Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Non-Deal DetonationBy Eric Dussell
Commercial or industrial explosives are mechanically-mixed, fuel-oxidizer composites which exhibit varying degrees of non-ideal behavior. Non-ideality results from a relatively slow and state-insensit
Jan 1, 1997
-
Stochastic Mine Planning Optimization: New Concepts, Applications and Monetary Value in an ever Uncertain MarketBy Roussos Dimitrakopoulos
Conventional approaches to estimating reserves and optimizing mine planning and production forecasting result in single, often biased forecasts. This is largely due to the non-linear propagation of er
Oct 1, 2009
-
The Optimum Condition For Cr(VI) Bioremediation in Soils Contaminated by Chromate Ore Processing ResidueBy Changqing Su
A batch incubation experiment has been carried out to investigate the optimal condition for the microbial remediation of hexavalent chromium (Cr(VI)) in soils contaminated by chromate ore processing r
Jan 1, 2010
-
Numerical Modelling of Confinement Effects on Mechanical Properties and Failure Pattern of Brittle Rocks in Triaxial Tests with PFC3DOne of the most important goals of the experiments is to determine deformation and strength of the rock specimen under applying triaxial load, the status of failure condition is one of the subjects wh
Nov 25, 2010
-
Evaluation Of The Molding, Coining, And Sintering Properties Of Iron PowderBy Jerome F. Kuzmick
INTRODUCTION THE use of iron powder during the post-war conversion period has been increasing with great rapidity. This is particularly true in regard to the manufacture of molded mechanical parts
Jan 1, 1948
-
Hidden Valley gold project development summary, 1987-1991This paper summarises the development t,) date for the Hidden Valley Gold (HVG) Project. It starts with the original exploration work, covers the detailed feasibility study activities and conclude
Jan 1, 1991
-
Wainui Mill - Processing Gold Ores of the Thames AreaThe Wainui Mill was conceived as a 60 - 90 t/d central mill to process gold ores of the Thames area of New Zealand from small mines in the district. The ores of the region exhibit various degrees of r
Jan 1, 1986
-
On Stream Analysis and Computer Process Control Selection at the Thompson Mill, Inco LimitedBy P. Chaddock
The Thompson Mill has a capacity of 15,000 T ID of ore and produces two grades of nickel concentrate, copper concentrate and occasionally graphite concentrate. Up to July of 1985 we processed two dist
Jan 1, 1987
-
Determine Machinery Condition by Vibration and Noise AnalysisBy James G. Lyons
All machines vibrate and make noise. An increase signals impending trouble. Vibration and noise analysis allows the condition of the machine to be determined without costly interruption in service for
Jan 1, 1977
-
Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big TwistBy James P. Stewart
This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une
Jan 1, 2003
-
The First Two Years of Milling at RenabieBy E. G. Kearnery
Introduction It is believed that the present paper will be of some interest, not because of any outstanding features of Renabie milling practice but because Renabie is the first gold mining propert
Jan 1, 1950
-
Computer-aided instruction in mine automationBy M. J. Scoble, L. M. Daneshmend, C. Hendricks
Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993. An attempt is made to relate emerging technologies to education and training req
Apr 1, 1994
-
American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in RockBy S. Schina
Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requireme
Jan 1, 2001
-
Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base TunnelBy Michael Rehbock-Sander
The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked
Jan 1, 2012
-
-
Constraints and Advantages of the Crown Minerals Act and the Resource Management ActBy A P. Brown
Access arrangements required with landowners and occupiers; relaxation on size of permits; lack of confidentiality for information provided; one-stop shop under RMA, removal of standing; plethora of c
Jan 1, 1997
-
Numerical Modelling Of The Yielding Of A Stabilizing Pillar/Foundation System And A New Design Consideration For Stabilizing Pillar FoundationsFollowing a short review of selected literature, a back analysis of stress measurements of stress regeneration in a closed mini-longwall is shown. The agreement is good, lending confidence to the para
Jan 1, 1998
-
Producing – Equipment, Methods and Materials - Deformable Diverting Agent for Improved Well StimulationBy D. S. Pye, J. P. Gallus
Successful hydraulic pressure treatment of oil and gas wells that have long producing intervals, multiple pay zones, fluid thief zones, or natural or induced fractures has long been a serious problem
Jan 1, 1970
-
Enhancement of a Process Flowsheet for Recovering and Concentrating Critical Materials from Bituminous Coal Sources Mining, Metallurgy and Exploration (2cb05380-838b-438b-903d-9a26c1191012)By A. Noble, R. Q. Honaker, J. Werner
Recovery of rare earth elements (REE) from coal-related resources has recently received significant interest due to supply concerns and their key roles in critical industries and defense-related techn
-
The Strength Of, and Stresses In, Coal and Coal Mine RocksBy Hargraves A. J
With increasing depth, stresses and stress phenomena are becoming more important considerations in Australian coal mining.A large number of compressive and tensile strength tests was made on coal and
Jan 1, 1962