Sampling Quality Assurance and Quality Control Requirements for Mining ProjectsThe creation of an accurate and precise enough database requires the collection of many representative samples, subsampling and assaying them without destroying their integrity. The selection and impl
Mar 1, 2010
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground ConditionsBy M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014
-
Reassessing Rehabilitation Objectives and Targets for Mature Mining Operations in QueenslandBy T R. Anderson, A R. Butler
Haymont (2012) notes that in parts of Australia significant areas of mining disturbance cannot be relinquished. In Queensland it has been estimated that by 2010, just 0.3 per cent 507 ha of mining dis
Jun 28, 2016
-
Optimisation of Operating Parameters for Cyanidation of Sulfide-Bearing Gold Flotation Tailings in order to Prevent the Impact of CyanicidesBy B Levasseur, C Olsen, E Ghasemian Langeroudi, F Larachi, F Safizadeh, C Gagnon
Gold recovery by the cyanidation process is often accompanied by the leaching of other species. This leads to the depletion of the level of free cyanide and oxygen available for gold cyanidation. The
Sep 26, 2013
-
Capital Expenditure Modelling for Strategic Mine SchedulingBy L Blackwell
Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea
Nov 24, 2014
-
A Cost Benefit Analysis to Explore the Optimal Number of Blast Movement Monitoring LocationsBy J Loeb, D Thornton
Blast movement measurement is a key component of grade control, enabling mines to carry all of the precision involved in locating ore blocks, through a chaotic blast, to production. A monitoring syste
Aug 18, 2014
-
Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, AustraliaBy A Fowler
The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit
Aug 22, 2011
-
Rewriting the rule book – geology organisational designBy T McLeod, B Catto
AngloGold Ashanti Australia’s (AGAA) Tropicana gold mine (TGM) geology department seized the rare opportunity of building a new geology department for a new operation: the philosophy, the people and t
Sep 20, 2017
-
Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)By D Horacek, I K. Sheppard
Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in
Jan 1, 2007
-
Bituminous Geomembranes in Mine ConstructionBy R McIlwraith, B Breul
"This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i
Jul 27, 2015
-
Multi-physical field coupling model development and parameter analysis of natural gas hydrate considering mechanical damageBy Z R. Guo, Y Qiu, X F. Wang
Mechanical damage leads to the increase of effective stress of sediments, and pore closure hinders the discharge of methane gas. Ignoring the influence of mechanical damage leads to an excessive predi
Nov 29, 2022
-
Updraught SinteringBy Green A. D M
The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima
Jan 1, 1964
-
Looking for an Adequate Drilling Spacing and Heterotopic Sampling û An Iron Ore ExampleBy D T. Ribeiro, J F. C L Costa, J C. Koppe
Drilling and sampling are responsible for most of the costs during mineral exploration, especially in multi-elements and polymetallic deposits, such as iron, manganese and bauxite deposits. On these d
Sep 26, 2011
-
Reducing the Energy Required in Grinding Clinker to Cement – Some Case StudiesBy H Benzer
Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6
Aug 8, 2011
-
Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle MineBy R Lachenicht, J Player, A Thompson, E Villaescusa
Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e
Jan 1, 2008
-
Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to ClosureBy J McCluskey, N Barros
"Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c
Nov 24, 2014
-
Cadia Expansion – The Impact of Installing High Pressure Grinding Rolls Prior to a Semi-autogenous Grinding MillBy D Engelhardt, G Lane
The Cadia mine has shifted from an open pit operation to the Cadia East underground panel cave. The resulting increase in milled tonnes, more competent ore and the decrease in fines production through
Sep 1, 2014
-
Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 MagnitudeBy R McIlwraith, B Breul
Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities
Jul 27, 2015
-
Using Quantile Regression in Cloud Transform SimulationThe cloud transform simulation is a technique used to generate realisations of correlated attributes. The principle of this technique is to partition the scatter diagram between the input attributes i
Sep 26, 2011
-
Full Cycle Tailings Management at Fosterville Gold MineBy L P. Gray
"From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro
Oct 10, 2016