Search Documents

  • AUSIMM
    The Influence of Resource Rent Taxation on Mining and Investment Strategies

    By A D. Stewart Gillies

    Resource rent taxes are taxes which only become effective at such a time as a pre-determined rate of return has been achieved by an operation. Resource Rent Taxes have from time to time been considere

    Jan 1, 1995

  • AUSIMM
    Notes on Mount Read and its Sulphide Ore Bodies

    Mount Read is 'situated in the county of Montagu, on 'the west coast of Tasmania, about 20 miles inland from. Remine in an easterly direction, 15 miles northerly from Mount. Lyell, and 30 mi

    Jan 1, 1901

  • AUSIMM
    Hydrologic and Environmental Changes in the Gippsland Basin

    The Gippsland Basin, southeastern Australia, has an Upper Cainozoic history of episodic change of hydrology and the related environment, reflected in the geomorphology and surficial deposits of the

    Jan 1, 1992

  • DFI
    Quality Control Of Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Piles ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2003

  • AUSIMM
    Recent Developments in Stress Analysis and Live Reclaim Prediction within Iron Ore Stockpiles

    By K C. Williams, A W. Roberts, J D. Prigge

    For stockpile design, the flowability and structural interfaces are critically dependant on the stress conditions throughout the pile. Historically, the predictive methodologies for stress determinati

    Aug 12, 2013

  • AUSIMM
    Paper No. 174. Rare Earths: Their Occurrence And Use.

    THE present article makes no claim to be exhaustive, since it cannot contain all the knowledge which scientists and manufacturers of the compounds of the rare earths have gained. The following notes a

    Jan 1, 1909

  • SME
    Design/Build of Tunnel and Shaft at Blue Ridge Dam LLO

    By Carl Johnson, D. R. Todd

    The Blue Ridge Low Level Outlet (LLO) was a design/build contract to provide a secondary means of discharging water from the Blue Ridge Reservoir. The project involved driving a 3.25 m (11 ft) modifie

    Jan 1, 2005

  • SME
    Waterproofing: Key to SCL tunnel lining design

    The global tunneling industry has many challenges, both technically and financially, with the latter likely to be a significant feature over the next few years. Many industries have ad-opted standard

    Jan 1, 2010

  • CIM
    An experimental investigation into the trapping model core pillars with reinforced fly ash composites

    By M. K. Mishra, U. M. R. Karanam

    Relative to slender pillars, larger size pillars exhibit improved strata control. Fly ash, though traditionally treated as a waste product, is emerging as an alternate engineering material. This paper

    Jan 1, 2008

  • CIM
    Froth Flotation: The Kinetic Approach

    By R. R. Klimpel

    "SYNOPSISA discussion of the importance of flotation rate in the analysis of mineral flotation is presented. In particular, the highly interactive nature of the flotation ""system"" is emphasized wher

    Jan 1, 1984

  • SAIMM
    New Opportunities ? Exhaustive Monitored Copper Coolers For Submerged Arc Furnaces (0496ee01-222b-4cf7-b688-79441e60e149)

    By M. Hopf

    The use of water-cooled copper components as sidewall elements of submerged arc furnaces and other pyrometallurgical applications has become increasingly common. The high cooling efficiency of copper

    Jan 1, 2006

  • SME
    Columbus Circle Station Complex - History and Rehabilitation

    By Aram Grigoryan

    This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th

    Jan 1, 2008

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010

  • SAIMM
    Life And Design Of Bord-And-Pillar Workings Affected By Pillar Scaling

    By M. D. G. Salamon

    It has been noted in recent years that the pillars in some bord-and-pillar workings scale or spall. In due course this process may result in the collapse of the affected panels. This paper presents a

    Jan 1, 1998

  • SME
    Successful Application Of Remote Seals Used To Extinguish A Coal-Mine Fire

    By D. Bour, C. Nyikos, R. Curtice

    Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti

    Jan 1, 2002

  • AUSIMM
    Long Rockbolt Support at New Broken Hill Consolidated Limited

    Stope back conditions in the cut-and-fill stopes at New Broken Hill Consolidated Limited often deteriorate to such an extent that, because conventional rockbolts are not able to maintain safe working

    Jan 1, 1974

  • SME
    Design Principles for Soft Ground Cutterheads

    By Werner Burger

    The last decade has witnessed a rapid development and application of slurry and EPB type tunnel boring machines. Both soft ground types are able to excavate tunnels in unstable ground conditions below

    Jan 1, 2007

  • SME
    Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)

    By M. L. Harris

    In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo

    Jan 1, 2008

  • AUSIMM
    Timbering and its Importance in Making Estimates of Cost

    The importance of timbering, not only from a financial point of view but from an actual mining point of view, is so often overlooked or slightly glossed over by the average expert and investor, that I

    Jan 1, 1901

  • IOM3
    Fused-salt electrorefining of bismuth-lead alloys in a recessed-channel cell

    By F. Tailoka

    Bi was electrorefined from alloys containing 10-90 wt% Pb, together with Cu and Ag as minor impurities, in a basic cell and in a recessed-channel cell with 27.5:72.5 NaCl-PbCl electrolyte at 450-470 d

    Aug 1, 1995