Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old Concept

    By C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie

    "Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass

    Jun 15, 2016

  • AUSIMM
    Mount Morgan Gold-Copper Deposit:: The 1992 Perspective

    By Dean J. A, Taube A, White A. H, Messenger P. R, Jones I. W O, Huston D. L

    The 50 million tonne Mount Morgan gold-copper deposit (4.99 g/t Au, 0.72 per cent Cu) was an irregular pipe-like body of quartz and pyrite, with subordinate chalcopyrite, magnetite and gold. Mineralis

    Jan 1, 1993

  • AUSIMM
    Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to production

    By H Wright

    Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp

    Mar 29, 2023

  • AUSIMM
    Plant rejects disposal strategies applied at Caval Ridge open cut coal mine

    By J Li, H Hooi, D Payne

    Caval Ridge Mine (CVM) is one of the newly established open-cut coal mines of BHP in Queensland, where no tailings dam is planned to be built in order to minimise environmental impacts from mining act

    Jul 23, 2018

  • AUSIMM
    Orebody Delineation and Reserve Estimation ù Seeking Common Sense from Extensive Investment in Fact

    The organisers of this function have suggested that this presentation should accomplish the following broad goals:set the technical tone for the conference to follow, implying some discussion of the æ

    Jan 1, 2000

  • AUSIMM
    Water Recycling and Frugal Water Use

    Water rights and availability are extremely contentious issues in many mining regions around the world, in some instances leading to violent confrontation. This situation has the potential to only get

    Sep 13, 2010

  • AUSIMM
    Reduction Kinetics and Mechanism of Pellets Prepared from High-chromium Vanadium-titanium Magnetite Concentrate

    By P N. Duan, Z G. Liu, M S. Chu, X X. Xue, B Liu, G J. Cheng, T Jiang, J X. Liu

    High-chromium vanadium-titanium magnetite has not been exploited and made full use of on a large scale so far due to the immature utilisation technology and the reality that the utilisation efficiency

    Jul 13, 2015

  • AUSIMM
    Mine reconciliation standardisation – R Factor Series

    By R Hargreaves, T Elkington, W J. Shaw, G W. Booth

    Every day, around the world, thousands of tons of ore are loaded onto ships completing the miningproduction process and starting a multimillion-dollar economic transactions process. These transactions

    Mar 22, 2022

  • AUSIMM
    Analysis on crack distribution and evolution characteristics of gangue backfilled working face roof

    By X Y. Ma, X G. Tian, P F. Zhang, T B. Zhao, Z H. Li, Z Y. Fu

    This study analysed the fracture characteristics and movement process of goaf roofs under the condition of gangue backfilled mining, based on the engineering conditions of Tangshan Mine F5001 gangue b

    Nov 29, 2022

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Minerals Processing Automation Technology in 2007

    By R A. Medower

    This paper provides a glimpse into the future of minerals processing with emphasis on æAutomation InnovationsÆ for the new millennium, particularly those involving advanced process control and innovat

    Jan 1, 2000

  • AUSIMM
    Development Aspects of the Golden Cross Project

    Permitting, engineering and evaluation, detailed design and construction aspects of the Golden Cross goldmining project in New Zealand are briefly reviewed. The extremely lengthy and complicated gover

    Jan 1, 1990

  • AUSIMM
    Geostatistical Estimation of the Southern Lignites

    In the estimation of reserves the known values of the variables of interest from surrounding drill holes are used to compute or estimate the unknown value of the orebody over a given region or at a gi

    Jan 1, 1983

  • AUSIMM
    Is it so Hard? Getting the Balance Right

    Project approvals are the key mechanism to balance the environmental, social and economic aspects of a project. The assessment approaches vary significantly between states, with some having a strong e

    Jun 1, 2010

  • AUSIMM
    Temperature Sensitive Polymers as Efficient and Selective Flotation Collectors

    Temperature Sensitive Polymers as Efficient and Selective Flotation Collectors

    Sep 13, 2010

  • AUSIMM
    Temporary Support Design for the Largest Road Caverns Ever Built in Australia – The Lutwyche Caverns

    By N McKenzie, E Taylor, S V. L Barrett, H Lagger, A Purwodihardjo

    This paper discusses the temporary support design methodology for the largest road caverns ever built in Australia—the Lutwyche Caverns—part of the Airport Link project in Brisbane, Australia. The Lut

    Sep 17, 2014

  • AUSIMM
    Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    By Hughes J. C

    THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia

    Jan 1, 1922

  • AUSIMM
    A Tracer Study of Discharge Segregation from a Paul Wurth Hopper

    By Jones JJ

    A laboratory study of size segregation is described using a model of a Paul Wurth hopper industrailly employed for blast furnace charg- ing purposes. Experimental charge materials used in the study

    Jan 1, 1984

  • AUSIMM
    Blasting of High Density Ores

    By Grieve BL

    For a blast to be successful both heave and fragmentation must be satisfactory. Amongst the major factors influencing blasting are rock properties. This paper considers the effect of rock density

    Jan 1, 1978

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988