Search Documents

  • AUSIMM
    No. 2 Open Hearth Plant at Port Kembla

    By Edmonds W, Jeffcoat R

    The completion of the first two open hearth furnaces in the new No. 2 open hearth plant at Port Kembla will increase Australian production of steel by 350,000 tons of ingots per annum.The paper gives

    Jan 1, 1957

  • ISEE
    Cast Blasting in the Light of the Electronic Option

    By Winfried Rosenstock

    The development of electronic initiation systems has partially reached or will reach in a short period of time full reliability for general use without limitations. Unfortunately those systems meet wi

    Jan 1, 2003

  • SME
    Reproducibility Of Bond Work Index With Different Standard Ball Mills

    By P. C. Fletcher, E. Kaya

    The Bond grindability testing procedure has been standardized to measure the same grindability values, i.e. Bond work index (BWi), for the same ore when tests are performed in different laboratories o

    Jan 1, 2002

  • CIM
    Improving reliability and productivity at Syncrude Canada Ltd. through materials research: past, present, and future

    By S. Hoskins, S. Chiovelli

    "The annual budget for the repair and maintenance of equipment at Syncrude Canada Ltd. is in excess of $450 million. Of this amount, a significant portion can be attributed to the loss of material on

    Jan 1, 2004

  • SME
    Cribless Tailgates In The Pittsburgh #8 Coal Seam Employing Cable Trusses – Preprint 97-199

    By A. Wahab Khair, John G. Oldsen, John C. Stankus, Song Guo

    During the last several years, implementation of trusses, in lieu of wood cribs, has been successful for supplemental tailgate support in the Pittsburgh seam. This paper reviews, the truss support sys

    Feb 24, 1997

  • DFI
    Non-Destructive Testing, Evaluation And Optimization Of Existing Deep Foundations For Re-Use Along The East Coast

    By Matthew E. Meyer

    Renovation, rehabilitation, restoration and expansion of existing residential, retail, commercial, hospital facilities and historic structures requires assessment and evaluation of foundation systems

    Jan 1, 2011

  • AUSIMM
    Paper No. 129. Description of The Reduction Plant And Processes of Reduction of Wyalong Ores.

    he Wyalong goldfields were discovered in September, 1893, Messrs. Neeld and Sons, owners of the principal mine, being the pioneer prospectors. During the earliest days of the field the ore was sent to

    Jan 1, 1903

  • DFI
    Piling Problems - Introduction

    By D. Millgard

    Dennis Millgard introduced the Session by hoping that participants to the Conference would also share their piling problems. He then invited the first speaker to present his paper. Paper 5.1.

    Jan 1, 1991

  • SME
    Tunneling for the Eastlink Project, Melbourne, Australia

    By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith

    The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M

    Jan 1, 2007

  • NIOSH
    RI 3445 Effect Of Acid Treatment Upon The Ultimate Recovery Of Oil From Some Limestone Fields Of Kansas ? Introduction (acdfce00-e533-4c06-8b4b-1c06d3c841ba)

    By R. E. Heithecker

    In Kansas, almost every oil well drilled into a limestone formation is treated with hydrochloric (muriatic) acid upon completion. This is done to increase the potential capacity of the well and thereb

    Jan 1, 1939

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • AUSIMM
    The Research on Refined Gold Bullions Surface Upgrading

    The Research on Refined Gold Bullions Surface Upgrading

    Sep 13, 2010

  • NIOSH
    RI 6741 The Mass Spectra And Correlations With Structure For 2-t-Butyl-, 3-t-Butyl-, 2,5-di-t-Butyl-, And 2,4-di-t-Butylthiophenes

    By Norman G. Foster

    The mass spectra of four tertiary butyl substituted thiophenes are reported. A comparison and contrast with earlier structure correlations made by API-RP48 mass spectroscopists is presented. The fragm

    Jan 1, 1966

  • SME
    Flambeau And Ridgeway Mines – Lessons Learned

    By F. D. Fox

    The Flambeau and Ridgeway Mines, both owned and operated by wholly owned subsidiaries of Kennecott Minerals Company, were located very close to populated areas having initial concerns about health, sa

    Jan 1, 2003

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • SME
    Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?

    By Bruce Cavender

    Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa

    Jan 1, 2008

  • DFI
    Water Tightness Of Diaphragm Walls

    By Radianto Elprama

    For the realisation of the underground railway line RandstadRail in the city area of Rotterdam a bored tunnel is under construction. Diaphragm walls up to a depth of about 40 m were used to construct

    Jan 1, 2006

  • AUSIMM
    Notes on Practical Mining in Bendigo

    In undertaking to write a few notes on practical mining in Bendigo, the great quartz mining centre of Victoria, which just now is celebrating its fiftieth anniversary of gold mining, satisfaction must

    Jan 1, 1902

  • SME
    TPM (Total Productive Mining)

    By G. Budge

    In the extractive industry the term ‘continuous improvement’ (CI) usually means procurement of the latest state of the art equipment. This is generally perceived as the only way to add further value

    Jan 1, 2001

  • CIM
    Technology Options and Innovation for Copper Heap Leaching

    By Damian Connelly

    The metallurgical heart of the majority of copper oxide processes is the heap leaching operation. Fresh low grade sulfide ores is a far greater challenge.The success of this unit operation is so impor

    Jan 1, 2019