    The Practical Method of Handling Methane in a Fully Mechanized High Output Coal Face

    By Yuanping H

    There is a practical method of handling methane in a fully mechanized high output coal face when the methane outflow rate from the face is too high to be handled by ventilation alone, a combined m

    Jan 1, 1988

  • AUSIMM
    Construction and Utilisation of the Olympic Dam Service Decline

    The mining production rate of two million tonnes per annum at Olympic Dam required greater servicing capacity than was available with the existing Whenan Shaft. To increase servicing capability a

    Jan 1, 1988

  • AUSIMM
    ImPact ù Extending Wireless LAN Technology Underground

    By D Kent, J Kirkpatrick

    The mining industry has long wanted a single communication back bone to cover the majority of their requirements underground. The convergence of communication technologies in the office/surface enviro

    Jan 1, 2005

  • AUSIMM
    Novel Agglomeration Technology

    A form of wet pelletization is described where the bridging of the individual particles is achieved by a second liquid phase that pref- erentially wets the suspended solid particles. The phenomenon

    Jan 1, 1974

  • AUSIMM
    Education needs for Research and Industrial Practice in Geological Engineering

    Geological. engineering is a field of engineering practice concerned with design and construction of excavations and structures in soil and rock masses. The role of geological engineering in mining

    Jan 1, 1986

  • AUSIMM
    Discussion of the Results of Coal Drilling at Mount Davy

    This paper will be a discussion of the geological exploration and drilling carried out on the Mt Davy Block, Greymouth Coalfield. A brief summary of the geology of the Greymouth Coalfield will be giv

    Jan 1, 1979

  • AUSIMM
    Geophysical Characteristics, Deep Structure, Magmatism and Metallogeny of the Pacific Belt (cb9a84ed-c170-4df7-9e0a-0f6710234aaf)

    By Maslov LA

    We have considered the following characteristics of the crust and upper mantle of the Pacific Belt: seismic wave velocit> anomalies, mechanical stress and shear deformation rate fields, heat flow and

    Jan 1, 1995

  • AUSIMM
    Microtunnelling Solution for Bulimba Creek Trunk Sewer

    By A Domanti, C Jewkes

    This paper describes the design and constructability issues investigated in the selection of a trenchless solution in comparison to trenched construction options as part of a scoping study for the aug

    Jan 1, 2008

  • AUSIMM
    Blending of Coals for Coking

    It is no longer satisfactory to assess the value of a coking coal on its intrinsic properties alone, its value depends upon its behaviour as a component in a blend. No single test can be used to ma

    Jan 1, 1980

  • AUSIMM
    Shotcrete Lining Design for Underground Excavations in Rock û The Current State of Practice

    By B Bendtsen, L McQueen

    The use of shotcrete as an efficient means of both temporary and permanent ground support has continued to grow over the last 30 years, with its use underground now commonplace around the world. Howev

    Jan 1, 2008

  • AUSIMM
    The selection, commissioning, and evaluation of a large diameter, variable speed ball mill at Bougainville Copper Limited

    By Clark G

    The latest addition to the grinding circuit at Bougainville Copper Limited is another 5.5m by 7.3m primary mill (No.13). The mill can operate in a primary or secondary mode. Its distinguishing fea

    Jan 1, 1986

  • AUSIMM
    Geology of the Ladolam Gold Deposit Lihir Island, Papua New Guinea

    By Ballantyne GH

    The Ladolam gold deposit on Lihir Island, in Papua New Guinea, is a large disseminated gold deposit hosted by hydrothermal breccias. The deposit occurs in the cupola zone of a 350,000 year old mon

    Jan 1, 1987

  • AUSIMM
    The Design and Construction of the Excavation for the Hoppers Crossing Pump Wells

    By Nichol R

    - PART A The Hoppers Crossing Pumping Station is one of the principal components of the Western Trunk Sewer Project which replaces the 90 year old Main Outfall Sewer and will convey 60% of Melbour

    Jan 1, 1987

  • AUSIMM
    Coals to Newcastle the PWCS Ship Unloading System

    The design and construction of a 2.5 million tonne per annum ship unloading system at the PWCS export coal terminal in Newcastle, NSW, has further increased the flexibility and sophistication of A

    Jan 1, 1987

  • AUSIMM
    Model Study of the Stability of the Rock Surrounding A Tunnel

    By Junpeng L, Huiguo Q

    Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w

    Jan 1, 1987

  • AUSIMM
    Resource Estimation Approaches for Several Precious Metal Deposits Developed by Placer Group on the Pacific Rim

    The process of resource estimation of large precious metal deposits is illustrated by reference to major deposits now being mined or developed by Placer.The estimation procedure commences with buildin

    Jan 1, 1990

  • AUSIMM
    High Intensity Reactor Systems for Smelting of Base and Precious Metals

    The factors affecting performance of base and precious metal smelting and converting processes are considered in relation to reactor characteristics. The chemical differences between processes are rel

    Jan 1, 1992

  • AUSIMM
    In-pit Dust Control at Mt. Whaleback, Newman, W.A.

    By Loo R

    The Paper discusses the size and extent of in-pit dust suppression problems created by iron ore mining in the Pilbara region of Western Australia. Dust problems associated with drilling, loading, h

    Jan 1, 1979

  • AUSIMM
    Diversion Tunnels for the Magat River Multi-purpose Project-Geotechnical Aspects

    The paper describes the geotechnical as- pects of design and construction of two 12 m diameter concrete lined tunnels from the start of design to completion of construction. Prob- lems occurred due

    Jan 1, 1981

  • AUSIMM
    Chlorine Based Flooded Pit Leaching of Oxide Gold Deposits

    The capacity of chlorine based solutions to rapidly and effectively dissolve coarse gold in oxide ores is well established. The inherent advantages of chlorine are high dissolution rates (10 - 100 tim

    Jan 1, 1992