Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Treatment of and Gold Recovery from Effluent at Giant Yellowknife Mines LimitedBy G. Halverson, K. Blower
"Giant Yellowknife Mines Limited (Giant) has been producing gold since 1948. Located at Yellowknife, Northwest Territories, Canada, see Figure 1, the mine processes approximately 1,200 short tons per
Jan 1, 1987
-
Development Of A Preliminary Methodology For Determining Maximum Economic RecoveryBy H. Maleki, G. Tetreault
This study was initiated by the Bureau of Land Management (BLM) to develop guidelines for determining the maximum economic recovery of resources in coal mines. The work was in response to a requireme
Jan 1, 2001
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile DesignBy Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USABy D. R. Tesarik
Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near
May 1, 2007
-
Evaluation of Optical Sizing MethodsBy Russell Carter, Tom Barkley
"Optimization of blasting is hampered by the lack of inexpensive methods of measuringblast results. Optical methods of size analysis have the potential of creating abreakthrough in size analysis and i
Jan 1, 1999
-
Energy Conservation at Falconbridge Nickel Mines LimitedBy D. M. Doyle
"In this paper I will summarized the Falconbridge Nickel Mines1) energy costs and consumption data by fuel, process, cost centre and estimate our future costs and consumption patterns 2) detail the di
Jan 1, 1978
-
Problems in Proration on the Basis of Gas EnergyBy Eugene Stephenson
CRITICAL analyses of the work expended in producing oil by the utilization of gas energy have appeared in the publications of Shaw,1 Pierce and Lewis,2 and Herold,3 authors who have ably discussed the
Jan 1, 1931
-
Pyrite Bioleaching and Slag Neutralisation - Two Treatments in a Single Process for Recovering Valuable Metals from Both MaterialsPyrite Bioleaching and Slag Neutralisation - Two Treatments in a Single Process for Recovering Valuable Metals from Both Materials Very often the production of copper sulfide concentrate yields pyrit
Sep 13, 2010
-
Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project - Basis of DesignBy Jimmy Thompson
The Santa Clara Valley Transportation Authority is designing the Silicon Valley Rapid Transit Project in San Jose, California. The project includes 6.9 km (4.3 miles) of twin-bored tunnels to be const
Jan 1, 2008
-
Micropile And Soil Nail Load Transfer Rates In The Puget Sound Region Of Washington StateBy Carole L. B. Mitchell
The increased use of micropiles and soil nailing presents a growing database of verification and sacrificial load test data. In Washington State, the use of micropiles is becoming common, and soil na
Jan 1, 2006
-
Coal ReviewBy F. Freme
Coal production in the United States in 2007 totaled 1.03 Gt (1,145.6 million st), according to preliminary data from the Energy Information Administration (EIA) (Ta-ble 1). This is a decrease of 1.5
Jan 1, 2008
-
Nyrstar Port Pirie RedevelopmentBy B Kretschmer, G Bartel, B de Villiers, W Watt
"The Nyrstar Port Pirie Smelter, located on the eastern shore of the Upper Spencer Gulf in South Australia 230km north of Adelaide, began operation in 1889 to process lead concentrate from the Broken
Sep 7, 2015
-
The Advantages of Recycled Oil in Blasting, a Refreshing ApproachBy Joseph Daly
This is the detailed evaluation of the establishment and implementation of an ‘oil recycle plant’ located on site at Boggabri Mine NSW, (Australia); its production, its use and its value. Also discuss
Jan 1, 2014
-
The “Mill Redesign Project” at INCO’s Clarabelle Mill (54ceb038-1593-4f87-9a10-6e2a572d48df)By Jim Truskoski, Alain Bouchard, Andy Kerr, Germain Labonté, Jim Barrett
"Improving mill grade recovery relationships is always good business. INCO’s Clarabelle Mill has just undergone a $16 million process upgrade that was designed to improve nickel recovery by 2%. The “M
Jan 1, 2003
-
Near-Source Observations from Signle and Multiple Cylindrical Explosions in a Coal MineBy Xiaoning Yang, C David Pearson, Brian W. Stump
An experimental study of ground motion from explosions designed to remove overburden in an open pit coal mine is reported. The purpose of this study is a characterization of these ground motions in th
Jan 1, 1994
-
Leaching of Zinc from Calcined Angouran Plant Flotation Tailings Using Sulphuric AcidBy S Moradi
The aim of this study was to investigate the possibility of leaching zinc from the tailing (-2 mm) of Angouran flotation plant using sulphuric acid. The tails were first calcined at 800¦C for one hour
Jan 1, 2002
-
MADIQ Tunnel, Lebanon: TBM Tunneling Vs. Karst GeologyBy William D. Leech
Lebanon used a TBM for the firsttime to excavate a tunnel in the country. A main beam TBM, built in 1979, bored the 3.8 m (12.5-ft) diameter by 4,020 m (2.5-miles) Madiq Tunnel. The TBM bored through
-
Inquiring Ears Want To Know - A Fact Sheet About Your Hearing TestThis sheet explains your audiogram (hearing test) and gives some basic information about protecting your hearing. Keep it so you can refer to it later. What is an audiogram? • An audiogram is ofte
Jan 1, 2008
-
MLA 38-82 - Mineral Resources Of The Mount Washington Wilderness, Deschutes, Lane, And Linn Counties, California ? Summary StatementBy J. Douglas Causey
A U.S. Bureau of Mines study indicates over 200 million yd3 (153 million m3) of cinder resources occur in the Mount Washington Wilderness. No future demand for the deposits is anticipated. Based upon
Jan 1, 1982
-
Comparisons of the Geology and Proposed Underground Mining Methods of the Panda and Koala Kimberlites at the EKATI Diamond MineBy Peter A. Oshust
The EKATI Diamond Mine has successfully completed the development and commissioning of the Panda Underground Project to extract the ore below the Panda open pit. The dominant kimberlite domain of the
May 1, 2006