruce G. Moulton, Daniel E. Nowak, David T. Cass
The Yacambu Irrigation Tunnel Project of 34 km, 5 meter diameter circular and horseshoe section, has been under construction since the early 1970's. Notable among the excavation challenges is hig
Jan 1, 1995
-
Experimental studies on corrosion of rock anchors in US underground coal mines - SME Transactions 2010By A. J. S. Spearing, G. Bylapudi, K. Mondal
The mining industry is a major consumer of rock anchors in the United States. Due to the high humidity in the underground coal-mining environment, the rock anchors corrode and lose their load bearing
Jan 1, 2010
-
Some New Developments In Discrete Numerical Methods For Dynamic Modelling Of Jointed Rock MassesBy Joaquin Marti, Peter A. Cundall
This paper reports on some recent work in which several schemes were developed to model jointed rock under high stress, with particular reference to the phenomenon of "block motion" observed during dy
Jan 1, 1979
-
Some Geotechnical And Planning Considerations In Underground Siting Of Nuclear Power PlantBy R. C. Oberth, C. F. Lee, E. M. Taylor
INTRODUCTION Underground siting of nuclear power stations is drawing increasing attention in various parts of the world. Scandinavian countries took the early lead in this field because of their ex
Jan 1, 1979
-
Contractual Arrangements For ConstructionBy Louis W. Riggs
The primary concern in dealing with contractual arrangements for construction is getting the work completed satisfactorily, in the shortest time, and for the least expense for the owner--while assurin
Jan 1, 1979
-
Prediction Of Settlements Due To Tunneling In Soil: Three Case HistoriesBy Birger Schmidt
INTRODUCTION Urban tunneling in soil poses a unique set of problems to planners, designers and contractors. One of the important concerns is the impact of tunneling on the environment: not only the
Jan 1, 1974
-
Design And Construction Of The Soudan 2 Detector LaboratoryBy D. Lee Petersen, Charles R. Nelson, Marvin Marshak
INTRODUCTION Construction is underway on a laboratory cavern 713 m below surface at the Soudan Mine, Tower-Soudan State Park, in northeastern Minnesota. The 13.9 in wide by 11.6 m high by 71.8 in l
Jan 1, 1985
-
Coal : One of the Few Bright Spots Amidst the Mining GloomBy Donald E. Ralston, A. T. Yu, Richard P. Killmeyer, Peter Phillips, R. W. Vander Laan, John N. Murphy, John R. Messineo, John Peters
Overview Coal production in the first half of 1982 remained near the high levels begun in mid-1981. Production then fell sharply during the latter part of the year due to recession-weakened demand. E
Jan 5, 1983
-
Shaft Sinking Concepts And Two Independent Systems Of Concurrent Development Through The Shafts Being SunkBy P. J. L. Nel
The paper describes several successful concepts used in the sinking of shafts on the Elandsrand Gold Mine. The concepts enabled the shaft sinking time to be reduced as well as the period in which deve
Jan 1, 1981
-
Ground Deformations Ahead Of And Adjacent To A TBM In Sheared Shales At Stillwater Tunnel, UtahBy David A. Roberts, Edward J. Cording, James W. Mahar, Robert A. Robinson, Noppadol Phienweja, Harvey W. Parker
Horizontal inclinometer and deflectometer casings were used to measure deformations up to 15.2 m (50 ft) ahead of and adjacent to the heading in highly fractured and sheared shales at the Stillwater T
Jan 1, 1985
-
Optimization Of Waterjet Systems For Mining ApplicationsBy James M. Reichman
Waterjet assist of mechanical cutters has been demonstrated in a variety of laboratory studies as well as on field equipment. As this technique becomes more widely accepted, it will be necessary to de
Jan 1, 1985
-
Creighton No.9 Shaft 7,137 Feet Sunk In One LiftBy James S. Redpath
"The ways of the world be many and most of the ways be tried, you follow in the footsteps of others till you come to the great divide". These words, written by Robert Service a long time ago, come to
Jan 1, 1997
-
Underground Contracting Practices/A Case StudyBy G. S. Brierley, R. D. Drake, J. E. Kelley, J. C. Kellogg
This case study embodies the problems of an underground project under current contracting practices. It will provide a realistic framework for a structured examination of the anatomy of a major comple
Jan 1, 1989
-
Dry Fine Coal Cleaning Using Rotary Triboelectrostatic Separator (RTS)By D. Tao
Coal is a major source of energy in the U.S. and more than 51% of the electricity used in the country is generated from coal. Coal cleaning prior to combustion is necessary and often accomplished usi
Jan 1, 2010
-
Direct-on-filter FTIR analysis of respirable crystalline silica: A field study - ME Feature ArticleBy R. Pandey, G. Elie, E. Sarver
Respirable crystalline silica (RCS) is generally considered the most hazardous constituent of coal mine dust, and a new federal rule is expected to further limit exposures in U.S. mines. For regulator
Jun 1, 2025
-
Specialized Urban Shaft ConstructionBy Gary A. Almeraris, Thomas F. Peyton
This paper describes the innovative procedures employed during the construction of 3 deep shafts within the confines of New York City. The shafts, which varied in diameter from 1.8m (6ft) to 7.3m (24f
Jan 1, 1989