Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Origin Of The Problem: Rapporteur?s Report ? IntroductionBy Malcolm Ross
The Reserve Mining Co., in the processing of taconite iron ore quarried from the Peter Mitchell Pit, deposited the finely crushed waste rock into Lake Superior near Silver Bay Minnesota. In the early
Jan 1, 2007
-
Major Issues In Subsidence RegulationBy Gregory R. Gorrell
The legal issues surrounding the regulation of subsidence are among the major concerns facing the underground mining industry today. Whether subsidence occurs almost immediately as a result of longwal
Jan 1, 1986
-
Minnesota Iron Mining Industry Looks at ChangeBy William R. Yernberg
The combined 76th Annual Minnesota Section of SME meeting and 64th Annual University of Minnesota Mining Symposium were held April 8and 9, 2003, in Duluth, MN. This year’s theme was “Stakeholders, Par
Jan 1, 2003
-
Explosion Phenomenology In Jointed Rocks -New Insights-By F. E. Heuze
This article deals with the effects of high-explosive and nuclear explosions in rock masses. We first highlight the strong influence of geological discontinuities, such as joints and faults, on ground
Jan 1, 1991
-
Maintenance Contract on Cat 785 Trucks Works Well at Round MountainBy J. B. Rasmussen
As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle
Jan 1, 1991
-
Narrow vein shrinkage stope ventilation measurement using tracer gas and numerical simulationBy G. Arpa
Ventilation survey using tracer gas measurement is one of the techniques for mine ventilation design, monitoring and investigation of movement of fresh air and contaminants. However, there has been li
Jan 1, 2009
-
Cat Tests 360-st 797 Truck, Upgrades Wheel LoadersCaterpillar’s 797 327-t (360-st) mining truck is currently being tested at the company’s proving facilities. Mine evaluations began in the second quarter. The unit will be commerically available in
Jan 1, 1999
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
Investigation of Stability of an Unconventional Water-Obstruction Gate Pillar with a Curved Boundary in Mining Inclined Ultra-Thick Coal SeamsBecause of complex geological environments, a number of coal reserves occur in inclined or dipping coal seams in certain parts of the world. Longwall top coal caving using split-level a singleentry pa
Jan 7, 2020
-
A Methodological Model To Assist On The Optimization And Risk Management Of Mining Investment DecisionsBy J. A. Botín
Identifying, quantifying and minimizing technical risks associated to investment decisions is a key challenge for the minerals industry decision takers and investors. However, risk analysis in most b
Jan 1, 2011
-
Cable Shovel Health And Longevity In Formation ExcavationBy S. Frimpong
Cable shovels are used for primary excavation in in-situ and/or pre-fragmented formations in surface mining operations. Poorly fragmented hard rock formations and random occurrence of hard boulders i
Jan 1, 2007
-
Rock Mass Mechanical Behavior Assessment at the Porce III Underground Powerhouse Complex, ColombiaBy Ludger Suarez-Burgoa
At the Porce III Underground Powerhouse Complex in Colombia, the observational method (Peck, 1969), was used to provide information to an underground wedge and a 2D Finite Element Method numerical mod
Jan 1, 2008
-
Direct Measurement And Control Of Sag Volumetric Loads Using Embedded SensorsBy A. Vien
Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This pa
Jan 1, 2001
-
2. Drill-Hole Data Management and Display ? IntroductionBy Richard A. Bideaux
With both unit costs per meter and average depth of drilling constantly increasing, there is a strong incentive to maximize the information acquired from drill holes, and then to make this information
Jan 1, 1979
-
Maintenance Program: A Void With Penalties Or A Path To EffectivenessBy Paul D. Tomlingson
There are huge benefits for mining operations that have a well-defined maintenance program that is understood and followed across the total operation. But for operations lacking a quality maintenance
Jan 1, 2008
-
Managing Copper In Leach Solution At The Çöpler Gold Mine: Laboratory Testing And Process DesignBy M. Botz
Alacer Gold Corporation is constructing the Çöpler Gold Mine in eastern Turkey. Mining commenced in the fourth quarter of 2009 and gold production started in the fourth quarter of 2010. The mine is
Jan 1, 2011
-
Management By Loss In Mining - Introduction - Preprint 09-017By M. J. Ramos
Without an exclusive definition of administration in business, we could propose to define it as performance by management to adopt or implement established business formulas. Administration could als
Jan 1, 2009
-
Selective Copper Recovery with HCl Leaching from Copper Oxalate Material Mining, Metallurgy and Exploration (d35b21fb-0dcb-4cd4-94b9-4575e3b19bb0)By Hasan Nizamoğlu, Z. Abidin Sarı, Aslıhan Demiraslan, M. Deniz Turan, Tolga Depci
In this study, recovery of copper from solid material (obtained by leaching of chalcopyrite with oxalic acid in the presence of hydrogen peroxide) with a copper oxalate structure was carried out selec
-
Kenya- A New Source Of Titanium MineralsBy J. C. Potvin
Although the occurrence of deposits of titanium minerals on Kenya’s present day beaches and adjacent dune systems has been well documented, the potential for older formations to host economically viab
Jan 1, 2001
-
Design, Construction And Start-Up Of The Ilo Smelter Modernization ProjectBy H. Walqui, C. Noriega
Southern Copper Corporation (SCC) is one of the world’s largest copper companies and is finishing the modernization of the Ilo copper smelter. A single ISASMELTTM furnace will start smelting 1,200,000
Jan 1, 2007